blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3410625

EP3410625 - TECHNIQUES FOR TRANSMISSION AND RECEPTION OF CONTROL INFORMATION IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
Former [2018/49]METHOD FOR TRANSMITTING AND RECEIVING CONTROL INFORMATION IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR
[2020/18]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  13.04.2020
FormerRequest for examination was made
Status updated on  02.11.2018
FormerThe international publication has been made
Status updated on  22.09.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
LG Electronics Inc.
128 Yeoui-daero
Yeongdeungpo-Gu
Seoul 07336 / KR
[2018/49]
Inventor(s)01 / SEO, Inkwon
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
02 / KIM, Kijun
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
03 / AHN, Joonkui
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
04 / YI, Yunjung
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
 [2018/49]
Representative(s)Maikowski & Ninnemann Patentanwälte Partnerschaft mbB
Postfach 15 09 20
10671 Berlin / DE
[2018/49]
Application number, filing date17767001.516.03.2017
[2018/49]
WO2017KR02845
Priority number, dateUS201662309435P16.03.2016         Original published format: US 201662309435 P
US201762455553P06.02.2017         Original published format: US 201762455553 P
[2018/49]
Filing languageKO
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2017160100
Date:21.09.2017
Language:KO
[2017/38]
Type: A2 Application without search report 
No.:EP3410625
Date:05.12.2018
Language:EN
[2018/49]
Type: B1 Patent specification 
No.:EP3410625
Date:26.08.2020
Language:EN
[2020/35]
Search report(s)International search report - published on:KR02.08.2018
(Supplementary) European search report - dispatched on:EP21.08.2019
ClassificationIPC:H04L5/00, H04B7/06, H04W72/04, H04W72/12
[2019/38]
CPC:
H04L5/0053 (EP,US); H04W72/23 (US); H04B7/0617 (US);
H04W72/1273 (US); H04W72/0446 (US)
Former IPC [2018/49]H04L5/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:TECHNIKEN ZUM SENDEN UND EMPFANGEN VON STEUERINFORMATIONEN IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM[2020/18]
English:TECHNIQUES FOR TRANSMISSION AND RECEPTION OF CONTROL INFORMATION IN A WIRELESS COMMUNICATION SYSTEM[2020/18]
French:TECHNIQUES DE TRANSMISSION ET RÉCEPTION D'INFORMATIONS DE COMMANDE DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2020/18]
Former [2018/49]VERFAHREN ZUM SENDEN UND EMPFANGEN VON STEUERINFORMATIONEN IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM UND VORRICHTUNG DAFÜR
Former [2018/49]METHOD FOR TRANSMITTING AND RECEIVING CONTROL INFORMATION IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR
Former [2018/49]PROCÉDÉ D'ÉMISSION ET DE RÉCEPTION D'INFORMATIONS DE COMMANDE DANS UN SYSTÈME DE COMMUNICATION SANS FIL ET APPAREIL CORRESPONDANT
Entry into regional phase30.08.2018Translation filed 
30.08.2018National basic fee paid 
30.08.2018Search fee paid 
30.08.2018Designation fee(s) paid 
30.08.2018Examination fee paid 
Examination proceduredeletedDate on which the examining division has become responsible
30.08.2018Examination requested  [2018/49]
14.04.2020Communication of intention to grant the patent
15.07.2020Fee for grant paid
15.07.2020Fee for publishing/printing paid
15.07.2020Receipt of the translation of the claim(s)
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
26.03.2019Renewal fee patent year 03
24.03.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.03.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/29]
Former [2024/23]HU16.03.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/33]HU16.03.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/30]AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/11]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/09]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
GB16.03.2021
IE16.03.2021
LU16.03.2021
Former [2022/07]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE16.03.2021
Former [2021/45]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/21]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Documents cited:Search[A]US2014269595  (LEE JIHYUN [KR], et al) [A] 1-15 * paragraph [0060] - paragraph [0072] * * paragraph [0100] - paragraph [0107] *;
 [A]US2015271788  (KIM MYOUNGSEOB [KR], et al) [A] 1-15 * paragraph [0008] - paragraph [0010] * * paragraph [0042] - paragraph [0120] * * claims 1-9 *;
 [A]  - LEVANEN TONI ET AL, "Dense small-cell networks: Rethinking the radio interface beyond LTE-advanced", 1ST INTERNATIONAL CONFERENCE ON 5G FOR UBIQUITOUS CONNECTIVITY, ICST, (20141126), doi:10.4108/ICST.5GU.2014.258115, pages 163 - 169, XP032735039 [A] 1-15 * Sections I-V;; figures 2,3 *

DOI:   http://dx.doi.org/10.4108/icst.5gu.2014.258115
International search[A]US2013242904  (SARTORI PHILIPPE [US], et al) [A] 1-15 * See paragraphs [0037]-[0045]. *;
 [A]  - HUAWEI et al., "Remaining Details for M-PDCCH Search Space Design and TP for 36.211 and 36.213", R1-160309, 3GPP TSG RAN WG1 Meeting #84, St.. Julian's, Malta, (20160206), XP051064127 [A] 1-15 * See section 9.1,5. *
 [A]  - NOH , TAE GYUN et al., "Low-Latency Technologies and Standardization for 5G Mobile Communications = 5G 저지연 기술 및 표준화 동향", Electronics and Telecommunications Trends, vol. 31, no. 1, ISSN 1225-6455, (20160201), pages 78 - 85, URL: http://www.ndsl.kr/ndsl/commons/util/ndslOriginalView.do?dbt=JAKO&cn=JAKO201652057195950&oCn=JAKO201652057195950&pageCode=PG11&journal=NJOU00291002, XP009512693 [A] 1-15 * See pages 81-82; and figure 3. *
 [A]  - HUAWEI et al., "NB-PDCCH Search Space", R1-160320, 3GPP TSG RAN WG1 Meeting #84, St. Julian's, Malta, (20160206), XP051064137 [A] 1-15 * See sections 3-4. *
 [A]  - SMEE, JOHN, "5G Vision and Design", QUALCOMM, IEEE 5G Summit Silicon Valley, (20151116), URL: hltp://www.5gsuminit.org/docs/slides/John-Smee-5GSummit-SiliconValley-11162015.pdf, XP055537519 [A] 1-15 * See page 11. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.