| EP3435866 - ANALYTE MONITORING SYSTEM [Right-click to bookmark this link] | |||
| Former [2019/06] | SYSTEMS AND METHODS FOR DISPLAY DEVICE AND SENSOR ELECTRONICS UNIT COMMUNICATION | ||
| [2020/26] | Status | Opposition rejected Status updated on 18.08.2023 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 16.10.2020 | ||
| Former | Grant of patent is intended Status updated on 02.09.2020 | ||
| Former | Request for examination was made Status updated on 14.08.2020 | ||
| Former | Grant of patent is intended Status updated on 15.06.2020 | ||
| Former | Request for examination was made Status updated on 04.01.2019 | ||
| Former | The international publication has been made Status updated on 07.10.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Dexcom, Inc. 6340 Sequence Drive San Diego, CA 92121 / US | [2019/06] | Inventor(s) | 01 /
WEDEKIND, Jeffrey, R. 6340 Sequence Dr. San Diego, CA 92121 / US | 02 /
BURNETTE, Douglas, William 6340 Sequence Dr. San Diego, CA 92121 / US | 03 /
MANDAPAKA, Aditya 6340 Sequence Dr. San Diego, CA 92121 / US | 04 /
MCDANIEL, Zebediah L. 6340 Sequence Dr. San Diego, California 92121 / US | 05 /
SIMPSON, Peter, C. 6340 Sequence Dr. San Diego, CA 92121 / US | 06 /
GARCIA, Arturo 6340 Sequence Dr. San Diego, CA 92121 / US | [2019/06] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2020/47] |
| Former [2019/06] | EIP EIP Europe LLP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | Application number, filing date | 17776465.1 | 28.03.2017 | [2019/06] | WO2017US24557 | Priority number, date | US201662315976P | 31.03.2016 Original published format: US 201662315976 P | [2019/06] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017172781 | Date: | 05.10.2017 | Language: | EN | [2017/40] | Type: | A1 Application with search report | No.: | EP3435866 | Date: | 06.02.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.10.2017 takes the place of the publication of the European patent application. | [2019/06] | Type: | B1 Patent specification | No.: | EP3435866 | Date: | 18.11.2020 | Language: | EN | [2020/47] | Search report(s) | International search report - published on: | US | 05.10.2017 | (Supplementary) European search report - dispatched on: | EP | 30.09.2019 | Classification | IPC: | G16H10/60, A61B5/11, A61B5/145, A61B5/1486, A61B5/00, H04L29/06, G16H40/60, // H04L29/08 | [2020/26] | CPC: |
A61B5/14532 (EP,US);
A61B5/0004 (EP,US);
A61B5/0015 (EP,US);
A61B5/0022 (EP,US);
A61B5/1116 (EP,US);
A61B5/14546 (EP,US);
A61B5/14865 (EP,US);
A61B5/4839 (EP,US);
A61B5/7275 (EP,US);
A61B5/7278 (EP,US);
A61B5/742 (EP,US);
A61B5/743 (EP,US);
A61B5/746 (EP,US);
A61B5/7475 (EP,US);
G16H10/40 (EP,US);
G16H10/60 (EP,US);
G16H40/60 (EP,US);
G16H40/63 (US);
G16H40/67 (EP,US);
H04L69/18 (EP,US);
A61B2560/0209 (EP,US);
A61B2560/0223 (EP,US);
A61B2560/0252 (EP,US);
A61B2562/0219 (EP,US);
|
| Former IPC [2019/44] | A61B5/145, A61B5/00, A61B5/11, A61B5/1486, H04L29/08, H04L29/06, G16H40/60 | ||
| Former IPC [2019/06] | A61B5/145, A61B5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ANALYTÜBERWACHUNGSSYSTEM | [2020/26] | English: | ANALYTE MONITORING SYSTEM | [2020/26] | French: | SYSTÈME DE SURVEILLANCE D'ANALYTE | [2020/26] |
| Former [2019/06] | SYSTEME UND VERFAHREN ZUR KOMMUNIKATION ZWISCHEN ANZEIGEVORRICHTUNG UND SENSORELEKTRONIKEINHEIT | ||
| Former [2019/06] | SYSTEMS AND METHODS FOR DISPLAY DEVICE AND SENSOR ELECTRONICS UNIT COMMUNICATION | ||
| Former [2019/06] | SYSTÈMES ET PROCÉDÉS DE COMMUNICATION DE DISPOSITIF D'AFFICHAGE ET D'UNITÉ ÉLECTRONIQUE DE CAPTEUR | Entry into regional phase | 31.10.2018 | National basic fee paid | 31.10.2018 | Search fee paid | 31.10.2018 | Designation fee(s) paid | 31.10.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 31.10.2018 | Examination requested [2019/06] | 17.04.2020 | Amendment by applicant (claims and/or description) | 16.06.2020 | Communication of intention to grant the patent | 12.08.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 03.09.2020 | Communication of intention to grant the patent | 09.10.2020 | Fee for grant paid | 09.10.2020 | Fee for publishing/printing paid | 09.10.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20203298.3 / EP3797685 | EP22168134.9 / EP4088658 | EP23213949.3 / EP4344170 | Opposition(s) | Opponent(s) | 01
18.08.2021
18.08.2021
ADMISSIBLE Abbott Diabetes Care Inc. 1360 South Loop Road Alameda, CA 94502 / US Opponent's representative Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | 02
07.10.2021
11.10.2021
INTERVENTION ADMISSIBLE Abbott GmbH Max-Planck-Ring 2 65205 Wiesbaden / DE Opponent's representative Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2021/46] |
