EP3576319 - METHOD FOR COMMUNICATION IN PASSIVE OPTICAL NETWORK SYSTEM, OPTICAL LINE TERMINAL AND OPTICAL NETWORK UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 18.02.2021 | ||
Former | Request for examination was made Status updated on 01.11.2019 | ||
Former | The international publication has been made Status updated on 11.09.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang Shenzhen, Guangdong 518129 / CN | [2019/49] | Inventor(s) | 01 /
YIN, Jinrong Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 02 /
ZHAO, Dianbo Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 03 /
YANG, Sulin Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2019/49] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/49] | Application number, filing date | 17898999.2 | 28.02.2017 | [2019/49] | WO2017CN75232 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018157291 | Date: | 07.09.2018 | Language: | ZH | [2018/36] | Type: | A1 Application with search report | No.: | EP3576319 | Date: | 04.12.2019 | Language: | EN | [2019/49] | Type: | B1 Patent specification | No.: | EP3576319 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | International search report - published on: | CN | 07.09.2018 | (Supplementary) European search report - dispatched on: | EP | 03.01.2020 | Classification | IPC: | H04B10/25, H04Q11/00 | [2019/49] | CPC: |
H04Q11/0067 (EP);
H04B10/0795 (US);
H04B10/25 (EP);
H04B10/40 (US);
H04J14/0242 (US);
H04Q11/00 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR KOMMUNIKATION IN EINEM PASSIVEN OPTISCHEN NETZWERKSYSTEM, OPTISCHES LEITUNGSENDGERÄT UND OPTISCHE NETZWERKEINHEIT | [2021/11] | English: | METHOD FOR COMMUNICATION IN PASSIVE OPTICAL NETWORK SYSTEM, OPTICAL LINE TERMINAL AND OPTICAL NETWORK UNIT | [2019/49] | French: | PROCÉDÉ DE COMMUNICATION DANS UN SYSTÈME DE RÉSEAU OPTIQUE PASSIF, TERMINAL DE LIGNE OPTIQUE ET UNITÉ DE RÉSEAU OPTIQUE | [2019/49] |
Former [2019/49] | VERFAHREN ZUR KOMMUNIKATION IN EINEM PASSIVEN OPTISCHEN NETZWERKSYSTEM, OPTICAL LINE TERMINAL UND OPTISCHE NETZWERKEINHEIT | Entry into regional phase | 27.08.2019 | Translation filed | 27.08.2019 | National basic fee paid | 27.08.2019 | Search fee paid | 27.08.2019 | Designation fee(s) paid | 27.08.2019 | Examination fee paid | Examination procedure | 27.08.2019 | Examination requested [2019/49] | 11.05.2020 | Amendment by applicant (claims and/or description) | 19.02.2021 | Communication of intention to grant the patent | 19.05.2021 | Fee for grant paid | 19.05.2021 | Fee for publishing/printing paid | 19.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 27.08.2019 | Renewal fee patent year 03 | 02.03.2020 | Renewal fee patent year 04 | 26.02.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2017 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | MT | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | BE | 28.02.2022 | CH | 28.02.2022 | GB | 28.02.2022 | IE | 28.02.2022 | LI | 28.02.2022 | LU | 28.02.2022 | [2024/44] |
Former [2024/29] | HU | 28.02.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
TR | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2024/24] | HU | 28.02.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2024/23] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2024/20] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/19] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/10] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/09] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
CH | 28.02.2022 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/08] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
GB | 28.02.2022 | ||
IE | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2022/47] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
LU | 28.02.2022 | ||
Former [2022/44] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/11] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | AT | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [Y]WO9705718 (ITALTEL SPA [IT], et al) [Y] 1-15 * page 1, line 12 - page 6, line 14 * * page 6, line 35 - page 8, line 32 * * figures 1-3 *; | [Y]US2009080891 (KAZAWA TOHRU [JP], et al) [Y] 1-15 * abstract * * page 1, paragraph 5 * * page 2, paragraph 8 - paragraph 11 * * page 2, paragraph 17 - page 3, paragraph 30 * * page 5, paragraph 72 - paragraph 79 * * page 6, paragraph 95 - page 7, paragraph 102 * * page 9, paragraph 120 - page 11, paragraph 137; figures 1-4,9-16 *; | [Y]EP2448152 (ZTE CORP [CN]) [Y] 1-15 * column 1, paragraphs 3,5 - column 3, paragraph 12 * * column 5, paragraph 21 - column 10, paragraph 55 * * figures 1-4 *; | [Y] - FRANK J EFFENBERGER MOTOROLA NETWORKS UNITED STATES OF AMERICA, "Updated Revised Amendment 1 to G.984.3, Gigabit-capable Passive Optical Networks (G-PON) : Transmission Convergence Layer Specification (for consent);TD 157 (PLEN/15)", ITU-T DRAFT ; STUDY PERIOD 2005-2008, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20050516), vol. 2/15, pages 1 - 39, XP017561191 [Y] 1-15 * 10. Activation Method; IV Appendix: OLT Activation Overview * | International search | [X]CN102075820 (ZTE CORP) [X] 1-30 * , description, paragraphs [0003], [0005] and [0056]-[0084], and figures 1-4 *; | [A]CN102075240 (ZTE CORP) [A] 1-30 * , entire document *; | [A]CN102687427 (HUAWEI TECH CO LTD) [A] 1-30 * , entire document *; | [A]WO2014071309 (HUAWEI TECH CO LTD [CN], et al) [A] 1-30* , entire document *; | [A]CN104426625 (CHINA MOBILE COMM CORP) [A] 1-30 * , entire document * |