EP3449139 - ANTI-VIBRATION THREAD FORM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.11.2023 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 09.12.2022 | ||
Former | Grant of patent is intended Status updated on 09.11.2022 | ||
Former | Request for examination was made Status updated on 01.02.2019 | ||
Former | The international publication has been made Status updated on 04.11.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Infastech Intellectual Properties Pte. Ltd. 8 Marina Boulevard 05-02 Marina Bay Financial Centre Tower 1 Singapore 018981 / SG | [2019/10] | Inventor(s) | 01 /
BOSTICK, Ryan 25235 Dequindre Rd. Madison Heights, Michigan 48071 / US | 02 /
PEACOCK, Kevin 25235 Dequindre Rd. Madison Heights, Michigan 48071 / US | [2019/10] | Representative(s) | SBD IPAdmin 270 Bath Road Slough, Berkshire SL1 4DX / GB | [2023/02] |
Former [2019/10] | SBD IPAdmin 210 Bath Road Slough, Berkshire SL1 3YD / GB | Application number, filing date | 17788923.5 | 27.04.2017 | [2019/10] | WO2017IB52447 | Priority number, date | US201662329673P | 29.04.2016 Original published format: US 201662329673 P | [2019/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017187383 | Date: | 02.11.2017 | Language: | EN | [2017/44] | Type: | A1 Application with search report | No.: | EP3449139 | Date: | 06.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.11.2017 takes the place of the publication of the European patent application. | [2019/10] | Type: | B1 Patent specification | No.: | EP3449139 | Date: | 11.01.2023 | Language: | EN | [2023/02] | Search report(s) | International search report - published on: | KR | 02.11.2017 | (Supplementary) European search report - dispatched on: | EP | 10.12.2019 | Classification | IPC: | F16B33/02, F16B39/30 | [2020/02] | CPC: |
F16B33/02 (EP,US);
F16B39/30 (EP,US)
|
Former IPC [2019/10] | F16B33/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SCHWINGUNGSDÄMPFENDER GEWINDEGANG | [2019/10] | English: | ANTI-VIBRATION THREAD FORM | [2019/10] | French: | FORME DE FILET ANTI-VIBRATION | [2019/10] | Entry into regional phase | 24.10.2018 | National basic fee paid | 24.10.2018 | Search fee paid | 24.10.2018 | Designation fee(s) paid | 24.10.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 24.10.2018 | Examination requested [2019/10] | 27.05.2020 | Amendment by applicant (claims and/or description) | 10.11.2022 | Communication of intention to grant the patent | 05.12.2022 | Fee for grant paid | 05.12.2022 | Fee for publishing/printing paid | 05.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.10.2023 | No opposition filed within time limit [2023/51] | Fees paid | Renewal fee | 15.04.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 | 15.04.2021 | Renewal fee patent year 05 | 21.03.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 11.01.2023 | CZ | 11.01.2023 | DK | 11.01.2023 | EE | 11.01.2023 | ES | 11.01.2023 | FI | 11.01.2023 | HR | 11.01.2023 | IT | 11.01.2023 | LT | 11.01.2023 | LV | 11.01.2023 | MC | 11.01.2023 | NL | 11.01.2023 | PL | 11.01.2023 | RO | 11.01.2023 | RS | 11.01.2023 | SE | 11.01.2023 | SI | 11.01.2023 | SK | 11.01.2023 | SM | 11.01.2023 | NO | 11.04.2023 | GR | 12.04.2023 | IE | 27.04.2023 | LU | 27.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | FR | 30.04.2023 | LI | 30.04.2023 | IS | 11.05.2023 | PT | 11.05.2023 | [2024/26] |
Former [2024/21] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IE | 27.04.2023 | ||
LU | 27.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
FR | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2024/11] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
LU | 27.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
FR | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2024/09] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
LU | 27.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2024/08] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
LU | 27.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2024/04] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
LU | 27.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/50] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/49] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/48] | AT | 11.01.2023 | |
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/46] | AT | 11.01.2023 | |
DK | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/39] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/38] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/37] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/36] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/35] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
NO | 11.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/34] | ES | 11.01.2023 | |
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
PT | 11.05.2023 | ||
Former [2023/33] | ES | 11.01.2023 | |
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
Former [2023/31] | NL | 11.01.2023 | Documents cited: | Search | [A]US2012195713 (GU JAMES MAO ZHONG [CN], et al) [A] 1-11 * paragraph [0002] - paragraph [0004]; figure 1 *; | [A]CN202560774U (JILIN XIANGDA ELECTRIC VEHICLE FACTORY) [A] 1-11* figure 1 *; | [A]CA2915891 (XU SONGLIN [CN]) [A] 1-11 * page 7, line 5 - line 6 * | International search | [Y]US4171012 (HOLMES HORACE D [US]) [Y] 1-15 * See column 1, line 13 - column 6, line 64; and figures 1-13. *; | [A]US5340254 (HERTEL PAUL E [US], et al) [A] 1-15 * See column 1, line 13 - column 3, line 58; and figures 1-5, 12-15. *; | [Y]US2007280803 (PRITCHARD ALAN [ES]) [Y] 1-15 * See paragraphs [0002]-[0040]; and figures 1-10. *; | [A]US2009116929 (SHEA DAVID H [US], et al) [A] 1-15* See paragraphs [0002]-[0021]; and figures 1-8. *; | [A]CN202560774U (JILIN XIANGDA ELECTRIC VEHICLE FACTORY) [A] 1-15 * See paragraphs [0001]-[0020]; and figure 1. * |