EP3513418 - MECHANISM FOR OPENING AND CLOSING A CIRCUIT BREAKER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.12.2022 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 24.12.2021 | ||
Former | Grant of patent is intended Status updated on 05.09.2021 | ||
Former | Request for examination was made Status updated on 21.06.2019 | ||
Former | The international publication has been made Status updated on 24.03.2018 | ||
Former | unknown Status updated on 22.09.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Eaton Intelligent Power Limited 30 Pembroke Road Dublin 4 / IE | [2019/30] | Inventor(s) | 01 /
LAMMERS, Arend Louis Bouwmeesterstraat 117 7558 TV Hengelo / NL | 02 /
MD, Jinto Manickathan House Manjapra P O Near Chandrapura Ernakulum District Kerala 683581 / IN | 03 /
VATHARKAR, Akshay D1/12 Shweta Society Near Rajaram Bride Pune 411030 / IN | [2019/47] |
Former [2019/30] | 01 /
LAMMERS, Arend Louis Bouwmeesterstraat 117 7558 TV Hengelo / NL | ||
02 /
MD, Jinto Deccan Gold Society Tuljabhavani Nagar Kharadi Pune 411014 / IN | |||
03 /
VATHARKAR, Akshay D1/12 Shweta Society Near Rajaram Bride Pune 411030 / IN | Representative(s) | Eaton IP Group EMEA c/o Eaton Intellectual Power Limited Eaton House 30 Pembroke Road Dublin 4 / IE | [N/P] |
Former [2019/30] | Eaton IP Group EMEA c/o Eaton Industries Manufacturing GmbH Route de la Longeraie 7 1110 Morges / CH | Application number, filing date | 17765457.1 | 14.09.2017 | [2019/30] | WO2017EP73169 | Priority number, date | IN201611031325 | 14.09.2016 Original published format: IN201611031325 | GB20160020240 | 29.11.2016 Original published format: GB 201620240 | [2019/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018050760 | Date: | 22.03.2018 | Language: | EN | [2018/12] | Type: | A1 Application with search report | No.: | EP3513418 | Date: | 24.07.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.03.2018 takes the place of the publication of the European patent application. | [2019/30] | Type: | B1 Patent specification | No.: | EP3513418 | Date: | 26.01.2022 | Language: | EN | [2022/04] | Search report(s) | International search report - published on: | EP | 22.03.2018 | Classification | IPC: | H01H3/30, H01H3/42 | [2019/30] | CPC: |
H01H3/30 (EP,GB,US);
H01H3/42 (EP,US);
H01H2003/3094 (EP,GB,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MECHANISMUS ZUM ÖFFNEN UND SCHLIESSEN EINES LEISTUNGSSCHALTERS | [2019/30] | English: | MECHANISM FOR OPENING AND CLOSING A CIRCUIT BREAKER | [2019/30] | French: | MÉCANISME D'OUVERTURE ET DE FERMETURE D'UN DISJONCTEUR | [2019/30] | Entry into regional phase | 13.03.2019 | National basic fee paid | 13.03.2019 | Designation fee(s) paid | 13.03.2019 | Examination fee paid | Examination procedure | 13.03.2019 | Examination requested [2019/30] | 13.03.2019 | Date on which the examining division has become responsible | 21.10.2019 | Amendment by applicant (claims and/or description) | 06.09.2021 | Communication of intention to grant the patent | 21.12.2021 | Fee for grant paid | 21.12.2021 | Fee for publishing/printing paid | 21.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 27.10.2022 | No opposition filed within time limit [2023/01] | Fees paid | Renewal fee | 19.09.2019 | Renewal fee patent year 03 | 17.09.2020 | Renewal fee patent year 04 | 21.09.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.09.2017 | AL | 26.01.2022 | AT | 26.01.2022 | CY | 26.01.2022 | CZ | 26.01.2022 | DK | 26.01.2022 | EE | 26.01.2022 | ES | 26.01.2022 | FI | 26.01.2022 | HR | 26.01.2022 | IT | 26.01.2022 | LT | 26.01.2022 | LV | 26.01.2022 | MC | 26.01.2022 | MK | 26.01.2022 | MT | 26.01.2022 | RO | 26.01.2022 | RS | 26.01.2022 | SI | 26.01.2022 | SK | 26.01.2022 | SM | 26.01.2022 | BG | 26.04.2022 | NO | 26.04.2022 | GR | 27.04.2022 | IS | 26.05.2022 | PT | 26.05.2022 | GB | 14.09.2022 | IE | 14.09.2022 | LU | 14.09.2022 | SE | 15.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | FR | 30.09.2022 | LI | 30.09.2022 | NL | 01.10.2022 | [2024/42] |
Former [2024/27] | HU | 14.09.2017 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
MK | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 14.09.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
SE | 15.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2024/21] | HU | 14.09.2017 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 14.09.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
SE | 15.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2024/18] | HU | 14.09.2017 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 14.09.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
SE | 15.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/47] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 14.09.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
SE | 15.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/42] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
SE | 15.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/36] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
SE | 15.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/35] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/33] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 14.09.2022 | ||
LU | 14.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/30] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
LU | 14.09.2022 | ||
NL | 01.10.2022 | ||
Former [2023/22] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/10] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/01] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/49] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/48] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/47] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/46] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/42] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/39] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/36] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/35] | ES | 26.01.2022 | |
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
RS | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/34] | ES | 26.01.2022 | |
LT | 26.01.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/33] | LT | 26.01.2022 | |
NO | 26.04.2022 | Cited in | International search | [Y]EP0045546 (ANSALDO SPA [IT]) [Y] 2* page 5 - page 14; figures 1-5 *; | [IY]EP0294561 (MITSUBISHI ELECTRIC CORP [JP]) [I] 1,3-7 * column 1, line 14 - column 7, line 45; figures 1-7 * [Y] 2 |