blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3548411

EP3548411 - CONFIGURING ACCESSING RIGHT TO ELEVATOR CONTROL SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.04.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  14.05.2021
FormerGrant of patent is intended
Status updated on  26.01.2021
FormerRequest for examination was made
Status updated on  06.09.2019
FormerThe international publication has been made
Status updated on  08.06.2018
Formerunknown
Status updated on  29.11.2017
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Inventio AG
Seestrasse 55
6052 Hergiswil / CH
[2021/24]
Former [2019/41]For all designated states
Inventio AG
Seestrasse 55
6052 Hergiswil / CH
Inventor(s)01 / CORTONA, Elena
Kurfirstenstrasse 26
8002 Zürich / CH
02 / SCHMID, Frankie
Eschenweg 14
6030 Ebikon / CH
 [2019/41]
Representative(s)Inventio AG
Seestrasse 55
6052 Hergiswil / CH
[N/P]
Application number, filing date17801053.423.11.2017
[2019/41]
WO2017EP80167
Priority number, dateEP2016020129030.11.2016         Original published format: EP 16201290
[2019/41]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018099793
Date:07.06.2018
Language:EN
[2018/23]
Type: A1 Application with search report 
No.:EP3548411
Date:09.10.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 07.06.2018 takes the place of the publication of the European patent application.
[2019/41]
Type: B1 Patent specification 
No.:EP3548411
Date:16.06.2021
Language:EN
[2021/24]
Search report(s)International search report - published on:EP07.06.2018
ClassificationIPC:B66B1/34, B66B5/00
[2019/41]
CPC:
B66B5/0087 (EP,US); B66B1/3453 (US); B66B1/34 (EP,US);
B66B1/3461 (US); B66B19/00 (US); G07C9/215 (US);
H04W76/10 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/41]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:KONFIGURIEREN VON ZUGRIFFSRECHTEN AUF EIN AUFZUGSSTEUERUNGSSYSTEM[2019/41]
English:CONFIGURING ACCESSING RIGHT TO ELEVATOR CONTROL SYSTEM[2019/41]
French:CONFIGURATION D'UN DROIT D'ACCÈS POUR SYSTÈME DE COMMANDE D'ASCENSEUR[2020/30]
Former [2019/41]CONFIGURATION D'UN DROIT D'ACCÈS À UN SYSTÈME DE COMMANDE D'ASCENSEUR
Entry into regional phase26.04.2019National basic fee paid 
26.04.2019Designation fee(s) paid 
26.04.2019Examination fee paid 
Examination procedure26.04.2019Examination requested  [2019/41]
26.04.2019Date on which the examining division has become responsible
27.01.2021Communication of intention to grant the patent
11.05.2021Fee for grant paid
11.05.2021Fee for publishing/printing paid
11.05.2021Receipt of the translation of the claim(s)
Opposition(s)17.03.2022No opposition filed within time limit [2022/21]
Fees paidRenewal fee
26.11.2019Renewal fee patent year 03
27.11.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.11.2017
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
[2024/23]
Former [2023/33]HU23.11.2017
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
Former [2023/30]AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
Former [2022/48]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
Former [2022/36]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
LU23.11.2021
BE30.11.2021
Former [2022/34]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
LU23.11.2021
BE30.11.2021
Former [2022/33]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
BE30.11.2021
Former [2022/29]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/26]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/21]AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/10]AT16.06.2021
CZ16.06.2021
EE16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/09]AT16.06.2021
CZ16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
PT18.10.2021
Former [2022/08]AT16.06.2021
CZ16.06.2021
ES16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2022/07]AT16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/51]HR16.06.2021
LT16.06.2021
LV16.06.2021
RS16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/49]HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/47]LT16.06.2021
BG16.09.2021
Former [2021/46]LT16.06.2021
Cited inInternational search[A]JP2006143361  (HITACHI BUILDING SYS CO LTD) [A] 1-12* abstract *;
 [A]US2011247901  (WILKE MICHAEL [DE], et al) [A] 1-12 * abstract *
by applicantWO9935076
 WO2011034527
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.