blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3369520

EP3369520 - SOLDER ALLOY FOR PREVENTING FE EROSION, RESIN FLUX CORED SOLDER, WIRE SOLDER, RESIN FLUX CORED WIRE SOLDER, FLUX COATED SOLDER, SOLDER JOINT AND SOLDERING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  21.06.2019
FormerGrant of patent is intended
Status updated on  27.02.2019
FormerRequest for examination was made
Status updated on  03.08.2018
FormerThe international publication has been made
Status updated on  24.02.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
SENJU METAL INDUSTRY CO., LTD.
23 Senju-Hashido-cho Adachi-ku
Tokyo, 120-8555 / JP
[2019/13]
Former [2018/36]For all designated states
Senju Metal Industry Co., Ltd
23 Senju-Hashido-cho Adachi-ku
Tokyo 120-8555 / JP
Inventor(s)01 / SAITO Takashi
c/o SENJU METAL INDUSTRY CO. LTD.
23 Senju-Hashido-cho
Adachi-ku
Tokyo 120-8555 / JP
02 / YOSHIKAWA Shunsaku
c/o SENJU METAL INDUSTRY CO. LTD.
23 Senju-Hashido-cho
Adachi-ku
Tokyo 120-8555 / JP
03 / KURASAWA Yoko
c/o SENJU METAL INDUSTRY CO. LTD.
23 Senju-Hashido-cho
Adachi-ku
Tokyo 120-8555 / JP
 [2018/36]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2018/36]
Application number, filing date17841542.817.08.2017
[2018/36]
WO2017JP29530
Priority number, dateJP2016016157519.08.2016         Original published format: JP 2016161575
JP2016024841921.12.2016         Original published format: JP 2016248419
[2018/36]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018034320
Date:22.02.2018
Language:JA
[2018/08]
Type: A1 Application with search report 
No.:EP3369520
Date:05.09.2018
Language:EN
[2018/36]
Type: B1 Patent specification 
No.:EP3369520
Date:24.07.2019
Language:EN
[2019/30]
Search report(s)International search report - published on:JP22.02.2018
(Supplementary) European search report - dispatched on:EP04.10.2018
ClassificationIPC:B23K35/26, B23K3/02, B23K31/02, C22C13/00, C22C13/02, B23K101/42
[2018/36]
CPC:
B23K35/262 (EP,CN,KR,US); B23K35/26 (CN); B23K1/00 (CN);
B23K1/0016 (KR); B23K1/19 (EP,US); B23K35/0222 (CN);
B23K35/0227 (EP,CN,US); B23K35/0261 (EP,US); B23K35/3613 (EP,US);
B23K35/362 (CN); C22C13/00 (EP,CN,KR,US); C22C13/02 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/36]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:LÖTLEGIERUNG ZUR VERHINDERUNG VON EISENEROSION, HARZFLUSSMITTELGEFÜLLTES LOT, DRAHTLOT, HARZFLUSSMITTELGEFÜLLTES DRAHTLOT, FLUSSMITTELBESCHICHTETES LOT, LÖTVERBINDUNG UND LÖTVERFAHREN[2018/36]
English:SOLDER ALLOY FOR PREVENTING FE EROSION, RESIN FLUX CORED SOLDER, WIRE SOLDER, RESIN FLUX CORED WIRE SOLDER, FLUX COATED SOLDER, SOLDER JOINT AND SOLDERING METHOD[2018/36]
French:ALLIAGE DE BRASAGE POUR EMPÊCHER L'ÉROSION DU FE, BRASURE FOURRÉE DE FLUX DE RÉSINE, BRASURE EN FIL, BRASURE EN FIL FOURRÉ DE FLUX DE RÉSINE, BRASURE REVÊTUE DE FLUX, JOINT DE BRASURE ET PROCÉDÉ DE BRASAGE[2018/36]
Entry into regional phase29.05.2018Translation filed 
29.05.2018National basic fee paid 
29.05.2018Search fee paid 
29.05.2018Designation fee(s) paid 
29.05.2018Examination fee paid 
Examination procedure29.05.2018Examination requested  [2018/36]
29.05.2018Date on which the examining division has become responsible
28.12.2018Amendment by applicant (claims and/or description)
28.02.2019Communication of intention to grant the patent
06.06.2019Fee for grant paid
06.06.2019Fee for publishing/printing paid
06.06.2019Receipt of the translation of the claim(s)
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.08.2017
AL24.07.2019
AT24.07.2019
CY24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MK24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SM24.07.2019
IE17.08.2019
LU17.08.2019
BE31.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
[2022/32]
Former [2021/34]HU17.08.2017
AL24.07.2019
AT24.07.2019
CY24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SM24.07.2019
IE17.08.2019
LU17.08.2019
BE31.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2021/32]HU17.08.2017
AL24.07.2019
AT24.07.2019
CY24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SM24.07.2019
IE17.08.2019
LU17.08.2019
BE31.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2021/26]AL24.07.2019
AT24.07.2019
CY24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SM24.07.2019
IE17.08.2019
LU17.08.2019
BE31.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2020/37]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SM24.07.2019
IE17.08.2019
LU17.08.2019
BE31.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2020/36]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SM24.07.2019
IE17.08.2019
LU17.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2020/27]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
SM24.07.2019
LU17.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.02.2020
Former [2020/25]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
LU17.08.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.02.2020
Former [2020/24]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.02.2020
Former [2020/22]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2020/15]AL24.07.2019
AT24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2020/12]AT24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
Former [2020/11]AT24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
Former [2020/10]AT24.07.2019
LT24.07.2019
NL24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
Former [2020/08]LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/07]NL24.07.2019
Documents cited:Search[A]US2008159904  (LEWIS BRIAN G [US], et al) [A] 1-13 * examples 1-17; claims 1-25 *;
 [A]JP2012218002  (NANOJOIN KK, et al) [A] 1-13 * claims 1,2; table 1 *;
 [A]CN102513720B  (HARBIN INST TECHNOLOGY SHENZHEN GRADUATE SCHOOL) [A] 1-13* claim 1 *;
 [A]EP2883649  (SENJU METAL INDUSTRY CO [JP]) [A] 1-13 * paragraphs [0020] , [0046] , [0050] *
International search[A]JP2005153007  (HAKKO CO, et al) [A] 1-11 * , & US 2004/0141873 A1 *;
 [A]JP2012218002  (NANOJOIN KK, et al) [A] 1-11* , (Family: none) *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.