EP3458345 - A SYSTEM AND METHOD TO STABILIZE MOTORCYCLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.05.2023 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 10.06.2022 | ||
Former | Grant of patent is intended Status updated on 29.03.2022 | ||
Former | Request for examination was made Status updated on 22.02.2019 | ||
Former | The international publication has been made Status updated on 25.11.2017 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Mechanical Simulation Corporation 755 Phoenix Drive Ann Arbor, MI 48108 / US | [2022/08] |
Former [2019/13] | For all designated states Mechanical Simulation Corporation 755 Phoenix Drive Ann Arbor, MI 48108 / US | ||
For all designated states Watanabe, Yukio 2992 S. Foxridge Court Ann Arbor, MI 48105 / US | |||
For all designated states Sayers, Michael 660 Archwood Drive Ann Arbor, MI 48103 / US | Inventor(s) | 01 /
WATANABE, Yukio 2992 S. Foxridge Court Ann Arbor, MI 48105 / US | 02 /
SAYERS, Michael 660 Archwood Drive Ann Arbor, MI 48103 / US | [2022/28] |
Former [2019/13] | 01 /
WATANABE, Yukio 660 Archwood Drive Ann Arbor, MI 48103 / US | ||
02 /
SAYERS, Michael 660 Archwood Drive Ann Arbor, MI 48103 / US | Representative(s) | Karakatsanis, Georgios Haft Karakatsanis Patent Law Office Stadtplatz 11 94209 Regen / DE | [N/P] |
Former [2019/13] | Karakatsanis, Georgios Haft Karakatsanis Patentanwaltskanzlei Dietlindenstrasse 18 80802 München / DE | Application number, filing date | 17799900.0 | 11.05.2017 | [2019/13] | WO2017US32132 | Priority number, date | US201662336702P | 15.05.2016 Original published format: US 201662336702 P | US201662344733P | 02.06.2016 Original published format: US 201662344733 P | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017200835 | Date: | 23.11.2017 | Language: | EN | [2017/47] | Type: | A1 Application with search report | No.: | EP3458345 | Date: | 27.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.11.2017 takes the place of the publication of the European patent application. | [2019/13] | Type: | B1 Patent specification | No.: | EP3458345 | Date: | 13.07.2022 | Language: | EN | [2022/28] | Search report(s) | International search report - published on: | US | 23.11.2017 | (Supplementary) European search report - dispatched on: | EP | 17.01.2020 | Classification | IPC: | B62H7/00, B60R21/00, B60T8/1755, B60T8/17 | [2020/08] | CPC: |
B60T8/1755 (EP,US);
B60T8/1706 (EP,US);
B60T8/321 (EP);
B60W10/06 (EP,US);
B60W10/18 (US);
B60W10/184 (EP,US);
B60W10/20 (EP,US);
B60W30/02 (EP,US);
B60W30/04 (US);
B60W30/18172 (EP,US);
B60W50/087 (EP);
B60W50/12 (EP);
B62J27/00 (EP,US);
B62L3/08 (EP,US);
F02B61/02 (US);
B60T2260/02 (EP,US);
B60W2030/043 (US);
B60W2050/0031 (EP,US);
B60W2300/36 (EP,US);
B60W2510/0604 (EP,US);
B60W2510/182 (EP,US);
B60W2520/125 (EP,US);
B60W2520/14 (EP,US);
B60W2520/18 (EP,US);
B60W2520/28 (EP,US);
B60W2540/10 (EP);
B60W2540/18 (EP,US);
B60W2710/0666 (EP,US);
B60W2710/182 (EP,US);
B60W2710/202 (US);
B60Y2200/12 (EP,US)
(-)
|
Former IPC [2019/13] | B62H7/00, B60R21/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR STABILISIERUNG VON MOTORRÄDERN | [2019/13] | English: | A SYSTEM AND METHOD TO STABILIZE MOTORCYCLES | [2019/13] | French: | SYSTÈME ET PROCÉDÉ DE STABILISATION DE MOTOS | [2019/13] | Entry into regional phase | 12.12.2018 | National basic fee paid | 12.12.2018 | Search fee paid | 12.12.2018 | Designation fee(s) paid | 12.12.