EP3532158 - SYSTEMS FOR ACTIVITY LEVEL PACING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.10.2023 Database last updated on 03.01.2025 | |
Former | The patent has been granted Status updated on 11.11.2022 | ||
Former | Grant of patent is intended Status updated on 06.07.2022 | ||
Former | Request for examination was made Status updated on 02.08.2019 | ||
Former | The international publication has been made Status updated on 05.05.2018 | ||
Former | unknown Status updated on 06.12.2017 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Cardiac Pacemakers, Inc. 4100 Hamline Avenue North St. Paul, Minnesota 55112 / US | [2019/36] | Inventor(s) | 01 /
HUELSKAMP, Paul 1554 Albert St. N. St. Paul Minnesota 55108 / US | 02 /
KANE, Michael J. 1439 Summit Avenue St. Paul Minnesota 55105 / US | 03 /
JUFFER, Lance Eric 6701 East Shadow Lake Drive Lino Lakes Minnesota 55014 / US | [2019/36] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Joachimsthaler Straße 10-12 10719 Berlin / DE | [2019/36] | Application number, filing date | 17804691.8 | 30.10.2017 | [2019/36] | WO2017US59063 | Priority number, date | US201662415132P | 31.10.2016 Original published format: US 201662415132 P | [2019/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018081721 | Date: | 03.05.2018 | Language: | EN | [2018/18] | Type: | A1 Application with search report | No.: | EP3532158 | Date: | 04.09.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.05.2018 takes the place of the publication of the European patent application. | [2019/36] | Type: | B1 Patent specification | No.: | EP3532158 | Date: | 14.12.2022 | Language: | EN | [2022/50] | Search report(s) | International search report - published on: | EP | 03.05.2018 | Classification | IPC: | A61N1/365, A61N1/37, A61N1/375 | [2019/36] | CPC: |
A61N1/36542 (EP,US);
A61B5/1116 (US);
A61B5/1118 (US);
A61B5/686 (US);
A61B5/7217 (US);
A61N1/36535 (US);
A61N1/37288 (US);
A61N1/37512 (US);
A61N1/3756 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEME ZUR AKTIVITÄTSGRADSTIMULATION | [2019/36] | English: | SYSTEMS FOR ACTIVITY LEVEL PACING | [2019/36] | French: | SYSTÈMES DE STIMULATION DE NIVEAU D'ACTIVITÉ | [2019/36] | Entry into regional phase | 29.05.2019 | National basic fee paid | 29.05.2019 | Designation fee(s) paid | 29.05.2019 | Examination fee paid | Examination procedure | 29.05.2019 | Examination requested [2019/36] | 29.05.2019 | Date on which the examining division has become responsible | 20.12.2019 | Amendment by applicant (claims and/or description) | 07.07.2022 | Communication of intention to grant the patent | 03.11.2022 | Fee for grant paid | 03.11.2022 | Fee for publishing/printing paid | 03.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 15.09.2023 | No opposition filed within time limit [2023/47] | Fees paid | Renewal fee | 15.10.2019 | Renewal fee patent year 03 | 14.10.2020 | Renewal fee patent year 04 | 21.10.2021 | Renewal fee patent year 05 | 21.10.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 14.12.2022 | AT | 14.12.2022 | BG | 14.12.2022 | CZ | 14.12.2022 | DK | 14.12.2022 | EE | 14.12.2022 | ES | 14.12.2022 | FI | 14.12.2022 | HR | 14.12.2022 | IT | 14.12.2022 | LT | 14.12.2022 | LV | 14.12.2022 | MC | 14.12.2022 | NL | 14.12.2022 | PL | 14.12.2022 | RO | 14.12.2022 | RS | 14.12.2022 | SE | 14.12.2022 | SI | 14.12.2022 | SK | 14.12.2022 | SM | 14.12.2022 | NO | 14.03.2023 | GR | 15.03.2023 | IS | 14.04.2023 | PT | 14.04.2023 | [2024/51] |
Former [2024/28] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
DK | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
IT | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
MC | 14.12.2022 | ||
NL | 14.12.2022 | ||
PL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SI | 14.12.2022 | ||
SK | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
IS | 14.04.2023 | ||
PT | 14.04.2023 | ||
Former [2024/26] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
DK | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
IT | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
PL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SI | 14.12.2022 | ||
SK | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
IS | 14.04.2023 | ||
PT | 14.04.2023 | ||
Former [2023/51] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
DK | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
PL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SI | 14.12.2022 | ||
SK | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
IS | 14.04.2023 | ||
PT | 14.04.2023 | ||
Former [2023/46] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
DK | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
PL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SK | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
IS | 14.04.2023 | ||
PT | 14.04.2023 | ||
Former [2023/39] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
PL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SK | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
IS | 14.04.2023 | ||
PT | 14.04.2023 | ||
Former [2023/38] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
PL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SK | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
PT | 14.04.2023 | ||
Former [2023/37] | AL | 14.12.2022 | |
AT | 14.12.2022 | ||
CZ | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
PT | 14.04.2023 | ||
Former [2023/35] | AT | 14.12.2022 | |
CZ | 14.12.2022 | ||
EE | 14.12.2022 | ||
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
RO | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
PT | 14.04.2023 | ||
Former [2023/34] | EE | 14.12.2022 | |
ES | 14.12.2022 | ||
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
PT | 14.04.2023 | ||
Former [2023/33] | ES | 14.12.2022 | |
FI | 14.12.2022 | ||
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
SM | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
Former [2023/29] | FI | 14.12.2022 | |
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
NL | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
Former [2023/25] | FI | 14.12.2022 | |
HR | 14.12.2022 | ||
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
RS | 14.12.2022 | ||
SE | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
Former [2023/23] | FI | 14.12.2022 | |
LT | 14.12.2022 | ||
LV | 14.12.2022 | ||
SE | 14.12.2022 | ||
NO | 14.03.2023 | ||
GR | 15.03.2023 | ||
Former [2023/22] | FI | 14.12.2022 | |
LT | 14.12.2022 | ||
SE | 14.12.2022 | ||
NO | 14.03.2023 | ||
Former [2023/20] | LT | 14.12.2022 | |
NO | 14.03.2023 | Cited in | International search | [A]US5243979 (STEIN PAUL M [US], et al) [A] 1-14 * the whole document *; | [A]US2008004664 (HOPPER DONALD L [US], et al) [A] 1-14 * the whole document *; | [XAI]US2015360036 (KANE MICHAEL J [US], et al) [X] 1,11-13 * paragraphs [0067] - [0124]; figures 1, 6-7 * [A] 6-8 [I] 2-5,9,10,14; | [A]US2016250480 (SHELDON TODD J [US], et al) [A] 1-14* the whole document * |