EP3632161 - METHOD AND POWER CONTROL UNIT FOR SUPPLYING ELECTRIC POWER TO A RADIO UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.11.2022 Database last updated on 12.10.2024 | |
Former | The patent has been granted Status updated on 03.12.2021 | ||
Former | Grant of patent is intended Status updated on 23.09.2021 | ||
Former | Request for examination was made Status updated on 16.07.2021 | ||
Former | Grant of patent is intended Status updated on 30.06.2021 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The international publication has been made Status updated on 08.12.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2020/15] | Inventor(s) | 01 /
HUMLA, Lars Riksdalervägen 5B 175 67 Järfälla / SE | 02 /
ELEFTHERIADIS, Lackis Tavelvägen 23 818 32 Gävle / SE | [2020/15] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2020/15] | Application number, filing date | 17911428.5 | 02.06.2017 | [2020/15] | WO2017SE50590 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018222098 | Date: | 06.12.2018 | Language: | EN | [2018/49] | Type: | A1 Application with search report | No.: | EP3632161 | Date: | 08.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.12.2018 takes the place of the publication of the European patent application. | [2020/15] | Type: | B1 Patent specification | No.: | EP3632161 | Date: | 05.01.2022 | Language: | EN | [2022/01] | Search report(s) | International search report - published on: | SE | 06.12.2018 | (Supplementary) European search report - dispatched on: | EP | 28.10.2020 | Classification | IPC: | H04W52/02, H02J7/00, H02J1/10 | [2020/48] | CPC: |
H02J7/34 (EP,US);
H04W52/0203 (US);
G05F1/66 (US);
H02J1/10 (EP);
H04W52/0216 (US);
H04W52/386 (US);
|
Former IPC [2020/15] | H04W52/02, H02J7/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND LEISTUNGSREGELEINHEIT ZUR STROMVERSORGUNG EINER FUNKEINHEIT | [2020/15] | English: | METHOD AND POWER CONTROL UNIT FOR SUPPLYING ELECTRIC POWER TO A RADIO UNIT | [2020/15] | French: | PROCÉDÉ ET UNITÉ DE COMMANDE DE PUISSANCE POUR FOURNIR DE L'ÉNERGIE ÉLECTRIQUE À UNE UNITÉ RADIO | [2020/15] | Entry into regional phase | 18.11.2019 | National basic fee paid | 18.11.2019 | Search fee paid | 18.11.2019 | Designation fee(s) paid | 18.11.2019 | Examination fee paid | Examination procedure | 18.11.2019 | Examination requested [2020/15] | 06.05.2021 | Amendment by applicant (claims and/or description) | 01.07.2021 | Communication of intention to grant the patent | 16.07.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.09.2021 | Communication of intention to grant the patent | 25.11.2021 | Fee for grant paid | 25.11.2021 | Fee for publishing/printing paid | 25.11.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21210357.6 / EP3979722 | Opposition(s) | 06.10.2022 | No opposition filed within time limit [2022/50] | Fees paid | Renewal fee | 17.12.2019 | Renewal fee patent year 03 | 29.06.2020 | Renewal fee patent year 04 | 28.06.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.06.2017 | AL | 05.01.2022 | AT | 05.01.2022 | CY | 05.01.2022 | CZ | 05.01.2022 | DK | 05.01.2022 | EE | 05.01.2022 | ES | 05.01.2022 | HR | 05.01.2022 | LT | 05.01.2022 | LV | 05.01.2022 | MC | 05.01.2022 | MK | 05.01.2022 | MT | 05.01.2022 | PL | 05.01.2022 | RO | 05.01.2022 | RS | 05.01.2022 | SE | 05.01.2022 | SI | 05.01.2022 | SK | 05.01.2022 | SM | 05.01.2022 | BG | 05.04.2022 | NO | 05.04.2022 | GR | 06.04.2022 | IS | 05.05.2022 | PT | 05.05.2022 | LU | 02.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | FR | 30.06.2022 | LI | 30.06.2022 | [2024/44] |
Former [2024/24] | HU | 02.06.2017 | |
AL | 05.01.2022 | ||
AT | 05.01.2022 | ||
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
MK | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/23] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
MK | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/20] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CY | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/25] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/22] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
LU | 02.06.2022 | ||
CH | 30.06.2022 | ||
FR | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/21] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
LU | 02.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/10] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/08] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/01] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/49] | AT | 05.01.2022 | |
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/48] | AT | 05.01.2022 | |
CZ | 05.01.2022 | ||
DK | 05.01.2022 | ||
EE | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/47] | AT | 05.01.2022 | |
DK | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RO | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/46] | AT | 05.01.2022 | |
DK | 05.01.2022 | ||
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/42] | AT | 05.01.2022 | |
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/36] | AT | 05.01.2022 | |
ES | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
PL | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
GR | 06.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/35] | ES | 05.01.2022 | |
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
RS | 05.01.2022 | ||
SE | 05.01.2022 | ||
BG | 05.04.2022 | ||
NO | 05.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/34] | ES | 05.01.2022 | |
LT | 05.01.2022 | ||
NO | 05.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/33] | LT | 05.01.2022 | |
NO | 05.04.2022 | Documents cited: | Search | [YA]US2011227414 (FISCHER STEVE [US]) [Y] 10 * paragraphs [0020], [0025], [0087];; figure 2 * [A] 1-9; | [Y]US2016088571 (CHOI YONGHAE [KR], et al) [Y] 10* paragraphs [0002], [0022], [0051-0057];; figure 4 * | International search | [YA]US2011077059 (KIM BYUNG-KI [KR], et al) [Y] 1-2, 4-13, 15-24 * ; paragraphs [0003], [0010]-[0014], [0056], [0097]-[0098] * [A] 3, 14; | [YA]US2011227414 (FISCHER STEVE [US]) [Y] 1-2, 4-13, 15-24 * ; abstract; paragraphs [0020], [0025], [0031]-[0032], [0040], [0051], [0057], [0087] * [A] 3, 14; | [A]US2012289224 (HALLBERG HELENE [SE], et al) [A] 1, 24 * ; paragraphs [0007], [0134]-[0135], [0141]-[0142]; figure 4 *; | [YA]US2016088571 (CHOI YONGHAE [KR], et al) [Y] 1-2, 4-13, 15-24 * ; abstract; paragraphs [0002], [0022], [0051]-[0057], [0060]; figure 4 * [A] 3, 14; | [E]WO2017095279 (ERICSSON TELEFON AB L M (PUBL) [SE]) [E] 1-2, 4-13, 15-24* ; abstract; page 11, line 12 - page 11, line 30; page 2, line 25 - page 5, line 11; page 9, line 15 - page 10, line 23; figure 6; claim 1 * | by applicant | US2011227414 |