blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3567945

EP3567945 - RADIO ACCESS NETWORK NODE, WIRELESS TERMINAL, METHODS THEREFOR, AND NON-TEMPORARY COMPUTER-READABLE MEDIUM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.07.2022
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  06.08.2021
FormerGrant of patent is intended
Status updated on  31.03.2021
FormerExamination is in progress
Status updated on  24.07.2020
FormerRequest for examination was made
Status updated on  11.10.2019
FormerThe international publication has been made
Status updated on  13.07.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
NEC Corporation
7-1, Shiba 5-chome Minato-ku
Tokyo 108-8001 / JP
[2019/46]
Inventor(s)01 / FUTAKI, Hisashi
c/o NEC Corporation
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
02 / HAYASHI, Sadafuku
c/o NEC Corporation
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
 [2019/46]
Representative(s)MacDougall, Alan John Shaw, et al
Mathys & Squire The Shard
32 London Bridge Street
London SE1 9SG / GB
[2021/36]
Former [2019/46]MacDougall, Alan John Shaw, et al
Mathys & Squire LLP The Shard
32 London Bridge Street
London SE1 9SG / GB
Application number, filing date17889814.421.11.2017
[2019/46]
WO2017JP41835
Priority number, dateJP2017000079805.01.2017         Original published format: JP 2017000798
[2019/46]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018128022
Date:12.07.2018
Language:JA
[2018/28]
Type: A1 Application with search report 
No.:EP3567945
Date:13.11.2019
Language:EN
[2019/46]
Type: B1 Patent specification 
No.:EP3567945
Date:08.09.2021
Language:EN
[2021/36]
Search report(s)International search report - published on:JP12.07.2018
(Supplementary) European search report - dispatched on:EP22.11.2019
ClassificationIPC:H04W72/04, H04L27/26, H04W16/32, H04W24/10, H04W36/14, H04W88/06, H04W92/20, H04L5/00
[2019/52]
CPC:
H04L5/001 (EP,CN); H04W72/04 (EP,CN); H04W72/23 (CN,US);
H04L27/26 (EP); H04L5/0091 (EP,CN); H04W16/32 (EP,CN);
H04W24/10 (EP,CN); H04W36/0069 (US); H04W36/00698 (EP,CN);
H04W36/14 (US); H04W36/1443 (EP,CN); H04W88/06 (EP,CN,US);
H04W92/20 (EP,US); H04L5/0053 (EP); H04W84/042 (US) (-)
Former IPC [2019/46]H04W72/04, H04L27/26, H04W16/32, H04W24/10, H04W36/14, H04W88/06, H04W92/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/46]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:FUNKZUGANGSNETZWERKKNOTEN, DRAHTLOSES ENDGERÄT, VERFAHREN DAFÜR UND NICHTTEMPORÄRES COMPUTERLESBARES MEDIUM[2019/46]
English:RADIO ACCESS NETWORK NODE, WIRELESS TERMINAL, METHODS THEREFOR, AND NON-TEMPORARY COMPUTER-READABLE MEDIUM[2019/46]
French:NOEUD DE RÉSEAU D'ACCÈS RADIO, TERMINAL SANS FIL, PROCÉDÉS ASSOCIÉS, ET SUPPORT LISIBLE PAR ORDINATEUR NON TEMPORAIRE[2019/46]
Entry into regional phase28.06.2019Translation filed 
28.06.2019National basic fee paid 
28.06.2019Search fee paid 
28.06.2019Designation fee(s) paid 
28.06.2019Examination fee paid 
Examination procedure28.06.2019Examination requested  [2019/46]
10.06.2020Amendment by applicant (claims and/or description)
24.07.2020Despatch of a communication from the examining division (Time limit: M04)
24.11.2020Reply to a communication from the examining division
01.04.2021Communication of intention to grant the patent
30.07.2021Fee for grant paid
30.07.2021Fee for publishing/printing paid
30.07.2021Receipt of the translation of the claim(s)
Divisional application(s)EP20179551.5  / EP3726908
EP22160601.5  / EP4090114
Opposition(s)09.06.2022No opposition filed within time limit [2022/33]
Fees paidRenewal fee
27.11.2019Renewal fee patent year 03
13.11.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.11.2017
AL08.09.2021
AT08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
MK08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
IE21.11.2021
LU21.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
[2024/23]
Former [2023/33]HU21.11.2017
AL08.09.2021
AT08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
IE21.11.2021
LU21.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2023/30]AL08.09.2021
AT08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
IE21.11.2021
LU21.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2023/10]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
IE21.11.2021
LU21.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/48]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
IE21.11.2021
LU21.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/37]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
LU21.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/36]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
LU21.11.2021
BE30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/34]AL08.09.2021
AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
LU21.11.2021
BE30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/33]AL08.09.2021
AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BE30.11.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/29]AL08.09.2021
AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/25]AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/24]AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/23]AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
PL08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
PT10.01.2022
Former [2022/21]AT08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
Former [2022/10]ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
Former [2022/09]ES08.09.2021
FI08.09.2021
LT08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
Former [2022/08]ES08.09.2021
FI08.09.2021
LT08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
Former [2022/07]LT08.09.2021
NO08.12.2021
Documents cited:Search[X]US2016352551  (ZHANG LIQING [CA], et al) [X] 1-15 * paragraph [0004] * * paragraph [0032] * * paragraph [0130] - paragraph [0131]; figure 10 *;
 [X]  - COOLPAD, "Discussion on the design for synchronization signal", vol. RAN WG1, no. Lisbon, Portugal; 20161010 - 20161014, (20161009), 3GPP DRAFT; R1-1609879_DISCUSSION ON THE DESIGN FOR SYNCHRONIZATION SIGNAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CED, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20161009), XP051149906 [X] 1-15 * Section 3 *
 [X]  - SAMSUNG, "Initial access procedure to support multiple numerologies in NR", vol. RAN WG2, no. Reno, USA; 20161114 - 20161118, (20161113), 3GPP DRAFT; R2-168087 INITIAL ACCESS PROCEDURE TO SUPPORT MULTIPLE NUMEROLOGIES IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-AN, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20161113), XP051177783 [X] 1-15 * the whole document *
International search[YA]  - ERICSSON, "RRC configuration in LTE-NR tight-interworking", 3GPP TSG-RAN WG2#96 R2-168291, (20161105), XP051177941 [Y] 1-3, 5-6, 9-13, 16-26 * Section 2 * [A] 4, 7-8, 14-15
 [YA]  - SAMSUNG, "Connection establishment in multiple numerology environment", 3GPP TSG-RAN WG2#95bis R2-166934, (20160930), XP051161868 [Y] 1-3, 5-6, 9-13, 16-26 * Section 2 * [A] 4, 7-8, 14-15
 [A]  - NOKIA, "Measurement coordination in LTE/NRtight interworking", 3GPP TSG-RAN WG2#96 R2-168118, (20161105), XP051192953 [A] 4, 7-8, 14-15 * Section 3 *
by applicantJP2017000798
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.