| EP3564396 - METHOD FOR DEPHOSPHORIZATION OF MOLTEN IRON, AND REFINING AGENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.08.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 09.09.2022 | ||
| Former | Grant of patent is intended Status updated on 30.05.2022 | ||
| Former | Examination is in progress Status updated on 11.08.2021 | ||
| Former | Grant of patent is intended Status updated on 12.04.2021 | ||
| Former | Examination is in progress Status updated on 14.04.2020 | ||
| Former | Request for examination was made Status updated on 04.10.2019 | ||
| Former | The international publication has been made Status updated on 07.07.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states JFE Steel Corporation 2-3, Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | [2021/38] |
| Former [2019/45] | For all designated states JFE Steel Corporation 2-3, Uchisaiwaicho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | Inventor(s) | 01 /
FUJII, Yusuke c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 02 /
NAKAI, Yoshie c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 03 /
MORI, Mikihiro c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 04 /
MAEDA, Takahiko c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 05 /
KIKUCHI, Naoki c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | 06 /
NISHIGUCHI, Noritaka c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | [2022/26] |
| Former [2019/45] | 01 /
FUJII Yusuke c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | ||
| 02 /
NAKAI Yoshie c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | |||
| 03 /
MORI Mikihiro c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | |||
| 04 /
MAEDA Takahiko c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | |||
| 05 /
KIKUCHI Naoki c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | |||
| 06 /
NISHIGUCHI Noritaka c/o Intellectual Property Dept. JFE STEEL CORPORATION 2-3 Uchisaiwai-cho 2-chome Chiyoda-ku Tokyo 100-0011 / JP | Representative(s) | Haseltine Lake Kempner LLP Bürkleinstrasse 10 80538 München / DE | [2019/45] | Application number, filing date | 17887903.7 | 15.12.2017 | [2019/45] | WO2017JP45197 | Priority number, date | JP20160253633 | 27.12.2016 Original published format: JP 2016253633 | [2019/45] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018123666 | Date: | 05.07.2018 | Language: | JA | [2018/27] | Type: | A1 Application with search report | No.: | EP3564396 | Date: | 06.11.2019 | Language: | EN | [2019/45] | Type: | B1 Patent specification | No.: | EP3564396 | Date: | 12.10.2022 | Language: | EN | [2022/41] | Search report(s) | International search report - published on: | JP | 05.07.2018 | (Supplementary) European search report - dispatched on: | EP | 13.09.2019 | Classification | IPC: | C21C1/02, C21C7/064, C21C7/00, C21C7/076, C21C7/072, // C21C7/06 | [2020/44] | CPC: |
C21C1/02 (EP,RU);
C21C1/025 (EP,KR);
C21C7/0645 (US);
C21C5/4606 (KR);
C21C7/00 (RU);
C21C7/0037 (EP,US);
C21C7/0075 (EP,US);
C21C7/064 (EP);
C21C7/072 (EP);
|
| Former IPC [2019/45] | C21C1/02, C21C7/064, C21C7/00, C21C7/076 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR ENTPHOSPHORISIERUNG VON EISENSCHMELZE UND RAFFINIERUNGSMITTEL | [2019/45] | English: | METHOD FOR DEPHOSPHORIZATION OF MOLTEN IRON, AND REFINING AGENT | [2019/45] | French: | PROCÉDÉ DE DÉPHOSPHORATION DE FONTE LIQUIDE, ET AGENT D'AFFINAGE | [2019/45] | Entry into regional phase | 27.06.2019 | Translation filed | 27.06.2019 | National basic fee paid | 27.06.2019 | Search fee paid | 27.06.2019 | Designation fee(s) paid | 27.06.2019 | Examination fee paid | Examination procedure | 27.06.2019 | Examination requested [2019/45] | 19.02.2020 | Amendment by applicant (claims and/or description) | 17.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 31.07.2020 | Reply to a communication from the examining division | 26.11.2020 | Despatch of a communication from the examining division (Time limit: M02) | 22.01.2021 | Reply to a communication from the examining division | 13.04.2021 | Communication of intention to grant the patent | 09.08.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 30.08.2021 | Despatch of a communication from the examining division (Time limit: M02) | 28.10.2021 | Reply to a communication from the examining division | 31.05.2022 | Communication of intention to grant the patent | 28.07.2022 | Receipt of the translation of the claim(s) | 31.08.2022 | Fee for grant paid | 31.08.2022 | Fee for publishing/printing paid | Opposition(s) | 13.07.2023 | No opposition filed within time limit [2023/38] | Fees paid | Renewal fee | 19.12.2019 | Renewal fee patent year 03 | 21.12.2020 | Renewal fee patent year 04 | 21.12.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.12.2017 | AL | 12.10.2022 | AT | 12.10.2022 | BG | 12.10.2022 | CY | 12.10.2022 | CZ | 12.10.2022 | DK | 12.10.2022 | EE | 12.10.2022 | ES | 12.10.2022 | FI | 12.10.2022 | HR | 12.10.2022 | IT | 12.10.2022 | LT | 12.10.2022 | LV | 12.10.2022 | MC | 12.10.2022 | MK | 12.10.2022 | MT | 12.10.2022 | NL | 12.10.2022 | PL | 12.10.2022 | RO | 12.10.2022 | RS | 12.10.2022 | SE | 12.10.2022 | SI | 12.10.2022 | SK | 12.10.2022 | SM | 12.10.2022 | IE | 15.12.2022 | LU | 15.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | GB | 12.01.2023 | NO | 12.01.2023 | GR | 13.01.2023 | IS | 12.02.2023 | PT | 13.02.2023 | DE | 01.07.2023 | [2024/44] |
