| EP3541673 - PEDAL TRAVEL SIMULATOR, HYDRAULIC BLOCK COMPRISING A PEDAL TRAVEL SIMULATOR OF SAID TYPE, AND METHOD FOR ADJUSTING A CHARACTERISTIC OF A PEDAL TRAVEL SIMULATOR OF SAID TYPE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.01.2023 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 28.01.2022 | ||
| Former | Grant of patent is intended Status updated on 25.10.2021 | ||
| Former | Examination is in progress Status updated on 28.03.2020 | ||
| Former | Request for examination was made Status updated on 23.08.2019 | ||
| Former | The international publication has been made Status updated on 25.05.2018 | ||
| Former | unknown Status updated on 24.10.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
| Former [2019/39] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
GUGGENMOS, Harald An Der Illerau 14 87509 Immenstadt/Seifen / DE | 02 /
MAYR, Matthias Weiher 15 87549 Rettenberg / DE | 03 /
WEH, Andreas Rappolz 3 87477 Sulzberg / DE | 04 /
SPROCQ, Raynald 15 rue des Bourguignons 77450 Esbly / FR | 05 /
ANDERSON, Chris 166 Rue Montmartre 75002 Paris / FR | [2019/39] | Application number, filing date | 17783802.6 | 05.10.2017 | [2019/39] | WO2017EP75283 | Priority number, date | DE201610222567 | 16.11.2016 Original published format: DE102016222567 | [2019/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018091195 | Date: | 24.05.2018 | Language: | DE | [2018/21] | Type: | A1 Application with search report | No.: | EP3541673 | Date: | 25.09.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 24.05.2018 takes the place of the publication of the European patent application. | [2019/39] | Type: | B1 Patent specification | No.: | EP3541673 | Date: | 02.03.2022 | Language: | DE | [2022/09] | Search report(s) | International search report - published on: | EP | 24.05.2018 | Classification | IPC: | B60T8/40 | [2019/39] | CPC: |
B60T8/409 (EP,KR,US);
B60T7/042 (KR);
F15B15/24 (US);
B60Y2400/81 (KR)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | PEDALWEGSIMULATOR,HYDRAULIKBLOCK MIT EINEM DERARTIGEN PEDALWEGSIMULATOR UND VERFAHREN ZUR EINSTELLUNG EINER KENNLINIE EINES DERARTIGEN PEDALWEGSIMULATORS | [2019/39] | English: | PEDAL TRAVEL SIMULATOR, HYDRAULIC BLOCK COMPRISING A PEDAL TRAVEL SIMULATOR OF SAID TYPE, AND METHOD FOR ADJUSTING A CHARACTERISTIC OF A PEDAL TRAVEL SIMULATOR OF SAID TYPE | [2019/39] | French: | SIMULATEUR DE COURSE DE PÉDALE, BLOC HYDRAULIQUE ÉQUIPÉ DE CE DERNIER ET PROCÉDÉ DE RÉGLAGE D'UNE COURBE CARACTÉRISTIQUE D'UN SIMULATEUR DE COURSE DE PÉDALE DE CE TYPE | [2019/39] | Entry into regional phase | 17.06.2019 | National basic fee paid | 17.06.2019 | Designation fee(s) paid | 17.06.2019 | Examination fee paid | Examination procedure | 17.06.2019 | Examination requested [2019/39] | 17.06.2019 | Date on which the examining division has become responsible | 07.11.2019 | Amendment by applicant (claims and/or description) | 01.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 29.07.2020 | Reply to a communication from the examining division | 26.10.2021 | Communication of intention to grant the patent | 13.01.2022 | Fee for grant paid | 13.01.2022 | Fee for publishing/printing paid | 13.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 05.12.2022 | No opposition filed within time limit [2023/06] | Fees paid | Renewal fee | 31.10.2019 | Renewal fee patent year 03 | 02.11.2020 | Renewal fee patent year 04 | 02.11.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.10.2017 | AL | 02.03.2022 | CY | 02.03.2022 | CZ | 02.03.2022 | DK | 02.03.2022 | EE | 02.03.2022 | ES | 02.03.2022 | FI | 02.03.2022 | HR | 02.03.2022 | IT | 02.03.2022 | LT | 02.03.2022 | LV | 02.03.2022 | MC | 02.03.2022 | MK | 02.03.2022 | MT | 02.03.2022 | NL | 02.03.2022 | PL | 02.03.2022 | RO | 02.03.2022 | RS | 02.03.2022 | SE | 02.03.2022 | SI | 02.03.2022 | SK | 02.03.2022 | SM | 02.03.2022 | TR | 02.03.2022 | BG | 02.06.2022 | NO | 02.06.2022 | GR | 03.06.2022 | IS | 02.07.2022 | PT | 04.07.2022 | AT | 05.10.2022 | GB | 05.10.2022 | IE | 05.10.2022 | LU | 05.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | [2024/42] |
| Former [2024/29] | HU | 05.10.2017 | |
| AL | 02.03.2022 | ||
| CY | 02.03.2022 | ||
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| MK | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| TR | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| AT | 05.10.2022 | ||
