EP3481299 - BLOOD COLLECTION TUBE HOLDER WITH SLIDE-ACTIVATED NEEDLE RETRACTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 25.11.2020 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The international publication has been made Status updated on 12.01.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Retractable Technologies, Inc. 511 Lobo Lane Little Elm, TX 75608 / US | For all designated states Shaw, Thomas J. 5310 Buena Vista Frisco, TX 75034 / US | [2019/20] | Inventor(s) | 01 /
SHAW, Thomas, J. 5310 Buena Vista Frisco, TX 75034 / US | 02 /
SMALL, Mark 47442 Caughern Lane Heavener, OK 74937 / US | 03 /
ZHU, Ni 1609 Singing Water Dr. Allen, TX 75013 / US | [2019/31] |
Former [2019/20] | 01 /
SHAW, Thomas, J. 5310 Buena Vista Frisco, TX 75034 / US | ||
02 /
SMALL, Mark 47442 Caughern Lane Heavener, OK 74937 / US | |||
03 /
ZHU, Ni 4406 Brigade Court Plano, TX 75024 / US | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/20] | Application number, filing date | 17824691.4 | 16.06.2017 | [2019/20] | WO2017US37839 | Priority number, date | US201615202179 | 05.07.2016 Original published format: US201615202179 | [2019/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018009329 | Date: | 11.01.2018 | Language: | EN | [2018/02] | Type: | A1 Application with search report | No.: | EP3481299 | Date: | 15.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.01.2018 takes the place of the publication of the European patent application. | [2019/20] | Type: | B1 Patent specification | No.: | EP3481299 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | International search report - published on: | US | 11.01.2018 | (Supplementary) European search report - dispatched on: | EP | 30.01.2020 | Classification | IPC: | A61B5/15, A61M5/32, A61B5/154 | [2020/10] | CPC: |
A61B5/15003 (EP);
A61B5/15 (KR);
A61B5/150656 (EP);
A61B5/154 (EP);
A61M5/32 (KR);
A61M5/3232 (EP);
A61B5/150259 (EP);
A61B5/150717 (EP);
A61B5/150732 (EP);
|
Former IPC [2019/20] | A61B5/15, A61M5/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BLUTENTNAHMERÖHRCHENHALTER MIT SCHIEBERAKTIVIERTEM NADELRÜCKZUG | [2019/20] | English: | BLOOD COLLECTION TUBE HOLDER WITH SLIDE-ACTIVATED NEEDLE RETRACTION | [2019/20] | French: | SUPPORT DE TUBE DE PRÉLÈVEMENT SANGUIN À RÉTRACTION D'AIGUILLE ACTIVÉE PAR COULISSEMENT. | [2019/20] | Entry into regional phase | 04.02.2019 | National basic fee paid | 04.02.2019 | Search fee paid | 04.02.2019 | Designation fee(s) paid | 04.02.2019 | Examination fee paid | Examination procedure | 04.02.2019 | Examination requested [2019/20] | 19.08.2020 | Amendment by applicant (claims and/or description) | 26.11.2020 | Communication of intention to grant the patent | 24.03.2021 | Fee for grant paid | 24.03.2021 | Fee for publishing/printing paid | 24.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 04.02.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.06.2017 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | MT | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | IE | 16.06.2021 | LU | 16.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | [2024/42] |
Former [2024/23] | HU | 16.06.2017 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
MK | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2023/33] | HU | 16.06.2017 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2023/30] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/21] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
IE | 16.06.2021 | ||
LU | 16.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
LU | 16.06.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/04] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/52] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [A]US5052403 (HABER TERRY M [US], et al) [A] 1-18 * ; entire document *; | [A]US5085640 (GIBBS ANDREW H [US]) [A] 1-18 * ; Figure 37 *; | [A]US2003171695 (ZURCHER ROBERT [US]) [A] 1-18 * ; figures 1-4, 9; paragraphs 35, 40-45 *; | [A]WO2005087102 (AUSTIN PETER GEORGE [AU], et al) [A] 1-18 * ; figures 1-3; page 3, lines 21-31; page 4, lines 1-15, 27-31; page 5, lines 28-35; page 6, lines 1-13, 27-34 *; | [A]US2012071790 (MAHURKAR SAKHARAM D [US]) [A] 1-18* ; entire document *; | [A]US2014171876 (SHAW THOMAS J [US], et al) [A] 1-18 * ; figures 1-5, 11, 15; paragraphs 16, 73-75, 80, 82 *; | [A]US2014276445 (SHAW THOMAS J [US], et al) [A] 1-18 * ; figures 1-10, 12; paragraphs 10, 28-31, 34 * | by applicant | US645962 | US5810775 | USRE39107E | USD645962S | USD660420S | US8469927 | US8496600 | US2014171876 | US2014276445 | US9247899 |