EP3532126 - ASSEMBLY OF A CATHETER AND A COUPLING COMPONENT FOR COUPLING THE CATHETER TO TUBES, AND AN APPARATUS INCLUDING THE ASSEMBLY [Right-click to bookmark this link] | |||
Former [2019/36] | A CATHETER, A COUPLING COMPONENT FOR COUPLING THE CATHETER TO TUBES, AN APPARATUS INCLUDING THE RECTAL CATHETER, AND A METHOD OF MANUFACTURING THE CATHETER | ||
[2020/13] | Status | No opposition filed within time limit Status updated on 14.01.2022 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 05.02.2021 | ||
Former | Grant of patent is intended Status updated on 23.09.2020 | ||
Former | Request for examination was made Status updated on 21.07.2020 | ||
Former | Grant of patent is intended Status updated on 31.03.2020 | ||
Former | Request for examination was made Status updated on 02.08.2019 | ||
Former | The international publication has been made Status updated on 05.05.2018 | ||
Former | unknown Status updated on 14.11.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states MBH-International A/S Gydevang 28-30 3450 Allerød / DK | [2019/36] | Inventor(s) | 01 /
BJERREGAARD, Henrik Bork Knabstrupvej 43 2700 Brønshøj / DK | 02 /
HOUGAARD, Ole Rosenvænget 20 1. tv. 3000 Helsingør / DK | 03 /
DUE, Cathrine Ørsnes Birkebakken 10 2840 Holte / DK | [2019/36] | Representative(s) | Holme Patent A/S Valbygårdsvej 33 2500 Valby / DK | [2021/10] |
Former [2019/36] | Holme Patent A/S Valbygårdsvej 33 2500 Valby / DK | Application number, filing date | 17793829.7 | 12.10.2017 | [2019/36] | WO2017DK50338 | Priority number, date | DK2016PA70846 | 28.10.2016 Original published format: DK PA201670846 | [2019/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018077361 | Date: | 03.05.2018 | Language: | EN | [2018/18] | Type: | A1 Application with search report | No.: | EP3532126 | Date: | 04.09.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.05.2018 takes the place of the publication of the European patent application. | [2019/36] | Type: | B1 Patent specification | No.: | EP3532126 | Date: | 10.03.2021 | Language: | EN | [2021/10] | Search report(s) | International search report - published on: | EP | 03.05.2018 | Classification | IPC: | A61M3/02, A61M39/10 | [2019/36] | CPC: |
A61M3/0295 (EP,US);
A61M25/0009 (US);
A61M25/10181 (US);
A61M3/0262 (EP,US);
A61M3/0279 (EP,US);
A61M39/105 (EP,US);
A61B2017/00526 (US);
A61M2025/0073 (US);
A61M2039/1016 (EP,US);
A61M2207/00 (EP,US);
A61M2210/1064 (US);
A61M2210/1067 (US);
A61M25/04 (US);
A61M3/0208 (EP,US);
A61M3/022 (EP,US);
B29C45/1676 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ANORDNUNG MIT KATHETER UND KOPPLUNGSKOMPONENTE ZUR KOPPLUNG DES KATHETERS AN ROHRE, UND VORRICHTUNG UMFASSEND EINE SOLCHE ANORDNUNG | [2020/13] | English: | ASSEMBLY OF A CATHETER AND A COUPLING COMPONENT FOR COUPLING THE CATHETER TO TUBES, AND AN APPARATUS INCLUDING THE ASSEMBLY | [2020/13] | French: | ENSEMBLE COMPRENANT UN CATHÉTER ET UN COMPOSANT D'ACCOUPLEMENT POUR ACCOUPLER LE CATHÉTER À DES TUBES, ET APPAREIL COMPRENANT L'ENSEMBLE | [2020/13] |
Former [2019/36] | KATHETER, KOPPLUNGSKOMPONENTE ZUR KOPPLUNG DES KATHETERS AN ROHRE, VORRICHTUNG MIT DEM REKTALEN KATHETER UND VERFAHREN ZUR HERSTELLUNG DES KATHETERS | ||
Former [2019/36] | A CATHETER, A COUPLING COMPONENT FOR COUPLING THE CATHETER TO TUBES, AN APPARATUS INCLUDING THE RECTAL CATHETER, AND A METHOD OF MANUFACTURING THE CATHETER | ||
