EP3449522 - THREE-CHAMBER ELECTROCHEMICAL BALANCING CELLS FOR SIMULTANEOUS MODIFICATION OF STATE OF CHARGE AND ACIDITY WITHIN A FLOW BATTERY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.06.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 14.07.2023 | ||
Former | Grant of patent is intended Status updated on 02.03.2023 | ||
Former | Request for examination was made Status updated on 01.02.2019 | ||
Former | The international publication has been made Status updated on 04.11.2017 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states Lockheed Martin Energy, LLC 6801 Rockledge Drive Bethesda, MD 20817 / US | [2019/10] | Inventor(s) | 01 /
PIJPERS, Joseph Johannes Henricus 21 Granville Road 2 Cambridge, Massachusetts 02138 / US | [2019/10] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2019/10] | Application number, filing date | 17790123.8 | 18.04.2017 | [2019/10] | WO2017US28191 | Priority number, date | US201615143344 | 29.04.2016 Original published format: US201615143344 | [2019/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017189282 | Date: | 02.11.2017 | Language: | EN | [2017/44] | Type: | A1 Application with search report | No.: | EP3449522 | Date: | 06.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.11.2017 takes the place of the publication of the European patent application. | [2019/10] | Type: | B1 Patent specification | No.: | EP3449522 | Date: | 16.08.2023 | Language: | EN | [2023/33] | Search report(s) | International search report - published on: | US | 02.11.2017 | (Supplementary) European search report - dispatched on: | EP | 02.12.2019 | Classification | IPC: | H01M8/04, H01M8/06, H01M8/08, H01M8/18, H01M10/42, H01M8/04276, H01M8/083, H01M16/00, H01M8/04186, H01M4/90, H01M8/1053, H01M8/1067, // H01M8/1018, H01M8/10 | [2023/12] | CPC: |
H01M8/04186 (EP,KR,US);
H01M8/188 (EP,KR,US);
H01M16/00 (EP);
H01M4/9016 (KR);
H01M4/9041 (EP,US);
H01M8/04276 (EP,KR);
H01M8/08 (EP,US);
H01M8/083 (EP);
H01M8/1053 (EP,KR,US);
H01M8/1067 (EP,KR,US);
H01M8/186 (EP,US);
H01M2008/1095 (EP,US);
|
Former IPC [2020/01] | H01M8/04, H01M8/06, H01M8/08, H01M8/18, H01M10/42, H01M8/04276, H01M8/083, H01M16/00, H01M8/04186, H01M4/90, H01M8/1053, H01M8/1067, // H01M8/1018 | ||
Former IPC [2019/10] | H01M8/04, H01M8/06, H01M8/08, H01M8/18, H01M10/42 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | AUSGLEICHENDE BATTERIEZELLEN MIT DREI KAMMERN ZUR SIMULTANEN MODIFIZIERUNG DES LADESTATUS UND SÄUREGRADES IN EINER FLUSSBATTERIE | [2019/10] | English: | THREE-CHAMBER ELECTROCHEMICAL BALANCING CELLS FOR SIMULTANEOUS MODIFICATION OF STATE OF CHARGE AND ACIDITY WITHIN A FLOW BATTERY | [2019/10] | French: | CELLULES D'ÉQUILIBRAGE ÉLECTROCHIMIQUE À TROIS CHAMBRES POUR MODIFICATION SIMULTANÉE DE L'ÉTAT DE CHARGE ET DE L'ACIDITÉ À L'INTÉRIEUR D'UNE BATTERIE À CIRCULATION | [2019/10] | Entry into regional phase | 18.10.2018 | National basic fee paid | 18.10.2018 | Search fee paid | 18.10.2018 | Designation fee(s) paid | 18.10.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 18.10.2018 | Examination requested [2019/10] | 25.06.2020 | Amendment by applicant (claims and/or description) | 03.03.2023 | Communication of intention to grant the patent | 10.07.2023 | Fee for grant paid | 10.07.2023 | Fee for publishing/printing paid | 10.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 17.05.2024 | No opposition filed within time limit [2024/30] | Fees paid | Renewal fee | 29.04.2019 | Renewal fee patent year 03 | 27.04.2020 | Renewal fee patent year 04 | 27.04.2021 | Renewal fee patent year 05 | 27.04.2022 | Renewal fee patent year 06 | 27.04.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 16.08.2023 | CZ | 16.08.2023 | EE | 16.08.2023 | HR | 16.08.2023 | LT | 16.08.2023 | LV | 16.08.2023 | NL | 16.08.2023 | RO | 16.08.2023 | RS | 16.08.2023 | SE | 16.08.2023 | SI | 16.08.2023 | SK | 16.08.2023 | SM | 16.08.2023 | NO | 16.11.2023 | GR | 17.11.2023 | IS | 16.12.2023 | PT | 18.12.2023 | [2024/36] |
Former [2024/23] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
EE | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/20] | AT | 16.08.2023 | |
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/10] | AT | 16.08.2023 | |
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/09] | AT | 16.08.2023 | |
LT | 16.08.2023 | ||
NL | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
Former [2024/08] | LT | 16.08.2023 | |
NL | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | Documents cited: | Search | [Y]US2014272483 (PHAM AI QUOC [US], et al) [Y] 1-15 * page 2, paragraph 0011 - page 19, paragraph 0156; figures 1-13 *; | [IY]WO2015048074 (LOCKHEED MARTIN ADVANCED ENERGY STORAGE LLC [US]) [I] 1-15 * page 3, paragraph 0013 - page 24, paragraph 0091; figures 1-3; examples 3,8,6,9,16-22 * [Y] 1-15; | [Y] - XU T ED - HILAL NIDAL, "Development of bipolar membrane-based processes", DESALINATION, ELSEVIER, AMSTERDAM, NL, (20011120), vol. 140, no. 3, doi:10.1016/S0011-9164(01)00374-5, ISSN 0011-9164, pages 247 - 258, XP004329758 [Y] 1-15 * abstract * * page 249, column 2 - page 250, column 1; table 1 * * page 255, column 2 - page 257, column 1 * DOI: http://dx.doi.org/10.1016/S0011-9164(01)00374-5 | International search | [Y]US4539086 (FUJITA YUKO [JP], et al) [Y] 2-3 * ; column 10, lines 1-5 *; | [Y]US7179561 (NIU CHUNMING [US], et al) [Y] 7-8 * ; abstract; column 2, lines 11-25; claim 54 *; | [Y]JP2010539919 (BONBERI, P) [Y] 9 * ; see machine translation; page 6, paragraphs 6-7 *; | [A]US2014004402 (YAN YUSHAN [US], et al) [A] 11-28 * ; entire document *; | [XYA]WO2014120876 (3M INNOVATIVE PROPERTIES CO [US]) [X] 1, 4-6, 10 * ; figures 1, 4; paragraph [0034] * [Y] 2, 3, 7-9 [A] 11-28; | [A]WO2015048074 (LOCKHEED MARTIN ADVANCED ENERGY STORAGE LLC [US]) [A] 11-28 * ; entire document *; | [PY]WO2016168360 (LOCKHEED MARTIN ADVANCED ENERGY STORAGE LLC [US]) [PY] 1-28* ; entire document * |