EP3563475 - POWER CONVERTER CIRCUIT AND METHOD FOR CONTROLLING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.11.2022 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 17.12.2021 | ||
Former | Grant of patent is intended Status updated on 21.07.2021 | ||
Former | Examination is in progress Status updated on 26.06.2020 | ||
Former | Request for examination was made Status updated on 04.10.2019 | ||
Former | The international publication has been made Status updated on 06.07.2018 | ||
Former | unknown Status updated on 06.01.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Hansastr. 27c 80686 München / DE | [2022/16] |
Former [2019/45] | For all designated states Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Hansastraße 27c 80686 München / DE | Inventor(s) | 01 /
YU, Zhe Kruhnskoppel 2E 24558 Henstedt-Ulzburg / DE | 02 /
KAPELS, Holger Lübecker Str. 136 23843 Bad Oldesloe / DE | 03 /
HOFFMANN, Klaus F. Simon-Wannewitz-Ring 12 22523 Hamburg / DE | [2019/45] | Representative(s) | Stöckeler, Ferdinand, et al Schoppe, Zimmermann, Stöckeler Zinkler, Schenk & Partner mbB Patentanwälte Radlkoferstrasse 2 81373 München / DE | [2019/45] | Application number, filing date | 17818583.1 | 21.12.2017 | [2019/45] | WO2017EP84191 | Priority number, date | DE201610125796 | 28.12.2016 Original published format: DE102016125796 | [2019/45] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018122116 | Date: | 05.07.2018 | Language: | DE | [2018/27] | Type: | A1 Application with search report | No.: | EP3563475 | Date: | 06.11.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 05.07.2018 takes the place of the publication of the European patent application. | [2019/45] | Type: | B1 Patent specification | No.: | EP3563475 | Date: | 19.01.2022 | Language: | DE | [2022/03] | Search report(s) | International search report - published on: | EP | 05.07.2018 | Classification | IPC: | H02M3/155, H02M1/42, H02M3/158, H02M1/00 | [2019/45] | CPC: |
H02M3/155 (EP,US);
H02M1/4225 (EP,US);
H02M1/4233 (EP,US);
H02M3/1582 (EP);
H02M1/0048 (EP);
Y02B70/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | STROMRICHTERSCHALTUNG UND VERFAHREN ZUR STEUERUNG DERSELBEN | [2019/45] | English: | POWER CONVERTER CIRCUIT AND METHOD FOR CONTROLLING SAME | [2019/45] | French: | CIRCUIT CONVERTISSEUR ET PROCÉDÉ PERMETTANT DE LE COMMANDER | [2019/45] | Entry into regional phase | 27.06.2019 | National basic fee paid | 27.06.2019 | Designation fee(s) paid | 27.06.2019 | Examination fee paid | Examination procedure | 27.06.2019 | Examination requested [2019/45] | 27.06.2019 | Date on which the examining division has become responsible | 12.02.2020 | Amendment by applicant (claims and/or description) | 30.06.2020 | Despatch of a communication from the examining division (Time limit: M06) | 11.01.2021 | Reply to a communication from the examining division | 22.07.2021 | Communication of intention to grant the patent | 01.12.2021 | Fee for grant paid | 01.12.2021 | Fee for publishing/printing paid | 01.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.10.2022 | No opposition filed within time limit [2022/52] | Fees paid | Renewal fee | 29.11.2019 | Renewal fee patent year 03 | 08.12.2020 | Renewal fee patent year 04 | 08.12.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2017 | AL | 19.01.2022 | CY | 19.01.2022 | CZ | 19.01.2022 | DK | 19.01.2022 | EE | 19.01.2022 | ES | 19.01.2022 | FI | 19.01.2022 | HR | 19.01.2022 | IT | 19.01.2022 | LT | 19.01.2022 | LV | 19.01.2022 | MC | 19.01.2022 | MK | 19.01.2022 | MT | 19.01.2022 | NL | 19.01.2022 | PL | 19.01.2022 | RO | 19.01.2022 | RS | 19.01.2022 | SE | 19.01.2022 | SI | 19.01.2022 | SK | 19.01.2022 | SM | 19.01.2022 | TR | 19.01.2022 | BG | 19.04.2022 | NO | 19.04.2022 | GR | 20.04.2022 | IS | 19.05.2022 | PT | 19.05.2022 | [2024/44] |
Former [2024/29] | HU | 21.12.2017 | |
AL | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
TR | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/27] | HU | 21.12.2017 | |
