| EP3364522 - METHOD AND APPARATUS FOR POSITION ALIGNMENT USING LOW-FREQUENCY ANTENNAS IN WIRELESS POWER TRANSFER SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.03.2021 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 17.04.2020 | ||
| Former | Grant of patent is intended Status updated on 09.02.2020 | ||
| Former | Examination is in progress Status updated on 21.05.2019 | ||
| Former | Request for examination was made Status updated on 01.03.2019 | ||
| Former | The application has been published Status updated on 20.07.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Hyundai Motor Company 12, Heolleung-ro Seocho-gu Seoul 06797 / KR | For all designated states Kia Motors Corporation 12, Heolleung-ro Seocho-gu Seoul 06797 / KR | [2018/34] | Inventor(s) | 01 /
SEONG, Jae Yong 150, Hyundaiyeonguso-ro, Namyang-eup 18280 Hwaseong-si, Gyeonggi-do / KR | [2018/34] | Representative(s) | Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte Am Brauhaus 8 01099 Dresden / DE | [2018/34] | Application number, filing date | 18156017.8 | 09.02.2018 | [2018/34] | Priority number, date | US201762460150P | 17.02.2017 Original published format: US 201762460150 P | US201762559145P | 15.09.2017 Original published format: US 201762559145 P | KR20180011609 | 30.01.2018 Original published format: KR 20180011609 | [2018/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3364522 | Date: | 22.08.2018 | Language: | EN | [2018/34] | Type: | B1 Patent specification | No.: | EP3364522 | Date: | 20.05.2020 | Language: | EN | [2020/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.04.2018 | Classification | IPC: | B60L53/38, H02J50/12, H02J50/90 | [2020/09] | CPC: |
H02J50/90 (EP,CN,US);
B60L53/126 (EP,US);
B60L53/38 (EP,CN,US);
G01B7/14 (US);
H02J50/12 (EP,US);
Y02T10/70 (EP,US);
Y02T10/7072 (EP,US);
Y02T90/12 (EP,US);
Y02T90/14 (EP,US);
Y02T90/16 (EP,US)
(-)
|
| Former IPC [2018/34] | H02J50/90, H02J50/12, B60L11/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/14] |
| Former [2018/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUR POSITIONSAUSRICHTUNG MIT NIEDERFREQUENZANTENNEN IN EINEM SYSTEM ZUR DRAHTLOSEN STROMÜBERTRAGUNG | [2018/34] | English: | METHOD AND APPARATUS FOR POSITION ALIGNMENT USING LOW-FREQUENCY ANTENNAS IN WIRELESS POWER TRANSFER SYSTEM | [2018/34] | French: | PROCÉDÉ ET APPAREIL D'ALIGNEMENT DE POSITION UTILISANT DES ANTENNES À BASSE FRÉQUENCE DANS UN SYSTÈME DE TRANSFERT DE PUISSANCE SANS FIL | [2018/34] | Examination procedure | 20.02.2019 | Amendment by applicant (claims and/or description) | 20.02.2019 | Examination requested [2019/14] | 20.02.2019 | Date on which the examining division has become responsible | 24.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.09.2019 | Reply to a communication from the examining division | 10.02.2020 | Communication of intention to grant the patent | 18.03.2020 | Fee for grant paid | 18.03.2020 | Fee for publishing/printing paid | 14.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 23.02.2021 | No opposition filed within time limit [2021/17] | Fees paid | Renewal fee | 27.02.2020 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.02.2018 | AL | 20.05.2020 | AT | 20.05.2020 | CY | 20.05.2020 | CZ | 20.05.2020 | DK | 20.05.2020 | EE | 20.05.2020 | ES | 20.05.2020 | FI | 20.05.2020 | HR | 20.05.2020 | IT | 20.05.2020 | LT | 20.05.2020 | LV | 20.05.2020 | MC | 20.05.2020 | MK | 20.05.2020 | MT | 20.05.2020 | NL | 20.05.2020 | PL | 20.05.2020 | RO | 20.05.2020 | RS | 20.05.2020 | SE | 20.05.2020 | SI | 20.05.2020 | SK | 20.05.2020 | SM | 20.05.2020 | TR | 20.05.2020 | BG | 20.08.2020 | NO | 20.08.2020 | GR | 21.08.2020 | IS | 20.09.2020 | PT | 21.09.2020 | IE | 09.02.2021 | LU | 09.02.2021 | [2026/04] |
| Former [2024/42] | HU | 09.02.2018 | |
| AL | 20.05.2020 | ||
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| MK | 20.05.2020 | ||
| MT | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 09.02.2021 | ||
| LU | 09.02.2021 | ||
| Former [2024/23] | HU | 09.02.2018 | |
| AL | 20.05.2020 | ||
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| MK | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 09.02.2021 | ||
| LU | 09.02.2021 | ||
| Former [2023/33] | HU | 09.02.2018 | |
| AL | 20.05.2020 | ||
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 09.02.2021 | ||
| LU | 09.02.2021 | ||
| Former [2023/30] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 09.02.2021 | ||
| LU | 09.02.2021 | ||
| Former [2022/07] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 09.02.2021 | ||
| LU | 09.02.2021 | ||
| Former [2021/47] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| LU | 09.02.2021 | ||
| Former [2021/41] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/24] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/10] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/09] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| IT | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/08] | AL | 20.05.2020 | |
| DK | 20.05.2020 | ||
| ES | 20.05.2020 | ||
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/04] | AL | 20.05.2020 | |
| FI | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| NL | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/01] | FI | 20.05.2020 | |
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/51] | FI | 20.05.2020 | |
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/50] | FI | 20.05.2020 | |
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/48] | FI | 20.05.2020 | |
| LT | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| NO | 20.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/47] | LT | 20.05.2020 | |
| NO | 20.08.2020 | ||
| IS | 20.09.2020 | ||
| Former [2020/46] | IS | 20.09.2020 | Documents cited: | Search | [I] EP2717430 (NISSAN MOTOR et al.) [I] 1-15 * paragraphs [0010] - [0046]; figure 1 * | [I] WO2012096169 (PANASONIC CORP et al.) [I] 1-15 * paragraphs [0014] - [0060] * | [A] US2016288657 (TOKURA SUSUMU et al.) [A] 1-15 * paragraphs [0031] - [0062]; figure 1 * |