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 12.12.2018 | Examination requested [2019/13] | 10.08.2020 | Amendment by applicant (claims and/or description) | 30.03.2022 | Communication of intention to grant the patent | 30.05.2022 | Receipt of the translation of the claim(s) | 07.06.2022 | Fee for grant paid | 07.06.2022 | Fee for publishing/printing paid | Opposition(s) | 14.04.2023 | No opposition filed within time limit [2023/25] | Fees paid | Renewal fee | 27.05.2019 | Renewal fee patent year 03 | 22.04.2020 | Renewal fee patent year 04 | 21.05.2021 | Renewal fee patent year 05 | 30.05.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 13.07.2022 | AT | 13.07.2022 | BG | 13.07.2022 | CZ | 13.07.2022 | DK | 13.07.2022 | EE | 13.07.2022 | ES | 13.07.2022 | FI | 13.07.2022 | HR | 13.07.2022 | IT | 13.07.2022 | LT | 13.07.2022 | LV | 13.07.2022 | MC | 13.07.2022 | NL | 13.07.2022 | PL | 13.07.2022 | RO | 13.07.2022 | RS | 13.07.2022 | SE | 13.07.2022 | SI | 13.07.2022 | SK | 13.07.2022 | SM | 13.07.2022 | NO | 13.10.2022 | GR | 14.10.2022 | IS | 13.11.2022 | PT | 14.11.2022 | [2024/51] |
Former [2024/11] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2024/09] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/37] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/29] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/23] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/22] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/21] | DK | 13.07.2022 | |
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/20] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/12] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/11] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/10] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/09] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/08] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
LT | 13.07.2022 | ||
NL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
Former [2023/06] | NL | 13.07.2022 | Documents cited: | Search | [Y]EP0575991 (HONDA MOTOR CO LTD [JP]) [Y] 5,11 * figure 1 * * claims 1-4,7 *; | [XY]DE102008011575 (CONTINENTAL TEVES AG & CO OHG [DE]) [X] 1,2,4,7,8,10 * paragraphs [0016] , [0017] , [0022] * * paragraph [0031] - paragraph [0034] * * claims 1-12 * [Y] 3,5,6,9,11,12; | [A]US2009084623 (DAGENAIS MARIO [CA]) [A] 6,11 * paragraphs [0005] , [0020] ** figure 3 *; | [XY]DE102010028689 (BOSCH GMBH ROBERT [DE]) [X] 1-3,7-9 * paragraphs [0002] , [0012] , [0013] * [Y] 4-6,10-12; | [Y]EP2657094 (BOSCH CORP [JP]) [Y] 3-6,9-12 * paragraphs [0036] , [0037] , [0068] * | International search | [Y]US6108599 (YAMAMOTO YORIHISA [JP], et al) [Y] 2-7, 13-18 * , col. 1, In. 14-21, col. 3, In. 4243, and col. 6, In. 29-33. *; | [XY]US2005197994 (FUJII SHIGERU [JP], et al) [X] 1, 12 * , para. [0057], [0060], [0077], [0079], [0084], [0088], [0099], [0114], [0248], [0270], and [0287], and Figs. 1, 2A, and 34, and Table 1. * [Y] 2-11, 13-22; | [Y]US2006204347 (WALDBAUER DIRK [DE], et al) [Y] 2-7, 10-11, 13-18, 21-22 * , para. [0011], [0016], [0046], and [0057]. *; | [A]US2010299028 (SAVARESI SERGIO MATTEO [IT], et al) [A] 1-22 * (entire document). *; | [Y]US2010324780 (KOUMURA SHINGO [JP], et al) [Y] 6-7, 17-18 * , para. [0145] and [0168]. *; | [Y]US2011264300 (TUONONEN ARI [FI]) [Y] 8-9, 19-20 * , para. [0005], [0016], [0024], [0030], and [0032]. *; | [Y]US2012298437 (DIETZ SCOTT GREGORY [US]) [Y] 10, 21 * , para. [0003] and [0044]. *; | [Y]US2014118855 (WHINNERY JOSEPH P W [US], et al) [Y] 11, 22 * , para. [0027] and [0029]. *; | [A]US2014236425 (SAVARESI SERGIO MATTEO [IT], et al) [A] 1-22 * (entire document). *; | [A]US2014277895 (SHANKWITZ CRAIG ROBERT [US], et al) [A] 1-22* (entire document). *; | [Y]US2016129737 (SINGH KANWAR BHARAT [US], et al) [Y] 10-11, 21-22 * , para. [0002] and [0040]. * | by applicant | DE102008011575 |