| Former [2024/34] | HU | 15.12.2017 | |
| AL | 12.10.2022 | ||
| AT | 12.10.2022 | ||
| BG | 12.10.2022 | ||
| CY | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| IT | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| MC | 12.10.2022 | ||
| MK | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2024/29] | HU | 15.12.2017 | |
| AL | 12.10.2022 | ||
| AT | 12.10.2022 | ||
| CY | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| IT | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| MC | 12.10.2022 | ||
| MK | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2024/27] | HU | 15.12.2017 | |
| AL | 12.10.2022 | ||
| AT | 12.10.2022 | ||
| CY | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| IT | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| MK | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2024/26] | HU | 15.12.2017 | |
| AL | 12.10.2022 | ||
| AT | 12.10.2022 | ||
| CY | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| IT | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2024/21] | HU | 15.12.2017 | |
| AL | 12.10.2022 | ||
| AT | 12.10.2022 | ||
| CY | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2024/18] | HU | 15.12.2017 | |
| AL | 12.10.2022 | ||
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2023/51] | AL | 12.10.2022 | |
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SI | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2023/49] | AL | 12.10.2022 | |
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2023/48] | AL | 12.10.2022 | |
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| DE | 01.07.2023 | ||
| Former [2023/47] | AL | 12.10.2022 | |
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| GB | 12.01.2023 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/38] | AL | 12.10.2022 | |
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SK | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| LU | 15.12.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/37] | AL | 12.10.2022 | |
| AT | 12.10.2022 | ||
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/35] | AT | 12.10.2022 | |
| CZ | 12.10.2022 | ||
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RO | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/34] | AT | 12.10.2022 | |
| DK | 12.10.2022 | ||
| EE | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/33] | AT | 12.10.2022 | |
| DK | 12.10.2022 | ||
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| SM | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/25] | AT | 12.10.2022 | |
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| HR | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| PL | 12.10.2022 | ||
| RS | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| IS | 12.02.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/23] | AT | 12.10.2022 | |
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| LV | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| GR | 13.01.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/22] | AT | 12.10.2022 | |
| ES | 12.10.2022 | ||
| FI | 12.10.2022 | ||
| LT | 12.10.2022 | ||
| NL | 12.10.2022 | ||
| SE | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| PT | 13.02.2023 | ||
| Former [2023/20] | LT | 12.10.2022 | |
| NL | 12.10.2022 | ||
| NO | 12.01.2023 | ||
| Former [2023/17] | NL | 12.10.2022 | Documents cited: | Search | [XAYI] JPS57140809 (KAWASAKI STEEL CO et al.) [X] 1,5 * abstract * * claim 1 *[A] 4 [Y] 2 [I] 3 | [XAYI] JPS5953612 (NIPPON STEEL CORP et al.) [X] 1,5 * abstract * * claim 1 *[A] 4 [Y] 2 [I] 3 | [XYI] JPH07118722 (NIPPON STEEL CORP et al.) [X] 1,3,5 * abstract * * paragraph [0011] * * claims 1,2 *[Y] 2 [I] 4 | [YA] JPS62109913 (KOBE STEEL LTD et al.) [Y] 2 * the whole document *[A] 1,3-5 | [XAYI] JPH02250914 (NIPPON STEEL CORP et al.) [X] 1,5 * the whole document *[A] 4 [Y] 2 [I] 3 | International search | [XY] JPH07118722 (NIPPON STEEL CORP et al.) [X] 1, 4, 5 * , claims, paragraphs [0010]-[0018] (Family: none) *[Y] 2, 3 | [XY] JPH02250914 (NIPPON STEEL CORP et al.) [X] 1, 4, 5 * , claims, page 2, upper left column, line 10 to lower right column, line 9 (Family: none) *[Y] 2, 3 | [Y] JPS62109913 (KOBE STEEL LTD et al.) [Y] 2-4 * , claims, page 5, lower right column, line 20 to page 6, upper right column, line 20 (Family: none) * | [Y] JP2004115857 (NIPPON STEEL CORP et al.) [Y] 2-4 * , paragraphs [0009]-[0030] (Family: none) * | [Y] JP2007277666 (OSAKA KOUKAI KK et al.) [Y] 3, 4 * , paragraphs [0005]-[0007] (Family: none) * | [A] JPH1171611 (OSAKA KOUKAI KK et al.) [A] 1-5 * , entire text (Family: none) * | Examination | RIVER SANDS: "TECHNICAL DATA SHEET EASY MIX HYDRATED LIME", 1 September 2016 (2016-09-01), XP055684947, Retrieved from the Internet | MISSISSIPPI LIME: "Pulverized Quicklime 100 Calcium Oxide TECHNICAL DATA SHEET PRODUCT DESCRIPTION", 31 January 2008 (2008-01-31), XP055684946, Retrieved from the Internet | CARDOSO F A ET AL: "Carbide lime and industrial hydrated lime characterization", POWDER TECHNOLOGY - ELECTROSTATIC PHENOMENA IN PARTICULATE PROCESSES, ELSEVIER, BASEL (CH), vol. 195, no. 2, 25 October 2009 (2009-10-25), pages 143 - 149, XP026338860, ISSN: 0032-5910, [retrieved on 20090607], DOI: 10.1016/J.POWTEC.2009.05.017 [Y] 2 [I] 4 DOI: http://dx.doi.org/10.1016/j.powtec.2009.05.017 | by applicant | JPH083611 | JP2001288507 | JPS5135836 |