AL | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/21] | HU | 21.12.2017 | |
AL | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/18] | HU | 21.12.2017 | |
AL | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/35] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/10] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/01] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/49] | CZ | 19.01.2022 | |
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/48] | CZ | 19.01.2022 | |
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/47] | DK | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/46] | DK | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/42] | ES | 19.01.2022 | |
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/39] | ES | 19.01.2022 | |
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/36] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/35] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/34] | ES | 19.01.2022 | |
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/33] | LT | 19.01.2022 | |
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
Former [2022/30] | NL | 19.01.2022 | Cited in | International search | [I]EP1381135 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [I] 1 * paragraphs [0096] - [0102]; figure 15 *; | [I]US2005110471 (MAYEGA VALERIAN [US], et al) [I] 1,17 * paragraphs [0046] - [0057]; figures 5,7,8,9,10 *; | [A]JP2011130571 (DENSO CORP) [A] 23,24* figure 15 *; | [X]US2012326691 (KUAN CHIEN-WEI [TW], et al) [X] 1 * paragraphs [0026] , [0030]; figures 2,4,5,6,8 *; | [I]US2013234613 (MCCUNE JR EARL W [US]) [I] 1 * paragraphs [0045] , [0046]; figure 8 *; | [I]CN103326576 (SILERGY SEMICONDUCTOR TECHNOLOGY HANGZHOU CO LTD) [I] 1 * paragraphs [0088] , [0097]; figures 2B,2C,3 *; | [XI]US2015070952 (ISHII SADAO [JP], et al) [X] 1,17 * paragraphs [0023] - [0025] - [0027] - [0034]; figures 1,3,5,6,7 * [I] 2,4-7,9,11,12,14,16,23-26; | [A] - YU ZHE ET AL, "A novel control concept for high-efficiency power conversion with the bidirectional non-inverting buck-boost converter", 2016 18TH EUROPEAN CONFERENCE ON POWER ELECTRONICS AND APPLICATIONS (EPE'16 ECCE EUROPE), JOINTLY OWNED BY IEEE-PELS AND EPE ASSOCIATION, (20160905), doi:10.1109/EPE.2016.7695309, pages 1 - 10, XP032985026 [A] 1-26 * pages 2-8; figures 1,3,6 * DOI: http://dx.doi.org/10.1109/EPE.2016.7695309 | [A] - Zhe Yu ET AL, "High Efficiency Bidirectional DC-DC Converter with Wide Input and Output Voltage Ranges for Battery Systems", (20150521), URL: http://ieeexplore.ieee.org/ielx7/7148816/7148817/07149059.pdf?tp=&arnumber=7149059&isnumber=7148817, (20170117), XP055335994 [A] 1-26 * pages 399-402; figures 2,5 * | [A] - Zhe Yu ET AL, "Extreme High Efficiency Non-Inverting Buck-Boost Converter for Energy Storage Systems", (20160512), URL: http://ieeexplore.ieee.org/ielx7/7499335/7499336/07499359.pdf?tp=&arnumber=7499359&isnumber=7499336, (20170117), XP055336042 [A] 1-26 * pages 203-206; figures 2,3, * | Examination | EP1381135 | US2005110471 | JP2011130571 | US2012326691 | US2013234613 | US2015070952 | CN103326576B | - YU ZHE ET AL, "A novel control concept for high-efficiency power conversion with the bidirectional non-inverting buck-boost converter", 2016 18TH EUROPEAN CONFERENCE ON POWER ELECTRONICS AND APPLICATIONS (EPE'16 ECCE EUROPE), JOINTLY OWNED BY IEEE-PELS AND EPE ASSOCIATION, (20160905), doi:10.1109/EPE.2016.7695309, pages 1 - 10, XP032985026 DOI: http://dx.doi.org/10.1109/EPE.2016.7695309 | - Zhe Yu ET AL, "High Efficiency Bidirectional DC-DC Converter with Wide Input and Output Voltage Ranges for Battery Systems", (20150521), URL: http://ieeexplore.ieee.org/ielx7/7148816/7148817/07149059.pdf?tp=&arnumber=7149059&isnumber=7148817, (20170117), XP055335994 | - Zhe Yu ET AL, "Extreme High Efficiency Non-Inverting Buck-Boost Converter for Energy Storage Systems", (20160512), URL: http://ieeexplore.ieee.org/ielx7/7499335/7499336/07499359.pdf?tp=&arnumber=7499359&isnumber=7499336, (20170117), XP055336042 |