EP3529527 - PLUG-IN COUPLING SEAL FOR A FLUID LINE OF A DRIVE MOTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 13.05.2020 | ||
Former | Request for examination was made Status updated on 31.03.2020 | ||
Former | Grant of patent is intended Status updated on 18.03.2020 | ||
Former | Request for examination was made Status updated on 26.07.2019 | ||
Former | The international publication has been made Status updated on 28.04.2018 | ||
Former | unknown Status updated on 21.12.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Henn GmbH & Co KG. Steinebach 21 6850 Dornbirn / AT | [2019/35] | Inventor(s) | 01 /
BALDREICH, Wolfgang Ulrich-Fabri-Straße 3a 6850 Dornbirn / AT | [2019/35] | Representative(s) | Burger, Hannes Anwälte Burger & Partner Rechtsanwalt GmbH Rosenauerweg 16 4580 Windischgarsten / AT | [2019/35] | Application number, filing date | 17811825.3 | 18.10.2017 | [2019/35] | WO2017AT60269 | Priority number, date | AT20160050953 | 20.10.2016 Original published format: AT 509532016 | [2019/35] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018071937 | Date: | 26.04.2018 | Language: | DE | [2018/17] | Type: | A1 Application with search report | No.: | EP3529527 | Date: | 28.08.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application. | [2019/35] | Type: | B1 Patent specification | No.: | EP3529527 | Date: | 07.10.2020 | Language: | DE | [2020/41] | Search report(s) | International search report - published on: | EP | 26.04.2018 | Classification | IPC: | F16L37/088, F02M35/10, F16J15/02, F16J15/3204 | [2019/35] | CPC: |
F16L37/088 (EP,RU,US);
F02M35/10144 (EP,KR);
F02M37/0017 (KR);
F16J15/02 (KR);
F16J15/3204 (KR);
F16J15/3232 (KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | STECKKUPPLUNGSDICHTUNG FÜR EINE MEDIENLEITUNG EINES ANTRIEBSMOTORS | [2019/35] | English: | PLUG-IN COUPLING SEAL FOR A FLUID LINE OF A DRIVE MOTOR | [2019/35] | French: | JOINT D'ACCOUPLEMENT PAR EMBOÎTEMENT POUR UNE CONDUITE DE FLUIDE D'UN MOTEUR D'ENTRAÎNEMENT | [2019/35] | Entry into regional phase | 16.05.2019 | National basic fee paid | 16.05.2019 | Designation fee(s) paid | 16.05.2019 | Examination fee paid | Examination procedure | 02.08.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 16.05.2019 | Examination requested [2019/35] | 16.05.2019 | Date on which the examining division has become responsible | 19.03.2020 | Communication of intention to grant the patent | 30.03.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 14.05.2020 | Communication of intention to grant the patent | 27.08.2020 | Fee for grant paid | 27.08.2020 | Fee for publishing/printing paid | 27.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Fees paid | Renewal fee | 15.10.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.10.2017 | AL | 07.10.2020 | CY | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | MT | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | TR | 07.10.2020 | IE | 18.10.2020 | LU | 18.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | [2022/33] |
Former [2022/27] | HU | 18.10.2017 | |
AL | 07.10.2020 | ||
CY | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
MT | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
TR | 07.10.2020 | ||
IE | 18.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2022/23] | AL | 07.10.2020 | |
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 18.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2022/10] | AL | 07.10.2020 | |
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 18.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/50] | AL | 07.10.2020 | |
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 18.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/46] | AL | 07.10.2020 | |
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 18.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/45] | AL | 07.10.2020 | |
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/37] | DK | 07.10.2020 | |
EE | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/36] | EE | 07.10.2020 | |
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/35] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/34] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/33] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/32] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 18.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/31] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
LU | 18.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/30] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/28] | FI | 07.10.2020 | |
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/25] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/24] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
RS | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/23] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
RS | 07.10.2020 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/22] | FI | 07.10.2020 | |
RS | 07.10.2020 | ||
NO | 07.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/21] | FI | 07.10.2020 | |
PT | 08.02.2021 | ||
Former [2021/20] | FI | 07.10.2020 | Cited in | International search | [X]JPS63178669U (.) [X] 1-7,10 * the whole document *; | [XYI]GB2296070 (NOK CORP [JP]) [X] 1-9 * page 4, line 27 - page 9, line l * * figure - * [Y] 13 [I] 10-12; | [X]JPH08184377 (NOK CORP) [X] 1-7 * abstract *; | [Y]WO2005103551 (HENN GMBH & CO KG [AT], et al) [Y] 13 * page 1 ** figure - * |