EP3525299 - CRIMPING TOOL, BASE, RAM ASSEMBLY, PLANT AND METHOD OF CHANGING BETWEEN TOOLS OF A CRIMPING TOOL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.09.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 30.09.2022 | ||
Former | Grant of patent is intended Status updated on 06.07.2022 | ||
Former | Examination is in progress Status updated on 21.06.2022 | ||
Former | Grant of patent is intended Status updated on 02.03.2022 | ||
Former | Examination is in progress Status updated on 27.11.2020 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The application has been published Status updated on 12.07.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Aptiv Technologies Limited The Financial Services Centre Bishop's Court Hill St. Michael / BB | [2023/13] |
Former [2019/33] | For all designated states Aptiv Technologies Limited Erin Court Bishop's Court Hill St. Michael / BB | Inventor(s) | 01 /
DIAS, Rui, M Avenida de Portugal No.50 3º Esq. 2790-477 Carnaxide / PT | 02 /
NASCIMENTO, Bruno, M Avenida João Paulo II, lote 12 8500-780 Portimão / PT | [2019/33] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Postfach 31 02 20 80102 München / DE | [2019/33] | Application number, filing date | 18156061.6 | 09.02.2018 | [2019/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3525299 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Type: | B1 Patent specification | No.: | EP3525299 | Date: | 02.11.2022 | Language: | EN | [2022/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.06.2018 | Classification | IPC: | H01R43/048 | [2019/33] | CPC: |
H01R43/048 (EP);
H01R43/0488 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] |
Former [2019/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | CRIMPWERKZEUG, BASIS, RAMMANORDNUNG, ANLAGE UND VERFAHREN ZUM WECHSELN ZWISCHEN WERKZEUGEN EINES CRIMPWERKZEUGS | [2019/33] | English: | CRIMPING TOOL, BASE, RAM ASSEMBLY, PLANT AND METHOD OF CHANGING BETWEEN TOOLS OF A CRIMPING TOOL | [2019/33] | French: | OUTIL DE SERTISSAGE, BASE, ENSEMBLE PISTON-PLONGEUR, INSTALLATION ET PROCÉDÉ DE CHANGEMENT ENTRE LES OUTILS D'UN OUTIL DE SERTISSAGE | [2019/33] | Examination procedure | 14.02.2020 | Amendment by applicant (claims and/or description) | 14.02.2020 | Examination requested [2020/13] | 14.02.2020 | Date on which the examining division has become responsible | 04.12.2020 | Despatch of a communication from the examining division (Time limit: M05) | 14.05.2021 | Reply to a communication from the examining division | 03.03.2022 | Communication of intention to grant the patent | 20.06.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.07.2022 | Communication of intention to grant the patent | 23.09.2022 | Fee for grant paid | 23.09.2022 | Fee for publishing/printing paid | 23.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.08.2023 | No opposition filed within time limit [2023/41] | Fees paid | Renewal fee | 28.02.2020 | Renewal fee patent year 03 | 25.02.2021 | Renewal fee patent year 04 | 24.02.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 02.11.2022 | AT | 02.11.2022 | CZ | 02.11.2022 | DK | 02.11.2022 | EE | 02.11.2022 | ES | 02.11.2022 | FI | 02.11.2022 | HR | 02.11.2022 | IT | 02.11.2022 | LT | 02.11.2022 | LV | 02.11.2022 | MC | 02.11.2022 | NL | 02.11.2022 | PL | 02.11.2022 | RO | 02.11.2022 | RS | 02.11.2022 | SE | 02.11.2022 | SI | 02.11.2022 | SK | 02.11.2022 | SM | 02.11.2022 | NO | 02.02.2023 | GR | 03.02.2023 | IE | 09.02.2023 | LU | 09.02.2023 | BE | 28.02.2023 | CH | 28.02.2023 | LI | 28.02.2023 | IS | 02.03.2023 | PT | 02.03.2023 | [2024/26] |
Former [2024/12] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IE | 09.02.2023 | ||
LU | 09.02.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2024/08] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IE | 09.02.2023 | ||
LU | 09.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/51] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
LU | 09.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/49] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
LU | 09.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/48] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/44] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/38] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/37] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/35] | AT | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/34] | AT | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/33] | AT | 02.11.2022 | |
DK | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/29] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
NL | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/25] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/23] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/22] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
LT | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/20] | LT | 02.11.2022 | |
NO | 02.02.2023 | Documents cited: | Search | [A]FR2643514 (RICARD CLAUDE [FR]) [A] 1-15 * figures 1-6 *; | [A]JP2002158074 (UNION MACHINERY CO LTD) [A] 1-15 * figures 1-3 *; | [A]WO2015053284 (YAZAKI CORP [JP]) [A] 1-15* figures 16-19 * |