| Former [2021/38] | |||
| Opponent(s) | 01
18.08.2021
Abbott Diabetes Care Inc. 1360 South Loop Road Alameda, CA 94502 / US Opponent's representative Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | 18.10.2021 | Invitation to proprietor to file observations on the notice of opposition | 24.02.2022 | Reply of patent proprietor to notice(s) of opposition | 20.04.2023 | Legal effect of rejection of opposition [2023/38] | 20.04.2023 | Date of oral proceedings | 03.05.2023 | Despatch of minutes of oral proceedings | 03.05.2023 | Date of despatch of rejection of opposition | Fees paid | Renewal fee | 27.03.2019 | Renewal fee patent year 03 | 27.03.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.03.2017 | AL | 18.11.2020 | AT | 18.11.2020 | CY | 18.11.2020 | CZ | 18.11.2020 | DK | 18.11.2020 | EE | 18.11.2020 | FI | 18.11.2020 | HR | 18.11.2020 | LT | 18.11.2020 | LV | 18.11.2020 | MC | 18.11.2020 | MK | 18.11.2020 | MT | 18.11.2020 | PL | 18.11.2020 | RO | 18.11.2020 | RS | 18.11.2020 | SI | 18.11.2020 | SK | 18.11.2020 | SM | 18.11.2020 | TR | 18.11.2020 | BG | 18.02.2021 | GR | 19.02.2021 | IS | 18.03.2021 | PT | 18.03.2021 | LU | 28.03.2021 | [2024/42] |
| Former [2024/29] | HU | 28.03.2017 | |
| AL | 18.11.2020 | ||
| AT | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| MK | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| TR | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| Former [2024/23] | HU | 28.03.2017 | |
| AL | 18.11.2020 | ||
| AT | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| MK | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| Former [2023/33] | HU | 28.03.2017 | |
| AL | 18.11.2020 | ||
| AT | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| Former [2023/30] | AL | 18.11.2020 | |
| AT | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| Former [2022/23] | AL | 18.11.2020 | |
| AT | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| Former [2022/10] | AL | 18.11.2020 | |
| AT | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/09] | AL | 18.11.2020 | |
| AT | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 28.03.2021 | ||
| Former [2021/50] | AL | 18.11.2020 | |
| AT | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/45] | AL | 18.11.2020 | |
| AT | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/37] | AT | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/36] | AT | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/35] | AT | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/33] | AT | 18.11.2020 | |
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/32] | AT | 18.11.2020 | |
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/28] | AT | 18.11.2020 | |
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/25] | AT | 18.11.2020 | |
| FI | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/24] | AT | 18.11.2020 | |
| FI | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/23] | FI | 18.11.2020 | |
| LV | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/22] | FI | 18.11.2020 | |
| RS | 18.11.2020 | ||
| PT | 18.03.2021 | ||
| Former [2021/21] | FI | 18.11.2020 | |
| PT | 18.03.2021 | ||
| Former [2021/20] | FI | 18.11.2020 | Documents cited: | Search | [XI] US2014266776 (MILLER THOMAS et al.) [X] 1,6,7 * abstract * * paragraphs [0045] , [0 50] - [0053] - [0 71] - [0072] - [0 80] - [0083] - [ 103] - [0110] - [ 165] - [0206] *[I] 2-5,8-10 | [XAI] US2016066826 (LARVENZ SHAWN et al.) [X] 1,6,7 * abstract * * paragraphs [0068] - [0070] - [0 73] - [0078] - [0 82] - [0127] *[A] 8-10 [I] 2-5 | [A] US2014176338 (HE LEI LAWRENCE et al.) [A] 1-10 * abstract * * paragraphs [0019] - [0090] * | International search | [X] US2014266776 (MILLER THOMAS et al.) [X] 1-6 * ; figures 1, 10; paragraphs [0014], [0138], [0173], [0199], [0202], [0203] * | [A] US2011009727 (MENSINGER MICHAEL ROBERT et al.) [A] 1-6 * ; entire document * | by applicant | US2014266776 | US2016066826 | Opposition | US2015038818 | US2014273858 | US2014266785 | US9211065 | US2011213225 | WO2017172781 | US2015038818 | US2014273858 | US2014266785 | US9211065 | US2011213225 | US2011177780 | US2015118658 | BLUETOOTH: "Master Table of Contents & Compliance Requirements", SPECIFICATION OF THE BLUETOOTH SYSTEM COVERED CORE PACKAGE VERSION: 4.0, 30 June 2010 (2010-06-30), pages 1 - 106, XP055366923, Retrieved from the Internet | "Specification of the Bluetooth system Experience More. Vol 2, part E, chapter 3 and vol 6, part E", 30 June 2010 (2010-06-30), XP055199827, Retrieved from the Internet |