EP3560047 - AMPLIFIER SYSTEM WITH FREQUENCY DRIFT AND A PLURALITY OF OUTPUTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.11.2021 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 18.12.2020 | ||
Former | Grant of patent is intended Status updated on 02.08.2020 | ||
Former | Request for examination was made Status updated on 27.09.2019 | ||
Former | The international publication has been made Status updated on 30.06.2018 | ||
Former | unknown Status updated on 03.01.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Thales Tour Carpe Diem Place des Corolles Esplanade Nord 92400 Courbevoie / FR | [2019/44] | Inventor(s) | 01 /
JOUGLA, Paul THALES OPTRONIQUE S.A.S. 2 avenue Gay-Lussac 78995 Elancourt Cedex / FR | 02 /
LAUX, Sébastien THALES OPTRONIQUE S.A.S. 2 avenue Gay-Lussac 78995 Elancourt Cedex / FR | 03 /
SIMON-BOISSON, Christophe THALES OPTRONIQUE S.A.S. 2 avenue Gay-Lussac 78995 Elancourt Cedex / FR | 04 /
CHARBONNEAU, Mathilde THALES OPTRONIQUE S.A.S. 2 avenue Gay-Lussac 78995 Elancourt Cedex / FR | [2019/44] | Representative(s) | Atout PI Laplace Immeuble Up On 25 Boulevard Romain Rolland CS 40072 75685 Paris Cedex 14 / FR | [N/P] |
Former [2021/03] | Marks & Clerk France Immeuble "Visium" 22, avenue Aristide Briand 94117 Arcueil Cedex / FR | ||
Former [2019/44] | Joubert, Cécile Marks & Clerk France Counseils en Propriete Industrielle Immeuble "Visium" 22, avenue Aristide Briand 94117 Arcueil Cedex / FR | Application number, filing date | 17817705.1 | 07.12.2017 | [2019/44] | WO2017EP81876 | Priority number, date | FR20160001833 | 22.12.2016 Original published format: FR 1601833 | [2019/44] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2018114367 | Date: | 28.06.2018 | Language: | FR | [2018/26] | Type: | A1 Application with search report | No.: | EP3560047 | Date: | 30.10.2019 | Language: | FR | The application published by WIPO in one of the EPO official languages on 28.06.2018 takes the place of the publication of the European patent application. | [2019/44] | Type: | B1 Patent specification | No.: | EP3560047 | Date: | 20.01.2021 | Language: | FR | [2021/03] | Search report(s) | International search report - published on: | EP | 28.06.2018 | Classification | IPC: | H01S3/23, H01S3/00 | [2019/44] | CPC: |
H01S3/0057 (EP,KR,US);
G02B27/09 (RU);
G02B27/0944 (US);
H01S3/10 (RU);
H01S3/23 (RU);
H01S3/2316 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERSTÄRKERSYSTEM MIT FREQUENZDRIFT UND MEHREREN AUSGÄNGEN | [2019/44] | English: | AMPLIFIER SYSTEM WITH FREQUENCY DRIFT AND A PLURALITY OF OUTPUTS | [2019/44] | French: | CHAINE AMPLIFICATRICE A DERIVE DE FREQUENCE ET A PLUSIEURS SORTIES | [2019/44] | Entry into regional phase | 21.06.2019 | National basic fee paid | 21.06.2019 | Designation fee(s) paid | 21.06.2019 | Examination fee paid | Examination procedure | 21.06.2019 | Examination requested [2019/44] | 21.06.2019 | Date on which the examining division has become responsible | 03.08.2020 | Communication of intention to grant the patent | 05.11.2020 | Fee for grant paid | 05.11.2020 | Fee for publishing/printing paid | 05.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 21.10.2021 | No opposition filed within time limit [2021/52] | Fees paid | Renewal fee | 13.12.2019 | Renewal fee patent year 03 | 14.12.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.12.2017 | AL | 20.01.2021 | AT | 20.01.2021 | CY | 20.01.2021 | DK | 20.01.2021 | EE | 20.01.2021 | FI | 20.01.2021 | HR | 20.01.2021 | LT | 20.01.2021 | LV | 20.01.2021 | MC | 20.01.2021 | MK | 20.01.2021 | MT | 20.01.2021 | NL | 20.01.2021 | PL | 20.01.2021 | RS | 20.01.2021 | SI | 20.01.2021 | SK | 20.01.2021 | SM | 20.01.2021 | TR | 20.01.2021 | BG | 20.04.2021 | NO | 20.04.2021 | GR | 21.04.2021 | IS | 20.05.2021 | PT | 20.05.2021 | [2024/42] |
Former [2024/29] | HU | 07.12.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CY | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
MK | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
TR | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2024/23] | HU | 07.12.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CY | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
MK | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2023/33] | HU | 07.12.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CY | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2023/30] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CY | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2023/29] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2022/33] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2022/23] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2022/13] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2022/10] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2022/07] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/50] | AT | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/49] | AT | 20.01.2021 | |
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/48] | AT | 20.01.2021 | |
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/46] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/42] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/39] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/37] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/36] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
BG | 20.04.2021 | ||
NO | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/35] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
NO | 20.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/33] | FI | 20.01.2021 | |
LT | 20.01.2021 | ||
NO | 20.04.2021 | ||
PT | 20.05.2021 | Cited in | International search | [A]US2005265407 (BRAUN ALAN M [US], et al) [A] 1-6 * figures 1,2 ** the whole document *; | [A]US2013223460 (CHERIAUX GILLES [FR]) [A] 1-6 * paragraph [0073] - paragraph [0097]; figures 2,3,4 * * the whole document * * paragraph [0038] - paragraph [0041] * |