EP3458147 - SYSTEMS FOR STIMULATION TO ENHANCE STROKE RECOVERY [Right-click to bookmark this link] | |||
Former [2019/13] | SYSTEMS METHODS AND DEVICES FOR CLOSED-LOOP STIMULATION TO ENHANCE STROKE RECOVERY | ||
[2022/33] | Status | No opposition filed within time limit Status updated on 10.11.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 02.12.2022 | ||
Former | Grant of patent is intended Status updated on 10.08.2022 | ||
Former | Examination is in progress Status updated on 25.06.2021 | ||
Former | Request for examination was made Status updated on 22.02.2019 | ||
Former | The international publication has been made Status updated on 29.12.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Regents of the University of California 1111 Franklin Street, 12th Floor Oakland, CA 94607 / US | [2019/13] | Inventor(s) | 01 /
GANGULY, Karunesh 1700 Owens Street San Francisco, California 94158 / US | 02 /
GULATI, Tanuj 1700 Owens Street San Francisco, California 94158 / US | 03 /
RAMANATHAN, Dhakshin 1700 Owens Street San Francisco, California 94158 / US | [2019/13] | Representative(s) | Appleyard Lees IP LLP 15 Clare Road Halifax HX1 2HY / GB | [2019/13] | Application number, filing date | 17816375.4 | 26.06.2017 | [2019/13] | WO2017US39293 | Priority number, date | US201662354543P | 24.06.2016 Original published format: US 201662354543 P | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017223564 | Date: | 28.12.2017 | Language: | EN | [2017/52] | Type: | A1 Application with search report | No.: | EP3458147 | Date: | 27.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.12.2017 takes the place of the publication of the European patent application. | [2019/13] | Type: | B1 Patent specification | No.: | EP3458147 | Date: | 04.01.2023 | Language: | EN | [2023/01] | Search report(s) | International search report - published on: | US | 28.12.2017 | (Supplementary) European search report - dispatched on: | EP | 09.12.2019 | Classification | IPC: | A61N1/04, A61N1/05, A61N1/32, A61N1/36 | [2019/13] | CPC: |
A61N1/0529 (EP,US);
A61N1/36103 (US);
A61N1/20 (US);
A61N1/36003 (US);
A61N1/36017 (EP,US);
A61N1/36025 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEME ZUR STIMULATION ZUR VERBESSERTEN ERHOLUNG VON EINEM SCHLAGANFALL | [2022/33] | English: | SYSTEMS FOR STIMULATION TO ENHANCE STROKE RECOVERY | [2022/33] | French: | SYSTÈMES DE STIMULATION DESTINÉS À AMÉLIORER LA RÉCUPÉRATION SUITE À UN ACCIDENT VASCULAIRE CÉRÉBRAL | [2022/33] |
Former [2019/13] | SYSTEME, VERFAHREN UND VORRICHTUNGEN ZUR GESCHLOSSENEN STIMULATION ZUR VERBESSERTEN ERHOLUNG VON EINEM SCHLAGANFALL | ||
Former [2019/13] | SYSTEMS METHODS AND DEVICES FOR CLOSED-LOOP STIMULATION TO ENHANCE STROKE RECOVERY | ||
Former [2019/13] | SYSTÈMES, PROCÉDÉS ET DISPOSITIFS DE STIMULATION EN BOUCLE FERMÉE DESTINÉS À AMÉLIORER LA RÉCUPÉRATION SUITE À UN ACCIDENT VASCULAIRE CÉRÉBRAL | Entry into regional phase | 21.12.2018 | National basic fee paid | 21.12.2018 | Search fee paid | 21.12.2018 | Designation fee(s) paid | 21.12.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 21.12.2018 | Examination requested [2019/13] | 20.07.2020 | Amendment by applicant (claims and/or description) | 29.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 29.10.2021 | Reply to a communication from the examining division | 11.08.2022 | Communication of intention to grant the patent | 29.11.2022 | Fee for grant paid | 29.11.2022 | Fee for publishing/printing paid | 29.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 05.10.2023 | No opposition filed within time limit [2023/50] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 29.06.2020 | Renewal fee patent year 04 | 28.06.2021 | Renewal fee patent year 05 | 27.06.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 04.01.2023 | CZ | 04.01.2023 | DK | 04.01.2023 | EE | 04.01.2023 | ES | 04.01.2023 | FI | 04.01.2023 | HR | 04.01.2023 | IT | 04.01.2023 | LT | 04.01.2023 | LV | 04.01.2023 | MC | 04.01.2023 | NL | 04.01.2023 | PL | 04.01.2023 | RO | 04.01.2023 | RS | 04.01.2023 | SE | 04.01.2023 | SI | 04.01.2023 | SK | 04.01.2023 | SM | 04.01.2023 | NO | 04.04.2023 | GR | 05.04.2023 | IS | 04.05.2023 | PT | 04.05.2023 | IE | 26.06.2023 | LU | 26.06.2023 | BE | 30.06.2023 | CH | 30.06.2023 | [2024/26] |
