EP3364099 - MODULAR LAMP WITH DIRECT AND INDIRECT SHARE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 26.04.2025 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 18.06.2020 | ||
Former | Examination is in progress Status updated on 17.09.2019 | ||
Former | Request for examination was made Status updated on 01.03.2019 | ||
Former | The application has been published Status updated on 20.07.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states TRILUX GmbH & Co. KG Heidestraße 4 59759 Arnsberg / DE | [2018/34] | Inventor(s) | 01 /
Raffenberg, Dipl.-Ing. Peter Trift 11 59757 Arnsberg / DE | [2018/34] | Representative(s) | Lippert Stachow Patentanwälte Rechtsanwälte Partnerschaft mbB Postfach 30 02 08 51412 Bergisch Gladbach / DE | [2018/34] | Application number, filing date | 18157948.3 | 21.02.2018 | [2018/34] | Priority number, date | DE201710103557 | 21.02.2017 Original published format: DE102017103557 | [2018/34] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3364099 | Date: | 22.08.2018 | Language: | DE | [2018/34] | Type: | B1 Patent specification | No.: | EP3364099 | Date: | 25.11.2020 | Language: | DE | [2020/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.05.2018 | Classification | IPC: | F21S8/06, F21V21/005, F21V15/01, F21V23/06, // F21V3/00, F21V17/10, F21S2/00, F21V15/015 | [2018/34] | CPC: |
F21S8/06 (EP);
F21S2/005 (EP);
F21V15/01 (EP);
F21V15/015 (EP);
F21V17/104 (EP);
F21V21/005 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/14] |
Former [2018/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | MODULARE LEUCHTE MIT DIREKT- UND INDIREKTANTEIL | [2018/34] | English: | MODULAR LAMP WITH DIRECT AND INDIRECT SHARE | [2018/34] | French: | LUMINAIRE MODULAIRE COMPRENANT UNE PROPORTION DIRECTE ET INDIRECTE | [2018/34] | Examination procedure | 22.02.2019 | Amendment by applicant (claims and/or description) | 22.02.2019 | Examination requested [2019/14] | 22.02.2019 | Date on which the examining division has become responsible | 20.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 30.01.2020 | Reply to a communication from the examining division | 19.06.2020 | Communication of intention to grant the patent | 16.10.2020 | Fee for grant paid | 16.10.2020 | Fee for publishing/printing paid | 16.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 19.02.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.02.2018 | AL | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | IT | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | MT | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | TR | 25.11.2020 | IE | 21.02.2021 | LU | 21.02.2021 | BG | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | BE | 28.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | [2024/42] |
Former [2024/29] | HU | 21.02.2018 | |
AL | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MK | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
TR | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
BE | 28.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2024/23] | HU | 21.02.2018 | |
AL | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MK | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
BE | 28.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2023/33] | HU | 21.02.2018 | |
AL | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
BE | 28.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2023/30] | AL | 25.11.2020 | |
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
BE | 28.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/34] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
BE | 28.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2022/08] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/07] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
IE | 21.02.2021 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/48] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
LU | 21.02.2021 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/41] | CZ | 25.11.2020 | |
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | CZ | 25.11.2020 | |
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | CZ | 25.11.2020 | |
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | CZ | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | FI | 25.11.2020 | |
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | FI | 25.11.2020 | |
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | FI | 25.11.2020 | |
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | FI | 25.11.2020 | |
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | FI | 25.11.2020 | |
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
NO | 25.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Documents cited: | Search | [X]US2009002978 (TRAN MICHAEL TRUNG [US], et al) [X] 16* figures 1-9; claims 1-16 *; | [XI]US2010002426 (WU ARTHUR Y [US], et al) [X] 1-3,5,8,10,13-17 * paragraph [0048] - paragraph [0070] * * paragraph [0087] - paragraph [0095] * * figures 12-22,26 * [I] 9 |