EP3729863 - A METHOD OF FORWARDING A RECEIVED MESSAGE IN A MESH NETWORK COMPRISING A PLURALITY OF COMMUNICATIVELY INTERCONNECTED MESH NODES AS WELL AS A CORRESPONDING MESH NODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.06.2023 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 08.07.2022 | ||
Former | Grant of patent is intended Status updated on 06.03.2022 | ||
Former | Request for examination was made Status updated on 07.01.2022 | ||
Former | Grant of patent is intended Status updated on 18.10.2021 | ||
Former | Request for examination was made Status updated on 25.09.2020 | ||
Former | The international publication has been made Status updated on 29.06.2019 | ||
Former | unknown Status updated on 12.01.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2022/32] |
Former [2020/44] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
DI MARCO, Piergiuseppe Via Della Monica 16 64100 Teramo / IT | 02 /
SKILLERMARK, Per Årstavägen 70 120 54 Årsta / SE | [2020/44] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2020/44] | Application number, filing date | 17823157.7 | 22.12.2017 | [2020/44] | WO2017EP84501 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019120580 | Date: | 27.06.2019 | Language: | EN | [2019/26] | Type: | A1 Application with search report | No.: | EP3729863 | Date: | 28.10.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.06.2019 takes the place of the publication of the European patent application. | [2020/44] | Type: | B1 Patent specification | No.: | EP3729863 | Date: | 10.08.2022 | Language: | EN | [2022/32] | Search report(s) | International search report - published on: | EP | 27.06.2019 | Classification | IPC: | H04W28/02, H04W40/32, H04W84/18, H04W40/14 | [2020/44] | CPC: |
H04W28/021 (EP,US);
H04L45/74 (US);
H04W40/246 (US);
H04W40/14 (EP,US);
H04W40/32 (EP,US);
H04W84/18 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUM WEITERLEITEN EINER EMPFANGENEN NACHRICHT IN EINEM MESH-NETZWERK MIT EINER VIELZAHL VON KOMMUNIKATIV VERBUNDENEN MESH-KNOTEN SOWIE ENTSPRECHENDER MESH-KNOTEN | [2020/44] | English: | A METHOD OF FORWARDING A RECEIVED MESSAGE IN A MESH NETWORK COMPRISING A PLURALITY OF COMMUNICATIVELY INTERCONNECTED MESH NODES AS WELL AS A CORRESPONDING MESH NODE | [2020/44] | French: | PROCÉDÉ DE TRANSFERT D'UN MESSAGE REÇU DANS UN RÉSEAU MAILLÉ COMPRENANT UNE PLURALITÉ DE NOEUDS MAILLÉS INTERCONNECTÉS EN COMMUNICATION AINSI QU'UN NOEUD MAILLÉ CORRESPONDANT | [2020/44] | Entry into regional phase | 27.05.2020 | National basic fee paid | 27.05.2020 | Designation fee(s) paid | 27.05.2020 | Examination fee paid | Examination procedure | 22.10.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 27.05.2020 | Examination requested [2020/44] | 27.05.2020 | Date on which the examining division has become responsible | 19.10.2021 | Communication of intention to grant the patent | 09.12.2021 | Fee for grant paid | 09.12.2021 | Fee for publishing/printing paid | 20.12.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.03.2022 | Communication of intention to grant the patent | 29.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.05.2023 | No opposition filed within time limit [2023/29] | Fees paid | Renewal fee | 30.06.2020 | Renewal fee patent year 03 | 28.12.2020 | Renewal fee patent year 04 | 27.12.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2017 | AL | 10.08.2022 | AT | 10.08.2022 | BG | 10.08.2022 | CY | 10.08.2022 | CZ | 10.08.2022 | DK | 10.08.2022 | EE | 10.08.2022 | ES | 10.08.2022 | FI | 10.08.2022 | HR | 10.08.2022 | IT | 10.08.2022 | LT | 10.08.2022 | LV | 10.08.2022 | MC | 10.08.2022 | MK | 10.08.2022 | MT | 10.08.2022 | NL | 10.08.2022 | PL | 10.08.2022 | RO | 10.08.2022 | RS | 10.08.2022 | SE | 10.08.2022 | SI | 10.08.2022 | SK | 10.08.2022 | SM | 10.08.2022 | NO | 10.11.2022 | GR | 11.11.2022 | IS | 10.12.2022 | PT | 12.12.2022 | IE | 22.12.2022 | LU | 22.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | FR | 31.12.2022 | LI | 31.12.2022 | [2024/44] |
Former [2024/34] | HU | 22.12.2017 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
BG | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
IT | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
MK | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/29] | HU | 22.12.2017 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
IT | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
MK | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 22.12.2017 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
IT | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MK | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/26] | HU | 22.12.2017 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
IT | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/24] | HU | 22.12.2017 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/52] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
LU | 22.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
LU | 22.12.2022 | ||
Former [2023/37] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/29] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/23] | AT | 10.08.2022 | |
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/22] | AT | 10.08.2022 | |
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/21] | DK | 10.08.2022 | |
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/20] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/12] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/11] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
PT | 12.12.2022 | ||
Former [2023/10] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
PT | 12.12.2022 | ||
Former [2023/09] | FI | 10.08.2022 | |
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
PT | 12.12.2022 | ||
Former [2023/08] | FI | 10.08.2022 | |
LT | 10.08.2022 | ||
NL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | Cited in | International search | [I]GB2517086 (CAMBRIDGE SILICON RADIO LTD [GB]) [I] 1,8,14,15 * page 18, line 16 - page 19, line 11; figures 8,9 *; | [XYI] - Anonymous, "Understanding Z-Wave Networks, Nodes & Devices", (20171125), pages 1 - 6, URL: https://web.archive.org/web/20171125210804/https://www.vesternet.com/resources/technology-indepth/understanding-z-wave-networks/, (20180829), XP055503246 [X] 1,8,14,15 * figure 9 * * page 3; figure 9 * * page 4; figure 9; table 2 * * page 1; figure 2 * * page 1 - page 2 * [Y] 4,5,7,11,12 [I] 2,3,9,10,13 | [Y] - Kai Ren, "Bluetooth Mesh Networking: Friendship | Bluetooth Technology Website", (20170824), pages 1 - 10, URL: http://blog.bluetooth.com/bluetooth-mesh-networking-series-friendship, (20180829), XP055503248 [Y] 4,5,7,11,12 * page 2 - page 3; figure 1 * * page 4; figure 3 * | [A] - Robin Heydon et al. - 13 July 2017 "Mesh Profile" 1-331 Bluetooth SIG, Inc. Received from the Internet: https://www.bluetooth.org/docman/handlers/downloaddoc.ashx?doc_id=429633 [retrieved on 2018-08-29], XP055503252 [A] 1-15 * chapter 5.3.1.4.3 * * chapter 2.3.10 - 2.3.11 * * chapter 3.6.6 * * chapter 4.3.2.67-68 * | Examination | - Perguiseppe Di Marco ET AL, "Bluetooth mesh networking", (20170722), pages 1 - 13, URL: https://www.ericsson.com/49d589/assets/local/publications/white-papers/wp-bluetooth-mesh_ver2_171115-c2.pdf, (20191106), XP055639642 |