blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3360796

EP3360796 - HARD-LANDING DETECTION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  23.10.2020
FormerGrant of patent is intended
Status updated on  11.06.2020
FormerExamination is in progress
Status updated on  11.09.2019
FormerRequest for examination was made
Status updated on  22.02.2019
FormerThe application has been published
Status updated on  13.07.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Goodrich Corporation
4 Coliseum Centre
2730 West Tyvola Road
Charlotte, NC 28217-4578 / US
[2018/33]
Inventor(s)01 / CEPIC, Adnan
1513 Heathfield Mews
Mississauga, Ontario L5M 3K8 / CA
02 / FAZELI, Amir M.
3230 Ridgeleigh Hts
MIssissauga, Ontario L5M 6S6 / CA
03 / REBER, Susanne
22327 Pinnacle Point
Strongsville, OH 44149 / US
 [2020/48]
Former [2018/33]01 / CEPIC, Adnan
1513 Heathfield Mews
Mississauga, Ontario L5M 3K8 / CA
02 / FAZELI, Amir M.
3230 Ridgeleigh Hts
MIssissauga, Ontario L5M 6S6 / CA
03 / REBER, Susanne
22327 Pinnacle Point
Strongsville, OH Ohio 44149 / US
Representative(s)Dehns
10 Old Bailey
London EC4M 7NG / GB
[N/P]
Former [2020/48]Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Former [2018/33]Dehns
St. Brides House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date18155503.807.02.2018
[2018/33]
Priority number, dateUS20171542792308.02.2017         Original published format: US201715427923
[2018/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3360796
Date:15.08.2018
Language:EN
[2018/33]
Type: B1 Patent specification 
No.:EP3360796
Date:25.11.2020
Language:EN
[2020/48]
Search report(s)(Supplementary) European search report - dispatched on:EP21.03.2018
ClassificationIPC:B64D45/00, B64C25/60, B64C25/00
[2018/33]
CPC:
B64C25/60 (EP,BR,US); B64C25/28 (BR,US); B64C25/001 (EP,US);
B64D45/00 (EP,BR,US); B64C2025/006 (BR); B64D2045/008 (EP,BR,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/13]
Former [2018/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HARTLANDUNGSERKENNUNGSYSTEM[2018/33]
English:HARD-LANDING DETECTION SYSTEM[2018/33]
French:SYSTEME DE DETERMINATION D'ATTERRISSAGE DUR[2018/33]
Examination procedure15.02.2019Amendment by applicant (claims and/or description)
15.02.2019Examination requested  [2019/13]
15.02.2019Date on which the examining division has become responsible
16.09.2019Despatch of a communication from the examining division (Time limit: M03)
23.12.2019Reply to a communication from the examining division
12.06.2020Communication of intention to grant the patent
15.10.2020Fee for grant paid
15.10.2020Fee for publishing/printing paid
15.10.2020Receipt of the translation of the claim(s)
Opposition(s)26.08.2021No opposition filed within time limit [2021/44]
Fees paidRenewal fee
20.02.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.02.2018
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
MT25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
[2024/42]
Former [2024/23]HU07.02.2018
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2023/33]HU07.02.2018
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2023/30]AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/34]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/23]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/10]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
CH28.02.2021
LI28.02.2021
PT25.03.2021
Former [2022/08]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/07]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
IE07.02.2021
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/50]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/46]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
LU07.02.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
CH28.02.2021
LI28.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/45]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/41]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/37]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/36]AT25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/35]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/33]AT25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/32]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/28]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/25]AT25.11.2020
FI25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/23]AT25.11.2020
FI25.11.2020
LV25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/22]FI25.11.2020
RS25.11.2020
NO25.02.2021
PT25.03.2021
Former [2021/21]FI25.11.2020
PT25.03.2021
Former [2021/20]FI25.11.2020
Documents cited:Search[XA]US2006220917  (NANCE C K [US]) [X] 1-3,11-13 * page 3, paragraph [0041] - page 6, paragraph [0060]; figures 2,7 * [A] 4-10,14,15;
 [XAI]US2007008187  (SCHMIDT R K [CA]) [X] 1-3,11-13 * page 2, paragraph [0017] - page 3, paragraph [0036] * [A] 4-8,14,15 [I] 9,10;
 [A]US2011046825  (LASTERE NICOLAS [FR], et al) [A] 1-15* page 3, paragraph [0063] - page 6, paragraph [0149]; figures 2-5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.