EP3444179 - ACCESS DEVICE FOR A FLUID TANK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.08.2022 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 10.09.2021 | ||
Former | Grant of patent is intended Status updated on 25.08.2021 | ||
Former | Request for examination was made Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 27.05.2021 | ||
Former | Request for examination was made Status updated on 23.08.2019 | ||
Former | The application has been published Status updated on 18.01.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states B+Btec International Bv Munterij 8 4762 AH Zevenbergen / NL | [2019/08] | Inventor(s) | 01 /
Jansen, Francis Munterij 8 4762 AH Zevenbergen / NL | [2019/08] | Representative(s) | Lichti - Patentanwälte Partnerschaft mbB Postfach 41 07 60 76207 Karlsruhe / DE | [2019/08] | Application number, filing date | 18000660.3 | 08.08.2018 | [2019/08] | Priority number, date | DE20171007700 | 16.08.2017 Original published format: DE102017007700 | [2019/08] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3444179 | Date: | 20.02.2019 | Language: | DE | [2019/08] | Type: | B1 Patent specification | No.: | EP3444179 | Date: | 13.10.2021 | Language: | DE | [2021/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.12.2018 | Classification | IPC: | B23B51/04, B23G5/06, F16K5/06, F16L41/04, B63C7/00, B63B25/08, B09B3/00, B25B27/00, E21B43/01 | [2021/24] | CPC: |
B63B25/082 (EP,US);
B09B3/00 (EP,US);
B23B51/04 (EP,US);
B23G5/20 (US);
B63C7/006 (EP,US);
F16L41/04 (EP,US);
B09B2101/007 (EP,US);
B09B2101/02 (EP,US);
B23B51/08 (US);
B23G5/06 (EP,US)
(-)
|
Former IPC [2019/08] | B63C7/00, B63B25/08, B09B3/00, B25B27/00, E21B43/01 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/39] |
Former [2019/08] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ZUGANGSVORRICHTUNG FÜR EINEN FLUIDTANK | [2019/08] | English: | ACCESS DEVICE FOR A FLUID TANK | [2019/08] | French: | DISPOSITIF D'ACCÈS POUR UN RÉSERVOIR DE LIQUIDE | [2019/08] | Examination procedure | 19.08.2019 | Examination requested [2019/39] | 19.08.2019 | Date on which the examining division has become responsible | 28.08.2019 | Amendment by applicant (claims and/or description) | 11.09.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 28.05.2021 | Communication of intention to grant the patent | 29.07.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 29.07.2021 | Fee for grant paid | 29.07.2021 | Fee for publishing/printing paid | 02.09.2021 | Communication of intention to grant the patent | 08.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 14.07.2022 | No opposition filed within time limit [2022/38] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 13.09.2019 | Request for further processing filed | 13.09.2019 | Full payment received (date of receipt of payment) Request granted | 26.09.2019 | Decision despatched | Fees paid | Renewal fee | 20.08.2020 | Renewal fee patent year 03 | 23.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.08.2018 | AL | 13.10.2021 | CY | 13.10.2021 | CZ | 13.10.2021 | DK | 13.10.2021 | EE | 13.10.2021 | ES | 13.10.2021 | FI | 13.10.2021 | HR | 13.10.2021 | IT | 13.10.2021 | LT | 13.10.2021 | LV | 13.10.2021 | MC | 13.10.2021 | MK | 13.10.2021 | MT | 13.10.2021 | PL | 13.10.2021 | RO | 13.10.2021 | RS | 13.10.2021 | SE | 13.10.2021 | SI | 13.10.2021 | SK | 13.10.2021 | SM | 13.10.2021 | BG | 13.01.2022 | NO | 13.01.2022 | GR | 14.01.2022 | IS | 13.02.2022 | PT | 14.02.2022 | [2024/42] |
Former [2024/27] | HU | 08.08.2018 | |
AL | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/20] | HU | 08.08.2018 | |
AL | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/18] | HU | 08.08.2018 | |
AL | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/27] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/16] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/01] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/49] | AL | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/35] | CZ | 13.10.2021 | |
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/34] | EE | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/33] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/25] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/24] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/23] | ES | 13.10.2021 | |
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/22] | FI | 13.10.2021 | |
LT | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/21] | RS | 13.10.2021 | |
BG | 13.01.2022 | ||
Former [2022/19] | BG | 13.01.2022 | Documents cited: | Search | [A]US3831387 (ROLLEMAN J) [A] 1-14 * column 3, line 31 - column 9, line 67; figures 1-25 *; | [XI]US5546979 (CLARK JAMES E II [US], et al) [X] 1,9,13,14 * column 3, line 44 - column 5, line 7; figures 1-4 * [I] 2-8,10-12; | [XI]US5704383 (KAMMERAAD DAVID A [US], et al) [X] 1,13,14 * column 2, line 42 - column 4, line 63; figures 1-7 * [I] 2-12; | [A]US5775390 (MOHN FRANK [GB]) [A] 1-14* column 3, line 58 - column 6, line 15; figures 1-5 * |