EP3424255 - SYSTEMS AND METHODS FOR DISTRIBUTED OPEN-LOOP MULTI-USER CO-OPERATIVE MULTI-POINT (COMP) SCHEDULING AND TRANSMISSION [Right-click to bookmark this link] | |||
Former [2019/02] | SYSTEMS AND METHODS FOR DISTRIBUTED OPEN-LOOP MULTI-USER CO-OPERATIVE MULTI-POINT (CoMP) SCHEDULING AND TRANSMISSION | ||
[2022/47] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 31.03.2023 | ||
Former | Grant of patent is intended Status updated on 09.11.2022 | ||
Former | Examination is in progress Status updated on 19.03.2021 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The international publication has been made Status updated on 07.10.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/02] | Inventor(s) | 01 /
BAYESTEH, Alireza Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 02 /
VILAIPORNSAWAI, Usa Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 03 /
BALIGH, Mohammadhadi 149 Saltspring Drive Ottawa, Ontario K2M 0B1 / CA | 04 /
ZARIFI, Keyvan 294 Mojave Crescent Ottawa, Ontario K2S 0H7 / CA | 05 /
LIN, Yicheng Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | 06 /
TAHERZADEH BOROUJENI, Mahmoud 66 Sundback Lane Ottawa, Ontario K2L 2W8 / CA | [2019/15] |
Former [2019/04] | 01 /
BAYESTEH, Alireza 112 Beaverbrook Lane Ottawa, Ontario K2K 1L8 / CA | ||
02 /
VILAIPORNSAWAI, Usa Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | |||
03 /
BALIGH, Mohammadhadi 149 Saltspring Drive Ottawa, Ontario K2M 0B1 / CA | |||
04 /
ZARIFI, Keyvan 294 Mojave Crescent Ottawa, Ontario K2S 0H7 / CA | |||
05 /
LIN, Yicheng Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | |||
06 /
TAHERZADEH BOROUJENI, Mahmoud 66 Sundback Lane Ottawa, Ontario K2L 2W8 / CA | |||
Former [2019/02] | 01 /
BAYESTEH, Alireza 112 Beaverbrook Lane Ottawa, Ontario K2K 1L8 / CA | ||
02 /
VILAIPORNSAWAI, Usa 705-15 Woodridge Crescent Nepean, Ontario K2B 7T3 / CA | |||
03 /
BALIGH, Mohammadhadi 149 Saltspring Drive Ottawa, Ontario K2M 0B1 / CA | |||
04 /
ZARIFI, Keyvan 294 Mojave Crescent Ottawa, Ontario K2S 0H7 / CA | |||
05 /
LIN, Yicheng 401-2880 Carling Avenue Ottawa, Ontario K2B 7Z1 / CA | |||
06 /
TAHERZADEH BOROUJENI, Mahmoud 66 Sundback Lane Ottawa, Ontario K2L 2W8 / CA | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [2019/02] | Application number, filing date | 17773323.5 | 31.03.2017 | [2019/02] | WO2017CN79081 | Priority number, date | US201662316914P | 01.04.2016 Original published format: US 201662316914 P | US201615182007 | 14.06.2016 Original published format: US201615182007 | [2019/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017167293 | Date: | 05.10.2017 | Language: | EN | [2017/40] | Type: | A1 Application with search report | No.: | EP3424255 | Date: | 09.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.10.2017 takes the place of the publication of the European patent application. | [2019/02] | Type: | B1 Patent specification | No.: | EP3424255 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Search report(s) | International search report - published on: | CN | 05.10.2017 | (Supplementary) European search report - dispatched on: | EP | 22.02.2019 | Classification | IPC: | H04W72/04, H04L1/00, H04L5/00, H04L1/18, H04B7/024, H04W52/34 | [2022/47] | CPC: |
H04B7/024 (EP,US);
H04W72/23 (US);
H04B7/0452 (US);
H04B7/0623 (US);
H04B7/0632 (US);
H04L1/08 (US);
H04L1/1812 (US);
H04L1/1819 (EP,US);
H04L1/1861 (US);
H04L1/1896 (EP,US);
H04L27/2601 (US);
H04L5/0007 (EP,US);
H04L5/0035 (EP,US);
H04L5/0044 (EP,US);
H04L5/0048 (US);
H04L5/005 (US);
H04L5/0078 (EP,US);
H04L5/0094 (EP,US);
H04L5/0096 (EP,US);
H04W72/0446 (US);
H04W72/0453 (US);
H04W72/046 (US);
H04W72/0466 (US);