| GB | 05.10.2022 | ||
| IE | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2024/27] | HU | 05.10.2017 | |
| AL | 02.03.2022 | ||
| CY | 02.03.2022 | ||
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| MK | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| AT | 05.10.2022 | ||
| GB | 05.10.2022 | ||
| IE | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2024/21] | HU | 05.10.2017 | |
| AL | 02.03.2022 | ||
| CY | 02.03.2022 | ||
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| AT | 05.10.2022 | ||
| GB | 05.10.2022 | ||
| IE | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2024/18] | HU | 05.10.2017 | |
| AL | 02.03.2022 | ||
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| AT | 05.10.2022 | ||
| GB | 05.10.2022 | ||
| IE | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2024/09] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| AT | 05.10.2022 | ||
| GB | 05.10.2022 | ||
| IE | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2023/48] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| GB | 05.10.2022 | ||
| IE | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2023/47] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| GB | 05.10.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2023/42] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| LU | 05.10.2022 | ||
| BE | 31.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2023/35] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| IT | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| LU | 05.10.2022 | ||
| CH | 31.10.2022 | ||
| LI | 31.10.2022 | ||
| Former [2023/30] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| LU | 05.10.2022 | ||
| Former [2023/25] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| MC | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| Former [2023/10] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SI | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| Former [2023/07] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| DK | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| Former [2023/01] | AL | 02.03.2022 | |
| CZ | 02.03.2022 | ||
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| Former [2022/51] | CZ | 02.03.2022 | |
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| IS | 02.07.2022 | ||
| PT | 04.07.2022 | ||
| Former [2022/49] | CZ | 02.03.2022 | |
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SK | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| PT | 04.07.2022 | ||
| Former [2022/48] | CZ | 02.03.2022 | |
| EE | 02.03.2022 | ||
| ES | 02.03.2022 | ||
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| PT | 04.07.2022 | ||
| Former [2022/47] | ES | 02.03.2022 | |
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RO | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| SM | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| PT | 04.07.2022 | ||
| Former [2022/44] | ES | 02.03.2022 | |
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| NL | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| Former [2022/39] | ES | 02.03.2022 | |
| FI | 02.03.2022 | ||
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| Former [2022/36] | ES | 02.03.2022 | |
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| LV | 02.03.2022 | ||
| PL | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| GR | 03.06.2022 | ||
| Former [2022/35] | ES | 02.03.2022 | |
| HR | 02.03.2022 | ||
| LT | 02.03.2022 | ||
| RS | 02.03.2022 | ||
| SE | 02.03.2022 | ||
| BG | 02.06.2022 | ||
| NO | 02.06.2022 | ||
| Former [2022/34] | ES | 02.03.2022 | |
| LT | 02.03.2022 | ||
| NO | 02.06.2022 | ||
| Former [2022/33] | LT | 02.03.2022 | |
| NO | 02.06.2022 | Cited in | International search | [XYI] JP2009143302 (HONDA MOTOR CO LTD et al.) [X] 1,6 * paragraph [0020]; figures 1,2 *[Y] 3 [I] 2,10 | [XI] JP2014031067 (YAMAHA MOTOR CO LTD et al.) [X] 1,6,7 * abstract * * paragraph [0035] * * paragraph [0033] *[I] 10 | [XA] JP2008284941 (HONDA MOTOR CO LTD et al.) [X] 1,6 * abstract *[A] 5 | [XAY] DE102014215308 (BOSCH GMBH ROBERT et al.) [X] 1,6,8 * paragraph [0026] - paragraph [0054]; figures 2b-2e *[A] 2 [Y] 3,9 | [YA] DE102014213732 (BOSCH GMBH ROBERT et al.) [Y] 9 * abstract *[A] 1,8 |