EP3409040 - DYNAMIC ANTENNA REFERENCE SIGNAL TRANSMISSION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.06.2022 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 16.07.2021 | ||
Former | Grant of patent is intended Status updated on 25.03.2021 | ||
Former | Examination is in progress Status updated on 19.02.2020 | ||
Former | Request for examination was made Status updated on 02.11.2018 | ||
Former | The international publication has been made Status updated on 07.10.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states T-Mobile USA, Inc. 12920 SE 38th Street Bellevue, WA 98006-1350 / US | [2018/49] | Inventor(s) | 01 /
LIU, Jun c/o T-Mobile USA Inc. 12920 SE 38th Street Bellevue, WA 98006-1350 / US | [2018/49] | Representative(s) | Murgitroyd & Company 165-169 Scotland Street Glasgow G5 8PL / GB | [N/P] |
Former [2021/33] | Hanna Moore + Curley Garryard House 25-26 Earlsfort Terrace Dublin 2, D02 PX51 / IE | ||
Former [2018/49] | Hanna Moore + Curley Garryard House 25/26 Earlsfort Terrace Dublin 2, D02 PX51 / IE | Application number, filing date | 17776321.6 | 22.03.2017 | [2018/49] | WO2017US23529 | Priority number, date | US201615085056 | 30.03.2016 Original published format: US201615085056 | [2018/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017172433 | Date: | 05.10.2017 | Language: | EN | [2017/40] | Type: | A1 Application with search report | No.: | EP3409040 | Date: | 05.12.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.10.2017 takes the place of the publication of the European patent application. | [2018/49] | Type: | B1 Patent specification | No.: | EP3409040 | Date: | 18.08.2021 | Language: | EN | [2021/33] | Search report(s) | International search report - published on: | KR | 05.10.2017 | (Supplementary) European search report - dispatched on: | EP | 16.07.2019 | Classification | IPC: | H04W24/02, H04W16/28, H04B7/06, H04B7/024, H04W52/02 | [2019/33] | CPC: |
H04B7/024 (EP,US);
H04W52/325 (US);
H04B7/0608 (EP,US);
H04W4/06 (EP,US);
H04W52/0274 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2018/49] | H04W24/02, H04W16/28, H04B7/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | DYNAMISCHE ANTENNENREFERENZSIGNALÜBERTRAGUNG | [2018/49] | English: | DYNAMIC ANTENNA REFERENCE SIGNAL TRANSMISSION | [2018/49] | French: | ÉMISSION DE SIGNAL DE RÉFÉRENCE D'ANTENNE DYNAMIQUE | [2018/49] | Entry into regional phase | 30.08.2018 | National basic fee paid | 30.08.2018 | Search fee paid | 30.08.2018 | Designation fee(s) paid | 30.08.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 30.08.2018 | Examination requested [2018/49] | 06.01.2020 | Amendment by applicant (claims and/or description) | 24.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 26.06.2020 | Reply to a communication from the examining division | 26.03.2021 | Communication of intention to grant the patent | 07.07.2021 | Fee for grant paid | 07.07.2021 | Fee for publishing/printing paid | 07.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 19.05.2022 | No opposition filed within time limit [2022/30] | Fees paid | Renewal fee | 25.03.2019 | Renewal fee patent year 03 | 27.03.2020 | Renewal fee patent year 04 | 29.03.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.03.2017 | AL | 18.08.2021 | AT | 18.08.2021 | CY | 18.08.2021 | CZ | 18.08.2021 | DK | 18.08.2021 | EE | 18.08.2021 | ES | 18.08.2021 | FI | 18.08.2021 | HR | 18.08.2021 | IT | 18.08.2021 | LT | 18.08.2021 | LV | 18.08.2021 | MC | 18.08.2021 | MK | 18.08.2021 | NL | 18.08.2021 | PL | 18.08.2021 | RO | 18.08.2021 | RS | 18.08.2021 | SE | 18.08.2021 | SI | 18.08.2021 | SK | 18.08.2021 | SM | 18.08.2021 | TR | 18.08.2021 | BG | 18.11.2021 | NO | 18.11.2021 | GR | 19.11.2021 | IS | 18.12.2021 | PT | 20.12.2021 | IE | 22.03.2022 | LU | 22.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | [2024/29] |
Former [2024/23] | HU | 22.03.2017 | |
AL | 18.08.2021 | ||
AT | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
MK | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | HU | 22.03.2017 | |
AL | 18.08.2021 | ||
AT | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/18] | HU | 22.03.2017 | |
AL | 18.08.2021 | ||
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
Former [2022/47] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/36] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/29] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/25] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/24] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/21] | AT | 18.08.2021 | |
DK | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/16] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/10] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/09] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
PT | 20.12.2021 | ||
Former [2022/08] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
Former [2022/07] | AT | 18.08.2021 | |
LT | 18.08.2021 | ||
NO | 18.11.2021 | Documents cited: | Search | [XYI]EP1845636 (FUJITSU LTD [JP]) [X] 1-3,7-9,13,14 * paragraphs [0003] , [0029] , [0031]; figures 15,18,22 * [Y] 6,12 [I] 4,5,10,11,15; | [YA]EP2469721 (NTT DOCOMO INC [JP]) [Y] 6,12 * paragraphs [0030] - [0034]; figure 10 *[A] 1-5,7-11,13-15; | [IA]WO2015053000 (SONY CORP [JP]) [I] 1-5,7-11,13-15 * abstract * [A] 6,12; | [IP]EP3057361 (SONY CORP [JP]) [IP] 1-5,7-11,13-15 * paragraphs [0004] , [0016] , [0026] , [0035] , [0081] - [0083] - [0091] , [0101] - [0109]; figure 13 * | International search | [YA]WO2007111631 (AGERE SYSTEMS INC [US], et al) [Y] 1, 2, 4, 5, 8-10, 12, 13 ,16 * See page 9, line 25 - page 10, line 25; and claims 1-7. * [A] 3, 6, 7, 11, 14, 15 ,17-20; | [Y]WO2014107012 (LG ELECTRONICS INC [KR]) [Y] 1, 2, 4, 5, 8-10, 12, 13 ,16 * See paragraphs [61], [73]-[86]; and claims 1, 11. *; | [A]US2014242918 (WEISSMAN HAIM MENDEL [IL], et al) [A] 1-20 * See paragraphs [0035]-[0039]; and claims 1-9. *; | [A]US9270346 (AHMADI SASSAN [US]) [A] 1-20* See column 9, line 57 - column 10, line 38; and claims 1-6. *; | [A]EP2991239 (FREESCALE SEMICONDUCTOR INC [US]) [A] 1-20 * See paragraphs [0024]-[0025]; and claim 1. * | by applicant | EP1845636 | EP2469721 | EP3057361 |