EP3552406 - TRANSDUCER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 20.04.2021 | ||
Former | Request for examination was made Status updated on 13.09.2019 | ||
Former | The international publication has been made Status updated on 16.06.2018 | ||
Former | unknown Status updated on 12.12.2017 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states BAE Systems PLC 6 Carlton Gardens London SW1Y 5AD / GB | [2019/42] | Inventor(s) | 01 /
KENT, Lionel, William, John BAE Systems Applied Intelligence Labs Chelmsford Technology Park Essex Chelmsford Essex CM2 8HN / GB | [2019/42] | Representative(s) | BAE SYSTEMS plc Group IP Department Warwick House P.O. Box 87 Farnborough Aerospace Centre Farnborough Hampshire GU14 6YU / GB | [2021/29] |
Former [2019/42] | BAE SYSTEMS plc Group IP Department Farnborough Aerospace Centre Farnborough Hampshire GU14 6YU / GB | Application number, filing date | 17807919.0 | 27.11.2017 | [2019/42] | WO2017GB53557 | Priority number, date | GB20160020851 | 08.12.2016 Original published format: GB 201620851 | GB20170011609 | 19.07.2017 Original published format: GB 201711609 | EP20170275112 | 19.07.2017 Original published format: EP 17275112 | [2019/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018104703 | Date: | 14.06.2018 | Language: | EN | [2018/24] | Type: | A1 Application with search report | No.: | EP3552406 | Date: | 16.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.06.2018 takes the place of the publication of the European patent application. | [2019/42] | Type: | B1 Patent specification | No.: | EP3552406 | Date: | 21.07.2021 | Language: | EN | [2021/29] | Search report(s) | International search report - published on: | EP | 14.06.2018 | Classification | IPC: | H04R1/24, H04B11/00, H04R17/00, G01N29/24 | [2019/42] | CPC: |
B06B1/0618 (EP,US);
H04B11/00 (EP,GB,US);
H04R17/10 (GB,US);
B06B1/06 (GB);
B06B1/0644 (US);
G01N29/28 (US);
G01S7/521 (EP,US);
G10K11/002 (US);
G10K11/02 (EP,US);
H04B1/40 (US);
H04L27/0002 (US);
H04R17/00 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | WANDLER | [2019/42] | English: | TRANSDUCER | [2019/42] | French: | TRANSDUCTEUR | [2019/42] | Entry into regional phase | 13.06.2019 | National basic fee paid | 13.06.2019 | Designation fee(s) paid | 13.06.2019 | Examination fee paid | Examination procedure | 13.06.2019 | Examination requested [2019/42] | 13.06.2019 | Date on which the examining division has become responsible | 23.01.2020 | Amendment by applicant (claims and/or description) | 21.04.2021 | Communication of intention to grant the patent | 14.06.2021 | Fee for grant paid | 14.06.2021 | Fee for publishing/printing paid | 14.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 28.11.2019 | Renewal fee patent year 03 | 27.11.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.11.2017 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | ES | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | IT | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | IE | 27.11.2021 | LU | 27.11.2021 | BE | 30.11.2021 | CH | 30.11.2021 | LI | 30.11.2021 | [2024/23] |
Former [2023/33] | HU | 27.11.2017 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 27.11.2021 | ||
LU | 27.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2023/30] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 27.11.2021 | ||
LU | 27.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/48] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 27.11.2021 | ||
LU | 27.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/37] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 27.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/36] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 27.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/34] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 27.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/33] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/25] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SK | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
RS | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NO | 21.10.2021 | Cited in | International search | [A]GB2052917 (HEWLETT PACKARD CO) [A] 1-11 * figure 1 ** page 3, line 7 - line 58 *; | [A]US7694570 (DAM NAIM [US], et al) [A] 1-11 * figures 1-6 * * column 3, line 33 - line 42 * |