Former [2024/24] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
IE | 26.06.2023 | ||
LU | 26.06.2023 | ||
BE | 30.06.2023 | ||
CH | 30.06.2023 | ||
Former [2024/21] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
IE | 26.06.2023 | ||
LU | 26.06.2023 | ||
Former [2024/15] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
LU | 26.06.2023 | ||
Former [2024/11] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/09] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/50] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/49] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/48] | AT | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/46] | AT | 04.01.2023 | |
DK | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/39] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/38] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/37] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/36] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/35] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
NO | 04.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/34] | ES | 04.01.2023 | |
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
PT | 04.05.2023 | ||
Former [2023/33] | ES | 04.01.2023 | |
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
Former [2023/31] | NL | 04.01.2023 | Documents cited: | Search | [Y]US2006015153 (GLINER BRADFORD E [US], et al) [Y] 2,9 * the whole document *; | [XY]US2011213440 (FOWLER BRAD [US], et al) [X] 1,3-8 * abstract * * paragraph [0025] - paragraph [0048] * * figures 1-4 * [Y] 2,9; | [A]WO2015069632 (UNIV NORTH CAROLINA [US]) [A] 1-9* the whole document *; | [XA] - ARMIN WALTER, "Dynamics of a Stimulation-evoked ECoG Potential During Stroke Rehabilitation - A Case Study :", PROCEEDINGS OF THE INTERNATIONAL CONGRESS ON NEUROTECHNOLOGY, ELECTRONICS AND INFORMATICS, (20130101), doi:10.5220/0004644302410248, ISBN 978-989-8565-80-8, pages 241 - 248, XP055647377 [X] 8 * page 241 - page 246 * [A] 1-7,9 DOI: http://dx.doi.org/10.5220/0004644302410248 | [AD] - TANUJ GULATI ET AL, "Robust Neuroprosthetic Control from the Stroke Perilesional Cortex", THE JOURNAL OF NEUROSCIENCE, US, (20150603), vol. 35, no. 22, doi:10.1523/JNEUROSCI.5007-14.2015, ISSN 0270-6474, pages 8653 - 8661, XP055647378 [AD] 1-9 * page 8653 - page 8660, column L * DOI: http://dx.doi.org/10.1523/JNEUROSCI.5007-14.2015 | International search | [Y]WO2007138598 (TYLERTON INTERNAT INC [GB], et al) [Y] 13-15 * ; page 4, lines 30-34; page 5, lines 1-9; page 57, lines 25-26; page 58, lines 11-12; page 77, lines 2-6 *; | [XY]US2008114417 (LEYDE KENT W [US]) [X] 19 * ; figure 5; paragraphs [0005], [0010], [0014], [0016], [0040]-[0042], [0060] * [Y] 18, 20; | [Y]US2010069995 (DANIELSSON INGELA [US]) [Y] 1-18 * ; paragraphs [0003], [0005], [0017], [0021], [0024], [0048]-[0055], [0059], [0074], [0078]; claim 3 *; | [Y]US2011218588 (JUNG HO CHUN [KR], et al) [Y] 18* ; abstract; DaraaraDh f00111 *; | [Y]US9113912 (MEHTA BANKIM H [US], et al) [Y] 13, 20 * ; figure 4G; column 2, lines 65-67; column 3, lines 1-4; column 3, lines 62-66; column 12, lines 46-54; column 14; lines 52-61; column 15, lines 30-33; column 16, lines 42-44 *; | [Y]US2016022168 (LUCZAK ARTUR [CA], et al) [Y] 1-18 * ; paragraphs [0008], [0035], [0163], [0164], [0171] * | by applicant | US2011213440 | - WALTER, A., Proc. Int. Congress on Neurotechnology, Electronics and Informatics, (20130000), pages 241 - 248 |