EP3422797 - METHOD AND USER EQUIPMENT FOR REQUESTING CONNECTION TO NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.07.2021 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 07.08.2020 | ||
Former | Grant of patent is intended Status updated on 06.04.2020 | ||
Former | Request for examination was made Status updated on 30.11.2018 | ||
Former | The international publication has been made Status updated on 01.09.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2019/01] | Inventor(s) | 01 /
CHUN, Sungduck IP Center LG Electronics Inc. 19 Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | [2019/01] | Representative(s) | Katérle, Axel Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstraße 2 81541 München / DE | [2019/01] | Application number, filing date | 17756861.5 | 24.02.2017 | [2019/01] | WO2017KR02065 | Priority number, date | US201662300085P | 26.02.2016 Original published format: US 201662300085 P | US201662347051P | 07.06.2016 Original published format: US 201662347051 P | US201662370251P | 03.08.2016 Original published format: US 201662370251 P | [2019/01] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017146523 | Date: | 31.08.2017 | Language: | KO | [2017/35] | Type: | A1 Application with search report | No.: | EP3422797 | Date: | 02.01.2019 | Language: | EN | [2019/01] | Type: | B1 Patent specification | No.: | EP3422797 | Date: | 09.09.2020 | Language: | EN | [2020/37] | Search report(s) | International search report - published on: | KR | 31.08.2017 | (Supplementary) European search report - dispatched on: | EP | 06.11.2019 | Classification | IPC: | H04W48/02, H04W88/04 | [2019/49] | CPC: |
H04W48/02 (EP,US);
H04W48/14 (US);
H04W76/10 (US);
H04W8/24 (US);
H04W88/04 (EP,US)
|
Former IPC [2019/01] | H04W76/04, H04W76/02, H04W88/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND BENUTZERGERÄT ZUR ANFORDERUNG DER VERBINDUNG MIT EINEM NETZWERK | [2019/01] | English: | METHOD AND USER EQUIPMENT FOR REQUESTING CONNECTION TO NETWORK | [2019/01] | French: | PROCÉDÉ ET ÉQUIPEMENT UTILISATEUR DE REQUÊTE DE CONNEXION À UN RÉSEAU | [2019/01] | Entry into regional phase | 31.08.2018 | Translation filed | 31.08.2018 | National basic fee paid | 31.08.2018 | Search fee paid | 31.08.2018 | Designation fee(s) paid | 31.08.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 31.08.2018 | Amendment by applicant (claims and/or description) | 31.08.2018 | Examination requested [2019/01] | 07.04.2020 | Communication of intention to grant the patent | 30.07.2020 | Fee for grant paid | 30.07.2020 | Fee for publishing/printing paid | 30.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.06.2021 | No opposition filed within time limit [2021/33] | Fees paid | Renewal fee | 21.02.2019 | Renewal fee patent year 03 | 24.02.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.02.2017 | AL | 09.09.2020 | AT | 09.09.2020 | CY | 09.09.2020 | CZ | 09.09.2020 | DK | 09.09.2020 | EE | 09.09.2020 | ES | 09.09.2020 | FI | 09.09.2020 | HR | 09.09.2020 | IT | 09.09.2020 | LT | 09.09.2020 | LV | 09.09.2020 | MC | 09.09.2020 | MK | 09.09.2020 | MT | 09.09.2020 | PL | 09.09.2020 | RO | 09.09.2020 | RS | 09.09.2020 | SE | 09.09.2020 | SI | 09.09.2020 | SK | 09.09.2020 | SM | 09.09.2020 | TR | 09.09.2020 | NL | 23.09.2020 | BG | 09.12.2020 | NO | 09.12.2020 | GR | 10.12.2020 | IS | 09.01.2021 | PT | 11.01.2021 | GB | 24.02.2021 | IE | 24.02.2021 | LU | 24.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | [2024/42] |
Former [2024/29] | HU | 24.02.2017 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
MK | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
TR | 09.09.2020 | ||
NL | 23.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2024/23] | HU | 24.02.2017 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
MK | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
NL | 23.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/33] | HU | 24.02.2017 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
NL | 23.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/30] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
NL | 23.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/29] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
NL | 23.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/34] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/08] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
GB | 24.02.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
IE | 24.02.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/48] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
LU | 24.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/37] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/36] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/28] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/25] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/23] | AT | 09.09.2020 | |
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/22] | CZ | 09.09.2020 | |
EE | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/21] | FI | 09.09.2020 | |
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/10] | FI | 09.09.2020 | |
HR | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/09] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/08] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
Former [2021/07] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
NO | 09.12.2020 | Documents cited: | Search | [A]WO2010150779 (NTT DOCOMO INC [JP], et al) [A] 1,9 * abstract ** paragraph [0051] * | International search | [A]WO2012091418 (KOREA ELECTRONICS TELECOMM [KR], et al) [A] 1-16 * See paragraph [131]; claim 17; and figure 7. *; | [A]WO2012091420 (KOREA ELECTRONICS TELECOMM [KR], et al) [A] 1-16* See paragraphs [55]-[61]; and figure 2. *; | [A]WO2016024773 (LG ELECTRONICS INC [KR]) [A] 1-16 * See paragraph [167], claim 1; and figure 18. *; | [A] - SAMSUNG, "eD2D Relay: Inter Layer Interaction regarding Threshold Checking", R2-161222, 3GPP TSG-RAN2#93 meeting, St Julian's, Malta, (20160205), XP051065595 [A] 1-16 * See section 2. * | [A] - FENG, JUNYI, "Device-to-Device Communications in LTE-Advanced Network", tel.archives, (20140425), pages 1 - 96, URL: https://tel.archives-ouvertes.fr/tel-00983507, XP055536623 [A] 1-16 * See page 18. * |