EP3550876 - METHOD AND APPARATUS FOR ESTABLISHING DRB [Right-click to bookmark this link] | Status | The application has been withdrawn Status updated on 02.10.2020 Database last updated on 24.07.2024 | |
Former | Examination is in progress Status updated on 30.06.2020 | ||
Former | Request for examination was made Status updated on 06.09.2019 | ||
Former | The international publication has been made Status updated on 07.07.2018 | Most recent event Tooltip | 02.10.2020 | Withdrawal of application | published on 04.11.2020 [2020/45] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2019/41] | Inventor(s) | 01 /
BYUN, Daewook IP Center LG Electronics Inc. 19 Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | 02 /
XU, Jian IP Center LG Electronics Inc. 19 Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | 03 /
KIM, Seokjung IP Center LG Electronics Inc. 19 Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | [2019/41] | Representative(s) | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte und Rechtsanwalt PartG mbB Schweigerstraße 2 81541 München / DE | [N/P] |
Former [2019/41] | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstrasse 2 81541 München / DE | Application number, filing date | 17887679.3 | 29.12.2017 | [2019/41] | WO2017KR15727 | Priority number, date | US201662440346P | 29.12.2016 Original published format: US 201662440346 P | US201762451009P | 26.01.2017 Original published format: US 201762451009 P | US201762520576P | 16.06.2017 Original published format: US 201762520576 P | US201762520578P | 16.06.2017 Original published format: US 201762520578 P | [2019/41] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018124810 | Date: | 05.07.2018 | Language: | KO | [2018/27] | Type: | A1 Application with search report | No.: | EP3550876 | Date: | 09.10.2019 | Language: | EN | [2019/41] | Search report(s) | International search report - published on: | KR | 05.07.2018 | (Supplementary) European search report - dispatched on: | EP | 22.10.2019 | Classification | IPC: | H04W76/12, // H04W28/24, H04W76/22 | [2019/47] | CPC: |
H04W76/12 (EP);
H04W28/0263 (US);
H04W28/16 (US);
H04W72/542 (US);
H04W28/24 (EP);
H04W76/22 (EP);
|
Former IPC [2019/41] | H04W28/02, H04W80/10, H04W88/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/41] | Title | German: | VERFAHREN UND VORRICHTUNG ZUR DRB-HERSTELLUNG | [2019/41] | English: | METHOD AND APPARATUS FOR ESTABLISHING DRB | [2019/41] | French: | PROCÉDÉ ET APPAREIL DESTINÉS À L'ÉTABLISSEMENT DE DRB | [2019/41] | Entry into regional phase | 04.07.2019 | Translation filed | 04.07.2019 | National basic fee paid | 04.07.2019 | Search fee paid | 04.07.2019 | Designation fee(s) paid | 04.07.2019 | Examination fee paid | Examination procedure | 04.07.2019 | Examination requested [2019/41] | 13.05.2020 | Amendment by applicant (claims and/or description) | 03.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.09.2020 | Application withdrawn by applicant [2020/45] | Fees paid | Renewal fee | 23.12.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI] - CATT, "DRB management and NR QoS", vol. RAN WG2, no. Kaohsiung; 20161010 - 20161014, (20161009), 3GPP DRAFT; R2-166113, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20161009), XP051150731 [X] 1,5,7,8,12,13 * Sections 2.1, 2.2 * [I] 2-4,6,9-11,14,15 | [XI] - HUAWEI ET AL, "DRB Management and QoS Control", vol. RAN WG2, no. Kaohsiung; 20161010 - 20161014, (20161001), 3GPP DRAFT; R2-166199, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_95bis/Docs/, (20161001), XP051162070 [X] 1,2,5,7,8,12-14 * Sections 2, 3.1 * [I] 3,4,6,9-11,15 | [XI] - QUALCOMM INCORPORATED, "Flow QoS support by NR", vol. RAN WG3, no. Sophia Antipolis, France; 20161010 - 20161014, (20161006), 3GPP DRAFT; R3-162193_FLOW QOS SUPPORT BY NR V1.1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20161006), XP051151854 [X] 1,13 * Sections 1-3 * [I] 2-12,14,15 | [A] - INTEL CORPORATION, "Supporting Next Gen QoS in NR", vol. RAN WG2, no. Reno, USA; 20161114 - 20161118, (20161118), 3GPP DRAFT; R2-169070-QOS-V5, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_96/Docs/, (20161118), XP051193505 [A] 1-15 * Section 2.1 * | [A] - QUALCOMM INCORPORATED, "Flow-DRB binding considerations", vol. RAN WG2, no. Reno, US; 20161114 - 20161118, (20161113), 3GPP DRAFT; R2-168614 FLOW DRB BINDING PROCEDURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20161113), XP051178184 [A] 1-15 * the whole document * | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on Architecture for Next Generation System (Release 14)", 3GPP STANDARD; 3GPP TR 23.799, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20161216), vol. SA WG2, no. V14.0.0, pages 1 - 522, XP051230010 [A] 1-15 * Sections 6.2.3.1, 6.4.16 and 8.4 * | International search | WO2014148749 [a] (LG ELECTRONICS INC [KR]) [a] 1-15; | [xaXA] - "3GPP TSG SA; A study on architecture for the next generation system (release 14)", 3GPP TR 23.799 V14.0.0, (20161216), XP051230010 [x] 1-4,7-15 [a] 5-6 | [A] - Nokia; Alcatel-Lucent Shanghai Bell; Samsung ETRI, "Interim agreement on Routing of NAS signalling and on How the AMF can select the proper SMF instance for a PDU session", SA WG2 meeting #118, RENO, Nevada, USA, (20161121), no. S2-166999, XP051200083 [A] 1-15 | [aA] - Huawei Hisilicon, "Update of interim agreements on MMF-SMF split", SA WG2 meeting #118, RENO, Nevada , USA, (20161108), no. S2-166676, XP051199646 [a] 1-15 | [aA] - Huawei HiSilicon, "NAS security termination point included in AMF", SA WG2 meeting #118, RENO, Nevada, USA, (20161108), no. S2-166675, XP051199645 [a] 1-15 |