EP3456132 - METHODS AND APPARATUSES FOR SKIPPING TRANSPORT BLOCK TRANSMISSION DEPENDING ON UPLINK CONTROL INFORMATION TRANSMISSION [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 19.01.2024 Database last updated on 16.11.2024 | |
Former | Grant of patent is intended Status updated on 12.10.2023 | ||
Former | Examination is in progress Status updated on 03.04.2021 | ||
Former | Request for examination was made Status updated on 15.02.2019 | ||
Former | The international publication has been made Status updated on 17.11.2017 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): RO, SK | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2024/08] |
Former [2019/36] | For all designated states Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | ||
Former [2019/12] | For all designated states Nokia Technologies Oy Karaportti 3 02610 Espoo / FI | Inventor(s) | 01 /
WU, Chunli 12-5-301 Huihuayuan Huilongguan Changping District Beijing 102208 / CN | [2019/12] | Representative(s) | Laine IP Oy Porkkalankatu 24 00180 Helsinki / FI | [2024/08] |
Former [2019/12] | Nokia EPO representatives Nokia Technologies Oy Karaportti 3 02610 Espoo / FI | Application number, filing date | 17795675.2 | 04.05.2017 | [2019/12] | WO2017FI50343 | Priority number, date | US201662335280P | 12.05.2016 Original published format: US 201662335280 P | [2019/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017194830 | Date: | 16.11.2017 | Language: | EN | [2017/46] | Type: | A1 Application with search report | No.: | EP3456132 | Date: | 20.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.11.2017 takes the place of the publication of the European patent application. | [2019/12] | Type: | B1 Patent specification | No.: | EP3456132 | Date: | 21.02.2024 | Language: | EN | [2024/08] | Search report(s) | International search report - published on: | FI | 16.11.2017 | (Supplementary) European search report - dispatched on: | EP | 12.11.2019 | Classification | IPC: | H04W24/02 | [2019/50] | CPC: |
H04L1/1664 (EP,US);
H04W72/21 (EP,KR,RU,US);
H04W72/23 (KR,US);
H04L1/0061 (US);
H04L1/1671 (EP,US);
H04L1/18 (RU);
H04L1/1812 (EP,KR,US);
H04L1/1854 (EP,US);
H04L5/0044 (EP,KR,RU,US);
H04L5/0053 (EP,KR,US);
H04L5/0064 (EP,KR,RU,US);
H04W28/0278 (US);
|
Former IPC [2019/12] | H04W72/12, H04W72/04, H04W24/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNGEN ZUM ÜBERSPRINGEN DER TRANSPORTBLOCKÜBERTRAGUNG IN ABHÄNGIGKEIT DER UPLINK-STEUERUNGSINFORMATIONSÜBERTRAGUNG | [2019/12] | English: | METHODS AND APPARATUSES FOR SKIPPING TRANSPORT BLOCK TRANSMISSION DEPENDING ON UPLINK CONTROL INFORMATION TRANSMISSION | [2019/12] | French: | PROCÉDÉS ET APPAREILS POUR SAUTER UNE ÉMISSION DE BLOC DE TRANSPORT EN FONCTION D'UNE ÉMISSION D'INFORMATIONS DE COMMANDE DE LIAISON MONTANTE | [2019/12] | Entry into regional phase | 09.11.2018 | National basic fee paid | 09.11.2018 | Search fee paid | 09.11.2018 | Designation fee(s) paid | 09.11.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 09.11.2018 | Examination requested [2019/12] | 19.05.2020 | Amendment by applicant (claims and/or description) | 08.04.2021 | Despatch of a communication from the examining division (Time limit: M06) | 01.10.2021 | Reply to a communication from the examining division | 07.09.2022 | Despatch of a communication from the examining division (Time limit: M04) | 07.12.2022 | Reply to a communication from the examining division | 13.10.2023 | Communication of intention to grant the patent | 10.01.2024 | Fee for grant paid | 10.01.2024 | Fee for publishing/printing paid | 10.01.2024 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 15.05.2019 | Renewal fee patent year 03 | 14.05.2020 | Renewal fee patent year 04 | 13.05.2021 | Renewal fee patent year 05 | 18.04.2022 | Renewal fee patent year 06 | 12.04.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HR | 21.02.2024 | RO | 21.02.2024 | SK | 21.02.2024 | SM | 21.02.2024 | NO | 21.05.2024 | RS | 21.05.2024 | IS | 21.06.2024 | [2024/49] |
Former [2024/47] | HR | 21.02.2024 | |
SM | 21.02.2024 | ||
NO | 21.05.2024 | ||
RS | 21.05.2024 | ||
IS | 21.06.2024 | ||
Former [2024/34] | HR | 21.02.2024 | |
NO | 21.05.2024 | ||
RS | 21.05.2024 | ||
IS | 21.06.2024 | ||
Former [2024/33] | NO | 21.05.2024 | |
IS | 21.06.2024 | ||
Former [2024/32] | IS | 21.06.2024 | Documents cited: | Search | [A]US2011310833 (LEE OK-SEON [KR], et al); | International search | [X]US2011310833 (LEE OK-SEON [KR], et al); | [A]US2012230232 (JI HYOUNGJU [KR], et al); | by applicant | US2011310833 |