EP3510487 - COHERENT INTERCONNECT POWER REDUCTION USING HARDWARE CONTROLLED SPLIT SNOOP DIRECTORIES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.12.2023 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 20.01.2023 | ||
Former | Grant of patent is intended Status updated on 29.09.2022 | ||
Former | Examination is in progress Status updated on 14.05.2021 | ||
Former | Request for examination was made Status updated on 14.06.2019 | ||
Former | The international publication has been made Status updated on 23.03.2018 | ||
Former | unknown Status updated on 29.09.2017 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2019/29] | Inventor(s) | 01 /
AVOINNE, Christophe 5775 Morehouse Drive San Diego California 92121-1714 / US | 02 /
MONTPERRUS, Luc 5775 Morehouse Drive San Diego California 92121-1714 / US | 03 /
BOUCARD, Philippe 5775 Morehouse Drive San Diego California 92121-1714 / US | 04 /
GUPTA, Rakesh Kumar 5775 Morehouse Drive San Diego California 92121-1714 / US | [2019/29] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2023/08] |
Former [2019/29] | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 17768921.3 | 07.09.2017 | [2019/29] | WO2017US50450 | Priority number, date | US201615259697 | 08.09.2016 Original published format: US201615259697 | [2019/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018049010 | Date: | 15.03.2018 | Language: | EN | [2018/11] | Type: | A1 Application with search report | No.: | EP3510487 | Date: | 17.07.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.03.2018 takes the place of the publication of the European patent application. | [2019/29] | Type: | B1 Patent specification | No.: | EP3510487 | Date: | 22.02.2023 | Language: | EN | [2023/08] | Search report(s) | International search report - published on: | EP | 15.03.2018 | Classification | IPC: | G06F12/0831, G06F1/32, G06F1/3206, G06F1/3234, G06F1/3287 | [2022/36] | CPC: |
G06F1/3206 (EP,US);
G06F12/0833 (EP,KR,US);
G06F1/3296 (KR,US);
G06F1/3275 (EP,US);
G06F1/3287 (EP,US);
G06F12/0893 (KR);
|
Former IPC [2019/29] | G06F12/0831, G06F1/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOHÄRENTE VERBINDUNGSLEISTUNGSREDUZIERUNG UNTER VERWENDUNG VON HARDWARE-GESTEUERTEN SPLIT-SNOOP-VERZEICHNISSEN | [2019/29] | English: | COHERENT INTERCONNECT POWER REDUCTION USING HARDWARE CONTROLLED SPLIT SNOOP DIRECTORIES | [2019/29] | French: | RÉDUCTION COHÉRENTE DE PUISSANCE D'INTERCONNEXION À L'AIDE DE RÉPERTOIRES DE SURVEILLANCE RÉPARTIS COMMANDÉS PAR LE MATÉRIEL | [2019/29] | Entry into regional phase | 29.01.2019 | National basic fee paid | 29.01.2019 | Designation fee(s) paid | 29.01.2019 | Examination fee paid | Examination procedure | 12.06.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 29.01.2019 | Examination requested [2019/29] | 29.01.2019 | Date on which the examining division has become responsible | 09.10.2019 | Amendment by applicant (claims and/or description) | 14.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 23.06.2021 | Reply to a communication from the examining division | 30.09.2022 | Communication of intention to grant the patent | 11.01.2023 | Fee for grant paid | 11.01.2023 | Fee for publishing/printing paid | 11.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 23.11.2023 | No opposition filed within time limit [2024/05] | Fees paid | Renewal fee | 11.09.2019 | Renewal fee patent year 03 | 11.09.2020 | Renewal fee patent year 04 | 09.09.2021 | Renewal fee patent year 05 | 09.09.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.02.2023 | CZ | 22.02.2023 | DK | 22.02.2023 | EE | 22.02.2023 | ES | 22.02.2023 | FI | 22.02.2023 | HR | 22.02.2023 | IT | 22.02.2023 | LT | 22.02.2023 | LV | 22.02.2023 | MC | 22.02.2023 | NL | 22.02.2023 | PL | 22.02.2023 | RO | 22.02.2023 | RS | 22.02.2023 | SE | 22.02.2023 | SI | 22.02.2023 | SK | 22.02.2023 | SM | 22.02.2023 | NO | 22.05.2023 | GR | 23.05.2023 | IS | 22.06.2023 | PT | 22.06.2023 | IE | 07.09.2023 | LU | 07.09.2023 | CH | 30.09.2023 | [2024/34] |
Former [2024/33] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
IE | 07.09.2023 | ||
LU | 07.09.2023 | ||
Former [2024/28] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
LU | 07.09.2023 | ||
Former [2024/26] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
LU | 07.09.2023 | ||
Former [2024/25] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
LU | 07.09.2023 | ||
Former [2024/11] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/50] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/49] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/48] | AT | 22.02.2023 | |
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/46] | AT | 22.02.2023 | |
DK | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/39] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/38] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/37] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/36] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/35] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
NO | 22.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/34] | ES | 22.02.2023 | |
LT | 22.02.2023 | ||
RS | 22.02.2023 | ||
PT | 22.06.2023 | ||
Former [2023/33] | ES | 22.02.2023 | |
LT | 22.02.2023 | Cited in | International search | [A]US2008077813 (KELLER JAMES B [US], et al) [A] 1-30 * paragraph [0006] - paragraph [0009] * * paragraph [0022] - paragraph [0039] * * paragraph [0047] - paragraph [0050] * * figures 1-5 *; | [YA]US2014189411 (KANCHANA MUDITHA [US], et al) [Y] 2-5,7,11-14,16,18,21-24,26,30 * paragraph [0006] - paragraph [0007] * * paragraph [0023] - paragraph [0034] * * paragraph [0040] - paragraph [0046] * * figures 1-5 * [A] 1,6,8-10,15,17,19,20,25,27-29; | [YA]US2014281275 (KRUCKEMYER DAVID ALAN [US], et al) [Y] 8,17,27 * paragraph [0003] - paragraph [0008] * * paragraph [0025] - paragraph [0061] * * figures 1-14 * [A] 1-7,9-16,18-26,28-30; | [A]US2015268711 (RAMANI SUNDAR [IN], et al) [A] 1-30 * paragraph [0020] - paragraph [0042] * * paragraph [0051] - paragraph [0053] * * paragraph [0080] - paragraph [0093] ** figures 1-9 *; | [XY]US2016188471 (FORREST CRAIG STEPHEN [US], et al) [X] 1,6,9,10,15,19,20,25,28,29 * paragraph [0003] - paragraph [0006] * * paragraph [0026] - paragraph [0038] * * figures 1-7 * [Y] 2-5,7,8,11-14,16-18,21-24,26,27,30 |