blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3558907

EP3558907 - PROCESS TO PREPARE PROPYLENE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.06.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  16.07.2021
FormerGrant of patent is intended
Status updated on  21.03.2021
FormerExamination is in progress
Status updated on  29.10.2020
FormerRequest for examination was made
Status updated on  27.09.2019
FormerThe international publication has been made
Status updated on  30.06.2018
Formerunknown
Status updated on  29.01.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Gasolfin B.V.
Anna Maria v Schuurmanlaan 11
3818 LS Amersfoort / NL
[2019/44]
Inventor(s)01 / FLETCHER, Raymond Paul
Merowingerstrasse 173
40225 Dusseldorf / DE
 [2019/44]
Representative(s)Cramwinckel, Michiel
Cramwinckel Consultancy
PO Box 169
8330 AD Steenwijk / NL
[N/P]
Former [2019/44]Cramwinckel, Michiel
Cramwinckel Consultancy
Kallenkoterallee 82 A
8331 AJ Steenwijk / NL
Application number, filing date17832106.319.12.2017
[2019/44]
WO2017NL50845
Priority number, dateUS201662437242P21.12.2016         Original published format: US 201662437242 P
NL2017201825630.01.2017         Original published format: NL 2018256
[2019/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018117820
Date:28.06.2018
Language:EN
[2018/26]
Type: A1 Application with search report 
No.:EP3558907
Date:30.10.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 28.06.2018 takes the place of the publication of the European patent application.
[2019/44]
Type: B1 Patent specification 
No.:EP3558907
Date:18.08.2021
Language:EN
[2021/33]
Search report(s)International search report - published on:EP28.06.2018
ClassificationIPC:C07C4/06, C07C11/06, C07C5/22, C07C9/12, B01J29/46, B01J29/40, C10G11/05, C10G11/10, C10G45/64, C10G55/06, C10G69/04
[2021/12]
CPC:
C07C4/06 (EP,US); B01J29/405 (EP); B01J29/46 (EP);
B01J29/70 (US); B01J29/76 (US); B01J37/04 (US);
B01J37/08 (US); B01J37/30 (US); C07C5/222 (EP);
C07C5/2708 (US); C10G11/05 (EP); C10G11/10 (EP);
C10G45/64 (EP); C10G55/06 (EP); C10G69/04 (EP);
B01J2229/183 (US); B01J2229/42 (EP); C07C2521/04 (US);
C07C2521/08 (US); C07C2521/12 (US); C07C2527/167 (US);
C07C2529/072 (EP,US); C07C2529/40 (US); C10G2300/1081 (EP);
C10G2400/20 (EP) (-)
C-Set:
C07C4/06, C07C11/06 (EP);
C07C5/222, C07C9/12 (EP)
Former IPC [2019/44]C07C4/06, C07C11/06, C07C5/22, C07C9/12, C10G11/05
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/44]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON PROPYLEN[2019/44]
English:PROCESS TO PREPARE PROPYLENE[2019/44]
French:PROCÉDÉ DE PRÉPARATION DE PROPYLÈNE[2019/44]
Entry into regional phase15.07.2019National basic fee paid 
15.07.2019Designation fee(s) paid 
15.07.2019Examination fee paid 
Examination procedure15.07.2019Examination requested  [2019/44]
15.07.2019Date on which the examining division has become responsible
21.01.2020Amendment by applicant (claims and/or description)
28.10.2020Despatch of a communication from the examining division (Time limit: M04)
09.11.2020Reply to a communication from the examining division
22.03.2021Communication of intention to grant the patent
22.06.2021Receipt of the translation of the claim(s)
12.07.2021Fee for grant paid
12.07.2021Fee for publishing/printing paid
Opposition(s)19.05.2022No opposition filed within time limit [2022/30]
Fees paidRenewal fee
27.12.2019Renewal fee patent year 03
28.12.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.12.2017
AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
MK18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
IE19.12.2021
LU19.12.2021
PT20.12.2021
CH31.12.2021
LI31.12.2021
[2024/23]
Former [2023/33]HU19.12.2017
AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
IE19.12.2021
LU19.12.2021
PT20.12.2021
CH31.12.2021
LI31.12.2021
Former [2023/30]AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
IE19.12.2021
LU19.12.2021
PT20.12.2021
CH31.12.2021
LI31.12.2021
Former [2023/03]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
IE19.12.2021
LU19.12.2021
PT20.12.2021
CH31.12.2021
LI31.12.2021
Former [2022/48]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
IE19.12.2021
LU19.12.2021
PT20.12.2021
Former [2022/46]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
LU19.12.2021
PT20.12.2021
Former [2022/36]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
IT18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/33]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/29]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/25]AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/24]AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/21]AT18.08.2021
DK18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RS18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/10]AT18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RS18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/09]AT18.08.2021
FI18.08.2021
LT18.08.2021
RS18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
PT20.12.2021
Former [2022/08]AT18.08.2021
FI18.08.2021
LT18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
Former [2022/07]AT18.08.2021
LT18.08.2021
NO18.11.2021
Cited inInternational search[XDAY]US2009099398  (WEGERER DAVID A [US], et al) [XD] 25-27 * paragraphs [0012] , [0 14]; claims 1, 6, 9, 10 * [A] 5,6 [Y] 1-4,7-24,28;
 [YA]US2015174565  (HODOSHIMA SHINYA [JP], et al) [Y] 1-4,7-24 * paragraphs [0001] , [0018] , [0123] * [A] 5,6;
 [AP]WO2016209074  (INOVACAT B V [NL]) [AP] 1-24 * page 6, line 14 - page 7, line 16 ** page 5, lines 3-8; claims 1, 14-16, 21 *;
 [Y]  - J.I. VILLEGAS, ET AL., "Isomerisation of n-butane to isobutane over Pt-modified Beta and ZSM-5 zeolite catalysts: Catalyst deactivation and regeneration", CHEMICAL ENGINEERING JOURNAL, Elsevier Sequoia, Lausanne, CH, vol. 120, no. 1-2, doi:10.1016/j.cej.2006.03.011, ISSN 1385-8947, (200607), pages 83 - 89, (20060701), XP028035874 [Y] 28 * abstract *

DOI:   http://dx.doi.org/10.1016/j.cej.2006.03.011
by applicantUS5171921
 US5245102
 US2009099398
    - B.R. WOOD et al., Journal of Catalysis, (20040000), vol. 225, pages 300 - 306
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.