EP3637893 - METHOD AND DEVICE FOR PERFORMING DEVICE-TO-DEVICE COMMUNICATION BY SHARING UPLINK RESOURCE AND SIDELINK RESOURCE IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 11.03.2021 | ||
Former | Request for examination was made Status updated on 13.03.2020 | ||
Former | The international publication has been made Status updated on 12.01.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2020/16] | Inventor(s) | 01 /
BYUN, Ilmu IP Center LG Electronics Inc. 19, Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | 02 /
KANG, Jiwon IP Center LG Electronics Inc. 19, Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | 03 /
LEE, Sangrim IP Center LG Electronics Inc. 19, Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | [2020/16] | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2020/16] | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | Application number, filing date | 17916795.2 | 07.07.2017 | [2020/16] | WO2017KR07324 | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019009454 | Date: | 10.01.2019 | Language: | KO | [2019/02] | Type: | A1 Application with search report | No.: | EP3637893 | Date: | 15.04.2020 | Language: | EN | [2020/16] | Type: | B1 Patent specification | No.: | EP3637893 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | International search report - published on: | KR | 10.01.2019 | (Supplementary) European search report - dispatched on: | EP | 28.04.2020 | Classification | IPC: | H04W72/04, H04W72/12, H04W76/10, H04W4/40, H04W76/14, H04W4/44, H04W4/46, H04W4/08, // H04W92/18, H04W88/04 | [2021/13] | CPC: |
H04W4/46 (EP);
H04W72/23 (KR,US);
H04L5/0048 (US);
H04W4/08 (EP);
H04W4/44 (EP);
H04W72/04 (EP);
H04W72/046 (KR,US);
H04W72/12 (EP);
H04W72/20 (KR);
|
Former IPC [2020/22] | H04W72/04, H04W72/12, H04W76/10, H04W4/40, // H04W92/18, H04W88/04 | ||
Former IPC [2020/16] | H04W72/04, H04W72/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR DURCHFÜHRUNG EINER VORRICHTUNG-ZU-VORRICHTUNG-KOMMUNIKATION DURCH GEMEINSAME NUTZUNG EINER UPLINK-RESSOURCE UND SIDELINK-RESSOURCE IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM | [2020/16] | English: | METHOD AND DEVICE FOR PERFORMING DEVICE-TO-DEVICE COMMUNICATION BY SHARING UPLINK RESOURCE AND SIDELINK RESOURCE IN WIRELESS COMMUNICATION SYSTEM | [2020/16] | French: | PROCÉDÉ ET DISPOSITIF PERMETTANT D'EXÉCUTER UNE COMMUNICATION DE DISPOSITIF À DISPOSITIF VIA LE PARTAGE D'UNE RESSOURCE DE LIAISON MONTANTE ET D'UNE RESSOURCE DE LIAISON LATÉRALE DANS UN SYSTÈME DE COMMUNICATIONS SANS FIL | [2020/16] | Entry into regional phase | 08.01.2020 | Translation filed | 08.01.2020 | National basic fee paid | 08.01.2020 | Search fee paid | 08.01.2020 | Designation fee(s) paid | 08.01.2020 | Examination fee paid | Examination procedure | 08.01.2020 | Examination requested [2020/16] | 25.11.2020 | Amendment by applicant (claims and/or description) | 12.03.2021 | Communication of intention to grant the patent | 21.07.2021 | Fee for grant paid | 21.07.2021 | Fee for publishing/printing paid | 21.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Fees paid | Renewal fee | 08.01.2020 | Renewal fee patent year 03 | 23.07.2020 | Renewal fee patent year 04 | 26.07.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.07.2017 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | NL | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | [2024/23] |
Former [2024/20] | HU | 07.07.2017 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2024/18] | HU | 07.07.2017 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/11] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Documents cited: | Search | [E]EP3609260 (LG ELECTRONICS INC [KR]) [E] 1-3,7-9,11-13 * abstract * * paragraphs [0001] - [0022] - [0100] , [0101] , [0134] - [0171] *; | [A] - NOKIA ET AL, "On Simultaneous Uu and PC5 operation in different carriers", vol. RAN WG1, no. Athens, Greece; 20170213 - 20170217, (20170212), 3GPP DRAFT; R1-1703204-UU-PC5-DIFFERENT-CARRIERS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170212), XP051210338 [A] 1-15 * the whole document * | [A] - ERICSSON, "Additional Considerations for V2V Scenarios", vol. RAN WG4, no. Nanjing, China; 20160523 - 20160527, (20160522), 3GPP DRAFT; R4-163505, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN4/Docs/, (20160522), XP051106498 [A] 1-15 * the whole document * | [A] - HUAWEI ET AL, "Discussion on UE capability reporting for V2X", vol. RAN WG2, no. Spokane, USA; 20170403 - 20170407, (20170403), 3GPP DRAFT; R2-1702501 DISCUSSION ON UE CAPABILITY REPORTING FOR V2X, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; F, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170403), XP051244524 [A] 1-15 * the whole document * | [A] - Kyun Chee ET AL, "Space Division Duplex (SDD) System using Smart Antenna Technical Subject Area", (20050307), URL: https://ieeexplore.ieee.org/ielx5/9880/31412/01461122.pdf?tp=&arnumber=1461122&isnumber=31412&ref=aHR0cHM6Ly9pZWVleHBsb3JlLmllZWUub3JnL2RvY3VtZW50LzE0NjExMjI=, (20200408), XP055684481 [A] 1-15 * the whole document * | International search | [A]KR20120024340 (PANTECH CO LTD [KR]) [A] 1-20 * See paragraphs [0091]-[0115]; and figure 3. *; | [A]US2013090141 (HOTTINEN ARI [FI]) [A] 1-20 * See paragraphs [0018]-[0019]; and figure 3. *; | [A]US2015171944 (KALHAN AMIT [US]) [A] 1-20 * See paragraphs [0018]-[0051]; and figures 1A-3D. *; | [A]WO2016022844 (KYOCERA CORP [JP], et al) [A] 1-20 * See paragraphs [0033]-[0055]; and figures 4, 5. *; | [A] - LENOVO et al., "Sidelink Resource Allocation and Configuration", R1-1707772, 3GPP TSG RAN WG1 Meeting #89, (20170506), XP051262070 [A] 1-20 * See section 2. * | [A] - INTEL CORPORATION, "Sidelink Resource Allocation and Configuration for Wearable and IoT Use Cases", R1-1707333, 3GPP TSG RAN WG1 Meeting #89, (20170507), XP051262993 [A] 1-20 * See sections 2-4. * |