EP3519658 - SPACER FRAME ASSEMBLY [Right-click to bookmark this link] | |||
Former [2019/32] | TACTILE SPACER FRAME ASSEMBLY AND LOCKING MEMBER | ||
[2022/43] | Status | No opposition filed within time limit Status updated on 12.01.2024 Database last updated on 22.01.2025 | |
Former | The patent has been granted Status updated on 03.02.2023 | ||
Former | Grant of patent is intended Status updated on 26.10.2022 | ||
Former | Request for examination was made Status updated on 05.07.2019 | ||
Former | The international publication has been made Status updated on 07.04.2018 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states GED Integrated Solutions, Inc. 9280 Dutton Drive Twinsburg, Ohio 44087 / US | [2019/32] | Inventor(s) | 01 /
BRIESE, William 260 Valley Brook Boulevard Hinckley Ohio 44233 / US | 02 /
WEBER, Clifford J. 3543 Southern Road Richfield Ohio 44286 / US | 03 /
GRISMER, John 539 East Broadway Cuyahoga Falls Ohio 44221 / US | [2019/32] | Representative(s) | Wilson Gunn Centurion House 129 Deansgate Manchester M3 3WR / GB | [N/P] |
Former [2019/32] | Wilson Gunn Blackfriars House The Parsonage 5th Floor Manchester M3 2JA / GB | Application number, filing date | 17857525.4 | 29.09.2017 | [2019/32] | WO2017US54396 | Priority number, date | US201662402312P | 30.09.2016 Original published format: US 201662402312 P | [2019/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018064522 | Date: | 05.04.2018 | Language: | EN | [2018/14] | Type: | A1 Application with search report | No.: | EP3519658 | Date: | 07.08.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.04.2018 takes the place of the publication of the European patent application. | [2019/32] | Type: | B1 Patent specification | No.: | EP3519658 | Date: | 08.03.2023 | Language: | EN | [2023/10] | Search report(s) | International search report - published on: | US | 05.04.2018 | (Supplementary) European search report - dispatched on: | EP | 28.05.2020 | Classification | IPC: | E06B3/673, E06B3/66, E06B3/663, E06B3/667, E06B3/67, B21D53/74 | [2020/26] | CPC: |
E06B3/67313 (EP,RU,US);
B21D53/74 (EP,RU,US);
E06B3/667 (EP)
|
Former IPC [2019/32] | E06B3/673, E06B3/66, E06B3/663, E06B3/667, E06B3/67 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ABSTANDSHALTERRAHMENANORDNUNG | [2022/43] | English: | SPACER FRAME ASSEMBLY | [2022/43] | French: | ENSEMBLE CADRE ESPACEUR | [2022/43] |
Former [2019/32] | TAKTILE ABSTANDSHALTERRAHMENANORDNUNG UND VERRIEGELUNGSELEMENT | ||
Former [2019/32] | TACTILE SPACER FRAME ASSEMBLY AND LOCKING MEMBER | ||
Former [2019/32] | ENSEMBLE CADRE ESPACEUR TACTILE ET ÉLÉMENT DE VERROUILLAGE | Entry into regional phase | 30.04.2019 | National basic fee paid | 30.04.2019 | Search fee paid | 30.04.2019 | Designation fee(s) paid | 30.04.2019 | Examination fee paid | Examination procedure | 30.04.2019 | Examination requested [2019/32] | 22.12.2020 | Amendment by applicant (claims and/or description) | 27.10.2022 | Communication of intention to grant the patent | 24.01.2023 | Fee for grant paid | 24.01.2023 | Fee for publishing/printing paid | 24.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 11.12.2023 | No opposition filed within time limit [2024/07] | Fees paid | Renewal fee | 27.09.2019 | Renewal fee patent year 03 | 28.09.2020 | Renewal fee patent year 04 | 27.09.2021 | Renewal fee patent year 05 | 27.09.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 08.03.2023 | BG | 08.03.2023 | DK | 08.03.2023 | EE | 08.03.2023 | FI | 08.03.2023 | HR | 08.03.2023 | LT | 08.03.2023 | LV | 08.03.2023 | MC | 08.03.2023 | NL | 08.03.2023 | RO | 08.03.2023 | RS | 08.03.2023 | SE | 08.03.2023 | SI | 08.03.2023 | SK | 08.03.2023 | SM | 08.03.2023 | NO | 08.06.2023 | GR | 09.06.2023 | IS | 08.07.2023 | PT | 10.07.2023 | LU | 29.09.2023 | BE | 30.09.2023 | CH | 30.09.2023 | [2024/51] |
Former [2024/36] | AT | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
MC | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
LU | 29.09.2023 | ||
BE | 30.09.2023 | ||
CH | 30.09.2023 | ||
Former [2024/34] | AT | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
MC | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
LU | 29.09.2023 | ||
CH | 30.09.2023 | ||
Former [2024/28] | AT | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
MC | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
LU | 29.09.2023 | ||
Former [2024/25] | AT | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
LU | 29.09.2023 | ||
Former [2024/10] | AT | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
Former [2023/50] | AT | 08.03.2023 | |
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
Former [2023/49] | AT | 08.03.2023 | |
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
PT | 10.07.2023 | ||
Former [2023/48] | AT | 08.03.2023 | |
EE | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
PT | 10.07.2023 | ||
Former [2023/46] | FI | 08.03.2023 | |
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
PT | 10.07.2023 | ||
Former [2023/38] | FI | 08.03.2023 | |
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
NL | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
Former [2023/37] | FI | 08.03.2023 | |
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
Former [2023/36] | FI | 08.03.2023 | |
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
NO | 08.06.2023 | ||
Former [2023/35] | HR | 08.03.2023 | |
LT | 08.03.2023 | ||
RS | 08.03.2023 | ||
NO | 08.06.2023 | ||
Former [2023/34] | LT | 08.03.2023 | |
RS | 08.03.2023 | ||
Former [2023/33] | LT | 08.03.2023 | Documents cited: | Search | [X]DE3211890 (KRONENBERG EDUARD GMBH & CO [DE]); | [XA]EP0585534 (GLASS EQUIPMENT DEV INC [US]) | International search | [Y]US5313761 (LEOPOLD EDMUND A [US]); | [A]US2001047592 (SHAH ASHOK [US], et al); | [A]US2006075869 (CALCEI TOM [US], et al); | [A]US2006185294 (LANGER PAUL J [US], et al); | [Y]US2015361713 (BRIESE WILLIAM [US], et al); | [Y]US2016258205 (OQUENDO SAMMY H [US]) |