EP3539697 - MATERIAL FOR BUILT-UP EDGE FORMATION AND BUILT-UP EDGE FORMATION METHOD [Right-click to bookmark this link] | |||
Former [2019/38] | MEMBER FOR BUILT-UP EDGE FORMATION AND BUILT-UP EDGE FORMATION METHOD | ||
[2024/22] | Status | Examination is in progress Status updated on 17.07.2024 Database last updated on 20.07.2024 | |
Former | Grant of patent is intended Status updated on 09.05.2024 | ||
Former | Examination is in progress Status updated on 11.03.2022 | ||
Former | Request for examination was made Status updated on 16.08.2019 | ||
Former | The international publication has been made Status updated on 19.05.2018 | Most recent event Tooltip | 17.07.2024 | Deletion - Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | Applicant(s) | For all designated states Mitsubishi Gas Chemical Company, Inc. 5-2, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8324 / JP | [2019/38] | Inventor(s) | 01 /
MATSUYAMA, Yousuke c/o YONEZAWA DIA ELECTRONICS Co. Inc. 446-3 Hachimanpara 3-chome Yonezawa-shi Yamagata 992-1128 / JP | 02 /
HORIE, Shigeru c/o Mitsubishi Gas Chemical Company Inc. 5-2 Marunouchi 2-chome Chiyoda-ku Tokyo 100-8324 / JP | [2019/38] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2019/38] | Application number, filing date | 17869893.2 | 31.10.2017 | [2019/38] | WO2017JP39226 | Priority number, date | JP20160221942 | 14.11.2016 Original published format: JP 2016221942 | [2019/38] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018088267 | Date: | 17.05.2018 | Language: | JA | [2018/20] | Type: | A1 Application with search report | No.: | EP3539697 | Date: | 18.09.2019 | Language: | EN | [2019/38] | Search report(s) | International search report - published on: | JP | 17.05.2018 | (Supplementary) European search report - dispatched on: | EP | 25.10.2019 | Classification | IPC: | B23B35/00, B23C3/00, B26F1/16, B23P15/28 | [2024/22] | CPC: |
B23B35/00 (EP,US);
B23B51/06 (US);
B23C3/00 (EP);
B23P15/28 (EP);
B26F1/16 (EP);
B23B2226/275 (EP,US);
B23B2226/61 (EP,US);
B23B2228/52 (US);
B23C2226/27 (EP,US);
|
Former IPC [2019/48] | B23B27/14, B23B27/00, B23B51/00, B23C5/16, B23P15/28, B26F1/16, B23B35/00, B23C3/00 | ||
Former IPC [2019/38] | B23B27/14, B23B27/00, B23B51/00, B23C5/16, B23P15/28, B26F1/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/38] | Title | German: | WERKSTOFF ZUR FORMUNG EINER AUFGEBAUTEN KANTE UND VERFAHREN ZUR FORMUNG EINER AUFGEBAUTEN KANTE | [2024/22] | English: | MATERIAL FOR BUILT-UP EDGE FORMATION AND BUILT-UP EDGE FORMATION METHOD | [2024/22] | French: | MATÉRIAU POUR LA FORMATION D'UN BORD PAR ACCUMULATION ET PROCÉDÉ DE FORMATION DE BORD PAR ACCUMULATION | [2024/22] |
Former [2019/38] | ELEMENT ZUR FORMUNG EINER AUFGEBAUTEN KANTE UND VERFAHREN ZUR FORMUNG EINER AUFGEBAUTEN KANTE | ||
Former [2019/38] | MEMBER FOR BUILT-UP EDGE FORMATION AND BUILT-UP EDGE FORMATION METHOD | ||
Former [2019/38] | ÉLÉMENT POUR LA FORMATION D'UN BORD D'ACCUMULATION ET PROCÉDÉ DE FORMATION DE BORD INTÉGRÉ | Entry into regional phase | 16.04.2019 | Translation filed | 16.04.2019 | National basic fee paid | 16.04.2019 | Search fee paid | 16.04.2019 | Designation fee(s) paid | 16.04.2019 | Examination fee paid | Examination procedure | deleted | Communication of intention to grant the patent | 16.04.2019 | Examination requested [2019/38] | 24.02.2020 | Amendment by applicant (claims and/or description) | 14.03.2022 | Despatch of a communication from the examining division (Time limit: M04) | 13.07.2022 | Reply to a communication from the examining division | 10.05.2024 | Communication of intention to grant the patent | 17.07.2024 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | Fees paid | Renewal fee | 16.10.2019 | Renewal fee patent year 03 | 14.10.2020 | Renewal fee patent year 04 | 19.10.2021 | Renewal fee patent year 05 | 15.09.2022 | Renewal fee patent year 06 | 13.09.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X]EP0608920 (HOLDERS TECHNOLOGY PLC [GB]); | [X]US5909985 (SHIGA KIYOTAKA [JP], et al); | [XA]JP2013146819 (DENSO CORP); | [XA]US2016045961 (UMEHARA NORITSUGU [JP], et al) | International search | [A]JPH07112311 (OSG MFG) [A] 11* , paragraph [0007] (Family: none) *; | [Y]JP2002301632 (FUJI SEIKI KK) [Y] 9-10 * , paragraph [0011] (Family: none) *; | [XY]WO2014157570 (MITSUBISHI GAS CHEMICAL CO [JP]) [X] 1-8, 11-20 * , paragraphs [0162]-[0180] & US 2016/0045961 A1, paragraphs [0197]-[0214] & EP 2979832 A1 & CN 105073355 A * [Y] 9-10; | [A]WO2015152162 (MITSUBISHI GAS CHEMICAL CO [JP]) [A] 1 * , entire text, all drawings & US 2017/0111997 A1 * |