H04W72/0473 (US);
H04W72/20 (US);
H04W72/542 (US);
H04L1/0003 (EP,US);
H04L1/0009 (EP,US);
H04L5/0014 (EP,US);
H04L5/0026 (EP,US);
|
Former IPC [2019/13] | H04W72/04, H04L1/00, H04L5/00 | ||
Former IPC [2019/02] | H04W72/04, H04L1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEME UND VERFAHREN ZUR VERTEILTEN OFFENSCHLEIFIGEN KOOPERATIVEN MEHRPUNKT (COMP)-ZEITPLANUNG UND -ÜBERTRAGUNG FÜR MEHRERE NUTZER | [2019/02] | English: | SYSTEMS AND METHODS FOR DISTRIBUTED OPEN-LOOP MULTI-USER CO-OPERATIVE MULTI-POINT (COMP) SCHEDULING AND TRANSMISSION | [2022/47] | French: | SYSTÈMES ET PROCÉDÉS POUR UNE PROGRAMMATION ET UNE TRANSMISSION MULTIPOINT COLLABORATIVE MULTI-UTILISATEUR (MU-COMP) À BOUCLE OUVERTE DISTRIBUÉE | [2019/02] |
Former [2019/02] | SYSTEMS AND METHODS FOR DISTRIBUTED OPEN-LOOP MULTI-USER CO-OPERATIVE MULTI-POINT (CoMP) SCHEDULING AND TRANSMISSION | Entry into regional phase | 04.10.2018 | National basic fee paid | 04.10.2018 | Search fee paid | 04.10.2018 | Designation fee(s) paid | 04.10.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 04.10.2018 | Examination requested [2019/02] | 29.08.2019 | Amendment by applicant (claims and/or description) | 19.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 22.07.2021 | Reply to a communication from the examining division | 10.11.2022 | Communication of intention to grant the patent | 27.02.2023 | Fee for grant paid | 27.02.2023 | Fee for publishing/printing paid | 27.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 04.10.2018 | Renewal fee patent year 03 | 18.03.2020 | Renewal fee patent year 04 | 30.03.2021 | Renewal fee patent year 05 | 11.03.2022 | Renewal fee patent year 06 | 24.03.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 03.05.2023 | CZ | 03.05.2023 | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | IT | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | PT | 04.09.2023 | [2024/26] |
Former [2024/24] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/10] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/08] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/03] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/01] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/51] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/50] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/48] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
PT | 04.09.2023 | ||
Former [2023/46] | ES | 03.05.2023 | |
PT | 04.09.2023 | Documents cited: | Search | [XAI]US2011199985 (CAI ZHIJUN [US], et al) [X] 1-7,9-11,13-21 * paragraph [0041] - paragraph [0046] * * paragraph [0050] - paragraph [0058] * * paragraph [0070] - paragraph [0074] * [A] 8 [I] 12; | [A]US2015312074 (ZHU YUAN [CN], et al) [A] 8,15-17,19,20* paragraph [0023] - paragraph [0036] * | International search | [A]CN103095401 (SHANGHAI ALCATEL LUCENT CO LTD, et al) [A] 1-25 * the whole document *; | [A]CN103220069 (HUAWEI TECH CO LTD) [A] 1-25 * description, paragraphs [0026]-[0097] *; | [A]US2014050202 (BALIGH MOHAMMADHADI [CA], et al) [A] 1-25 * the whole document *; | [A]CN104335514 (ERICSSON TELEFON AB L M) [A] 1-25 * the whole document *; | [A]US2016087694 (VILAIPORNSAWAI USA [CA], et al) [A] 1-25 * the whole document *; | [A] - ZHU, JIANCHI et al., "A Practical Design of Downlink Coordinated Multi-Point Transmission for LTE-Advanced", IEEE, (20101231), XP055427226 [A] 1-25 * , the whole document * DOI: http://dx.doi.org/10.1109/VETECS.2010.5493628 | [A] - CATT., "On downlink control signaling for CoMP", 3GPP TSG RAN WGI Meeting #69, R1-122043, (20120525), XP050600333 [A] 1-25 * , the whole document * | by applicant | US2011199985 | US2015312074 |