EP3548235 - SLITTING MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.03.2023 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 15.04.2022 | ||
Former | Grant of patent is intended Status updated on 09.12.2021 | ||
Former | Examination is in progress Status updated on 02.06.2020 | ||
Former | Request for examination was made Status updated on 06.09.2019 | ||
Former | The international publication has been made Status updated on 08.06.2018 | ||
Former | unknown Status updated on 16.12.2017 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Rollem Patent Products Limited Units 3A Wentworth Way Tankersley, Barnsley South Yorkshire S75 3DH / GB | [2019/41] | Inventor(s) | 01 /
MURPHY, Stuart John Rollem House 3A Wentworth Way Tankersley Barnsley South Yorkshire S75 3DH / GB | [2019/41] | Representative(s) | Froud, Christopher Andrew Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [2022/19] |
Former [2019/41] | Froud, Christopher Andrew Withers & Rogers LLP 4 More London Riverside London, SE1 2AU / GB | Application number, filing date | 17809355.5 | 30.11.2017 | [2019/41] | WO2017GB53626 | Priority number, date | GB20160020368 | 30.11.2016 Original published format: GB 201620368 | [2019/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018100388 | Date: | 07.06.2018 | Language: | EN | [2018/23] | Type: | A1 Application with search report | No.: | EP3548235 | Date: | 09.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.06.2018 takes the place of the publication of the European patent application. | [2019/41] | Type: | B1 Patent specification | No.: | EP3548235 | Date: | 18.05.2022 | Language: | EN | [2022/20] | Search report(s) | International search report - published on: | EP | 07.06.2018 | Classification | IPC: | B26F1/20, B26D1/24, B26D9/00 | [2019/41] | CPC: |
B26F1/20 (EP,US);
B26D1/0006 (EP,GB,US);
B23D19/06 (US);
B26D1/151 (EP,US);
B26D1/1575 (GB);
B26D1/205 (GB);
B26D1/24 (EP,US);
B26D11/00 (GB);
B26D5/02 (EP);
B26D7/18 (EP,US);
B26D7/2635 (EP,US);
B26D9/00 (EP,GB,US);
B23D5/02 (US);
B26D2001/0033 (GB);
B26D2001/0046 (EP,GB,US);
B26D2001/006 (EP,GB,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG ZUM SLITTEN | [2021/09] | English: | SLITTING MACHINE | [2019/41] | French: | DÉCOUPEUSE DE TYPE SLITTER | [2021/09] |
Former [2019/41] | SCHLITZMASCHINE | ||
Former [2019/41] | MACHINE À REFENDRE | Entry into regional phase | 27.06.2019 | National basic fee paid | 27.06.2019 | Designation fee(s) paid | 27.06.2019 | Examination fee paid | Examination procedure | 27.06.2019 | Examination requested [2019/41] | 27.06.2019 | Date on which the examining division has become responsible | 20.01.2020 | Amendment by applicant (claims and/or description) | 05.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 21.09.2020 | Reply to a communication from the examining division | 15.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 24.05.2021 | Reply to a communication from the examining division | 10.12.2021 | Communication of intention to grant the patent | 08.04.2022 | Fee for grant paid | 08.04.2022 | Fee for publishing/printing paid | 08.04.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 21.02.2023 | No opposition filed within time limit [2023/17] | Fees paid | Renewal fee | 10.01.2020 | Renewal fee patent year 03 | 27.11.2020 | Renewal fee patent year 04 | 10.11.2021 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 30.11.2019 | 03   M06   Fee paid on   10.01.2020 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.11.2017 | CY | 11.05.2022 | MK | 11.05.2022 | MT | 11.05.2022 | AL | 18.05.2022 | AT | 18.05.2022 | BG | 18.05.2022 | CZ | 18.05.2022 | DK | 18.05.2022 | EE | 18.05.2022 | ES | 18.05.2022 | FI | 18.05.2022 | HR | 18.05.2022 | LT | 18.05.2022 | LV | 18.05.2022 | MC | 18.05.2022 | NL | 18.05.2022 | RO | 18.05.2022 | RS | 18.05.2022 | SE | 18.05.2022 | SI | 18.05.2022 | SK | 18.05.2022 | SM | 18.05.2022 | NO | 18.08.2022 | GR | 19.08.2022 | IS | 18.09.2022 | PT | 19.09.2022 | BE | 30.11.2022 | CH | 30.11.2022 | FR | 30.11.2022 | IE | 30.11.2022 | LI | 30.11.2022 | LU | 30.11.2022 | [2024/51] |
Former [2024/42] | HU | 30.11.2017 | |
CY | 11.05.2022 | ||
MK | 11.05.2022 | ||
MT | 11.05.2022 | ||
AL | 18.05.2022 | ||
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2024/27] | HU | 30.11.2017 | |
CY | 11.05.2022 | ||
MK | 11.05.2022 | ||
AL | 18.05.2022 | ||
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2024/21] | HU | 30.11.2017 | |
CY | 11.05.2022 | ||
AL | 18.05.2022 | ||
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2024/18] | HU | 30.11.2017 | |
AL | 18.05.2022 | ||
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2023/52] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2023/49] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2023/48] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
CH | 30.11.2022 | ||
IE | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2023/37] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
LU | 30.11.2022 | ||
Former [2023/35] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
MC | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
Former [2023/25] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SI | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
Former [2023/17] | AL | 18.05.2022 | |
AT | 18.05.2022 | ||
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
Former [2023/09] | AT | 18.05.2022 | |
CZ | 18.05.2022 | ||
DK | 18.05.2022 | ||
EE | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
RO | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
SK | 18.05.2022 | ||
SM | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
Former [2023/07] | AT | 18.05.2022 | |
DK | 18.05.2022 | ||
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
Former [2022/51] | AT | 18.05.2022 | |
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
IS | 18.09.2022 | ||
PT | 19.09.2022 | ||
Former [2022/50] | AT | 18.05.2022 | |
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
RS | 18.05.2022 | ||
SE | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
PT | 19.09.2022 | ||
Former [2022/49] | AT | 18.05.2022 | |
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
HR | 18.05.2022 | ||
LT | 18.05.2022 | ||
LV | 18.05.2022 | ||
NL | 18.05.2022 | ||
SE | 18.05.2022 | ||
BG | 18.08.2022 | ||
NO | 18.08.2022 | ||
GR | 19.08.2022 | ||
PT | 19.09.2022 | ||
Former [2022/48] | AT | 18.05.2022 | |
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
LT | 18.05.2022 | ||
NL | 18.05.2022 | ||
SE | 18.05.2022 | ||
NO | 18.08.2022 | ||
PT | 19.09.2022 | ||
Former [2022/47] | AT | 18.05.2022 | |
ES | 18.05.2022 | ||
FI | 18.05.2022 | ||
LT | 18.05.2022 | ||
SE | 18.05.2022 | ||
NO | 18.08.2022 | ||
PT | 19.09.2022 | Cited in | International search | [A]US3978752 (MEADEN THOMAS F, et al) [A] 1* figure - *; | [XA]US2003221772 (ALLWEIN ROBERT J [US], et al) [X] 1,2,8,12,13,15 * figure - * [A] 3-7,9-11,14,16,17; | [A]US2014121085 (KWARTA BRIAN J [US], et al) [A] 1-17 * the whole document * |