Former [2019/36] | CATHÉTER, COMPOSANT D'ACCOUPLEMENT POUR ACCOUPLER LE CATHÉTER À DES TUBES, APPAREIL COMPRENANT LE CATHÉTER RECTAL, ET PROCÉDÉ DE FABRICATION DU CATHÉTER | Entry into regional phase | 21.05.2019 | National basic fee paid | 21.05.2019 | Designation fee(s) paid | 21.05.2019 | Examination fee paid | Examination procedure | 12.07.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 21.05.2019 | Examination requested [2019/36] | 21.05.2019 | Date on which the examining division has become responsible | 01.04.2020 | Communication of intention to grant the patent | 15.07.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.09.2020 | Communication of intention to grant the patent | 22.01.2021 | Fee for grant paid | 22.01.2021 | Fee for publishing/printing paid | 22.01.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21150666.2 / EP3838309 | Opposition(s) | 13.12.2021 | No opposition filed within time limit [2022/07] | Fees paid | Renewal fee | 30.10.2019 | Renewal fee patent year 03 | 02.11.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.10.2017 | AL | 10.03.2021 | AT | 10.03.2021 | CY | 10.03.2021 | CZ | 10.03.2021 | EE | 10.03.2021 | ES | 10.03.2021 | FI | 10.03.2021 | HR | 10.03.2021 | LT | 10.03.2021 | LV | 10.03.2021 | MC | 10.03.2021 | MK | 10.03.2021 | MT | 10.03.2021 | PL | 10.03.2021 | RO | 10.03.2021 | RS | 10.03.2021 | SI | 10.03.2021 | SK | 10.03.2021 | SM | 10.03.2021 | TR | 10.03.2021 | BG | 10.06.2021 | GR | 11.06.2021 | IS | 10.07.2021 | PT | 12.07.2021 | LU | 12.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | [2024/42] |
Former [2024/29] | HU | 12.10.2017 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
MK | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
TR | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2024/23] | HU | 12.10.2017 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
MK | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/33] | HU | 12.10.2017 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/30] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/37] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/35] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
LU | 12.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
BE | 31.10.2021 | ||
Former [2022/23] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/13] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/10] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/08] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/07] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/52] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/51] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/50] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2021/48] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/46] | AT | 10.03.2021 | |
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/37] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/36] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
BG | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/35] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
Former [2021/33] | FI | 10.03.2021 | |
LT | 10.03.2021 | Cited in | International search | [XAYI]WO2011012323 (BRAUN MEDICAL SAS [FR], et al) [X] 1,2,4,10,18 * the whole document * * paragraph [0021] - paragraph [0024]; figure 1 * [A] 17,26-33 [Y] 1,2,4,6,10,13,15,18,23-25 [I] 34; | [YDA]WO2011023196 (MBH INTERNAT A S [DK], et al) [YD] 1-5,7-12,14,16,18-22 * the whole document * * figure 1 *[A] 17,26-33; | [XAYI]WO2011160834 (BRAUN MEDICAL S A S B [FR], et al) [X] 1-5,7,8,10-12,14,16,18-22 * the whole document * * paragraph [0016] - paragraph [0023]; figure 2 * [A] 17,26-33 [Y] 1-8,10-16,18-25 [I] 34; | [YA]WO2013182593 (DENTSPLY IH AB [SE]) [Y] 1-5,7-12,14,16,18-22 * the whole document * * figures 1, 3, 4 * [A] 17,26-33; | [XAYI]GB2527278 (WELLAND MEDICAL LTD [GB]) [X] 1-5,9,10,14,18 * the whole document * * page 14 - page 15; figures 6a, 6b, 7a * [A] 17,26-33 [Y] 1-6,9,10,13-15,18,23-25 [I] 34 |