blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3366892

EP3366892 - TURBINE SHROUD WITH BIASED RETAINING RING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  28.06.2019
FormerGrant of patent is intended
Status updated on  15.05.2019
FormerRequest for examination was made
Status updated on  01.03.2019
FormerThe application has been published
Status updated on  27.07.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Rolls-Royce Corporation
450 South Meridian Street
Indianapolis, Indiana 46225 / US
[2018/35]
Inventor(s)01 / Baucco, Alexandra
1401 N Pennsylvania Street, Apt 307
Indianapolis, Indiana 46202 / US
 [2019/31]
Former [2018/35]01 / Baucco, Alexandra
1401 N Pennsylvania Street, Apt 307
Indianapolis, IN Indiana 46202 / US
Representative(s)Rolls-Royce plc
Moor Lane (ML-9)
PO Box 31
Derby DE24 8BJ / GB
[N/P]
Former [2018/35]Rolls-Royce plc
Intellectual Property Dept SinA-48
PO Box 31
Derby DE24 8BJ / GB
Application number, filing date18153185.624.01.2018
[2018/35]
Priority number, dateUS20171543950222.02.2017         Original published format: US201715439502
[2018/35]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3366892
Date:29.08.2018
Language:EN
[2018/35]
Type: B1 Patent specification 
No.:EP3366892
Date:31.07.2019
Language:EN
[2019/31]
Search report(s)(Supplementary) European search report - dispatched on:EP02.05.2018
ClassificationIPC:F01D25/24
[2018/35]
CPC:
F01D25/246 (EP,US); F01D11/005 (US); F05D2240/11 (EP,US);
F05D2260/30 (US); F05D2300/6033 (EP,US); Y02T50/60 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/14]
Former [2018/35]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:TURBINENGEHÄUSE MIT VORGESPANNTEM HALTERING[2018/35]
English:TURBINE SHROUD WITH BIASED RETAINING RING[2018/35]
French:CHEMISE DE TURBINE AVEC BAGUE DE RETENUE BIAISÉE[2018/35]
Examination procedure22.02.2019Amendment by applicant (claims and/or description)
22.02.2019Examination requested  [2019/14]
22.02.2019Date on which the examining division has become responsible
16.05.2019Communication of intention to grant the patent
20.06.2019Fee for grant paid
20.06.2019Fee for publishing/printing paid
20.06.2019Receipt of the translation of the claim(s)
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.01.2018
AL31.07.2019
AT31.07.2019
CY31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
MC31.07.2019
MK31.07.2019
MT31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
IE24.01.2020
LU24.01.2020
BE31.01.2020
[2022/33]
Former [2022/28]HU24.01.2018
AL31.07.2019
AT31.07.2019
CY31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
MC31.07.2019
MT31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
IE24.01.2020
LU24.01.2020
BE31.01.2020
Former [2021/08]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
MC31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
IE24.01.2020
LU24.01.2020
BE31.01.2020
Former [2020/51]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
MC31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
LU24.01.2020
BE31.01.2020
Former [2020/46]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
MC31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
LU24.01.2020
Former [2020/39]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
MC31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
Former [2020/37]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SI31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
Former [2020/36]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
IS30.10.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
Former [2020/27]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SK31.07.2019
SM31.07.2019
TR31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
IS24.02.2020
Former [2020/25]AL31.07.2019
AT31.07.2019
CZ31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
SK31.07.2019
TR31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
IS24.02.2020
Former [2020/24]AL31.07.2019
AT31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
TR31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
IS24.02.2020
Former [2020/23]AL31.07.2019
AT31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
IT31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
PL31.07.2019
RO31.07.2019
RS31.07.2019
SE31.07.2019
TR31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
PT02.12.2019
Former [2020/22]AL31.07.2019
AT31.07.2019
DK31.07.2019
EE31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
RS31.07.2019
SE31.07.2019
TR31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
PT02.12.2019
Former [2020/17]AL31.07.2019
AT31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
RS31.07.2019
SE31.07.2019
TR31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
PT02.12.2019
Former [2020/15]AL31.07.2019
AT31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
RS31.07.2019
SE31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
PT02.12.2019
Former [2020/12]AT31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
RS31.07.2019
SE31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
PT02.12.2019
Former [2020/11]AT31.07.2019
ES31.07.2019
FI31.07.2019
HR31.07.2019
LT31.07.2019
LV31.07.2019
NL31.07.2019
RS31.07.2019
SE31.07.2019
BG31.10.2019
NO31.10.2019
GR01.11.2019
PT02.12.2019
Former [2020/10]AT31.07.2019
FI31.07.2019
LT31.07.2019
NL31.07.2019
SE31.07.2019
BG31.10.2019
NO31.10.2019
PT02.12.2019
Former [2020/09]FI31.07.2019
LT31.07.2019
NL31.07.2019
NO31.10.2019
Former [2020/08]LT31.07.2019
NO31.10.2019
Documents cited:Search[A]EP1965030  (ROLLS ROYCE PLC [GB]) [A] 1-15 * paragraphs [0017] - [0037] * * figures 4-6 *;
 [A]WO2014186099  (GEN ELECTRIC [US]) [A] 1-15 * paragraphs [0007] - [0009] * * paragraphs [0022] - [0043] * * figures 3-5,7,8 *;
 [A]EP3037628  (ROLLS ROYCE CORP [US], et al) [A] 1-15* figure 4 *;
 [A]US2016290145  (ROUSSILLE CLÉMENT [FR], et al) [A] 1-15 * paragraphs [0022] - [0038] * * figures 1-4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.