EP3379717 - VARIABLE-SPEED PUMPED STORAGE POWER SYSTEM AND VARIABLE-SPEED PUMPED STORAGE POWER METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 03.03.2021 | ||
Former | Examination is in progress Status updated on 04.09.2019 | ||
Former | Request for examination was made Status updated on 24.08.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Kabushiki Kaisha Toshiba 1-1, Shibaura 1-chome Minato-ku, Tokyo 105-8001 / JP | For all designated states Toshiba Energy Systems & Solutions Corporation 72-34, Horikawa-cho Saiwai-ku Kawasaki-shi Kanagawa 2120013 / JP | [2021/30] |
Former [2018/39] | For all designated states KABUSHIKI KAISHA TOSHIBA 1-1, Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | ||
For all designated states Toshiba Energy Systems & Solutions Corporation 72-34, Horikawa-cho Saiwai-ku Kawasaki-shi Kanagawa 2120013 / JP | Inventor(s) | 01 /
Ishizuki, Teruyuki c/o IP Div. Toshiba Corp. (K.K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 02 /
Kageyama, Takashisa c/o IP Div. Toshiba Corp. (K.K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 03 /
Hasegawa, Ryuta c/o IP Div. Toshiba Corp. (K.K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 04 /
Mori, Junji c/o IP Div. Toshiba Corp. (K.K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | [2018/39] | Representative(s) | AWA Sweden AB Junkersgatan 1 582 35 Linköping / SE | [2018/39] | Application number, filing date | 18159620.6 | 02.03.2018 | [2018/39] | Priority number, date | JP20170060074 | 24.03.2017 Original published format: JP 2017060074 | JP20180016518 | 01.02.2018 Original published format: JP 2018016518 | [2018/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3379717 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Type: | A3 Search report | No.: | EP3379717 | Date: | 19.12.2018 | Language: | EN | [2018/51] | Type: | B1 Patent specification | No.: | EP3379717 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.11.2018 | Classification | IPC: | H02P9/10, H02P9/00, H02H7/12, H02H9/04, // H02H7/09 | [2021/08] | CPC: |
H02P9/107 (EP);
H02H3/20 (CN);
H02H7/09 (CN);
H02H7/12 (EP);
H02H9/041 (EP);
H02H9/042 (EP);
|
Former IPC [2018/39] | H02P9/10, H02P9/00, // H02H7/09 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/39] | Title | German: | DREHZAHLVARIABLES PUMPSPEICHERKRAFTWERK UND DREHZAHLVARIABLES PUMPSPEICHERKRAFTVERFAHREN | [2018/39] | English: | VARIABLE-SPEED PUMPED STORAGE POWER SYSTEM AND VARIABLE-SPEED PUMPED STORAGE POWER METHOD | [2018/39] | French: | SYSTÈME ET PROCÉDÉ D'ALIMENTATION DE STOCKAGE PAR POMPAGE À VITESSE VARIABLE | [2018/39] | Examination procedure | 02.03.2018 | Examination requested [2018/39] | 02.03.2018 | Date on which the examining division has become responsible | 18.06.2019 | Amendment by applicant (claims and/or description) | 09.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 14.01.2020 | Reply to a communication from the examining division | 20.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.07.2020 | Reply to a communication from the examining division | 10.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 20.11.2020 | Reply to a communication from the examining division | 04.03.2021 | Communication of intention to grant the patent | 17.06.2021 | Fee for grant paid | 17.06.2021 | Fee for publishing/printing paid | 17.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 12.03.2020 | Renewal fee patent year 03 | 12.03.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.03.2018 | AL | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | IT | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | MT | 28.07.2021 | NL | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | GB | 02.03.2022 | IE | 02.03.2022 | LU | 02.03.2022 | BE | 31.03.2022 | [2024/42] |
Former [2024/23] | HU | 02.03.2018 | |
AL | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 02.03.2022 | ||
IE | 02.03.2022 | ||
LU | 02.03.2022 | ||
BE | 31.03.2022 | ||
Former [2024/20] | HU | 02.03.2018 | |
AL | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 02.03.2022 | ||
IE | 02.03.2022 | ||
LU | 02.03.2022 | ||
BE | 31.03.2022 | ||
Former [2024/18] | HU | 02.03.2018 | |
AL | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 02.03.2022 | ||
IE | 02.03.2022 | ||
LU | 02.03.2022 | ||
BE | 31.03.2022 | ||
Former [2023/10] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 02.03.2022 | ||
IE | 02.03.2022 | ||
LU | 02.03.2022 | ||
BE | 31.03.2022 | ||
Former [2023/08] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 02.03.2022 | ||
IE | 02.03.2022 | ||
LU | 02.03.2022 | ||
Former [2022/47] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/36] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/25] | CZ | 28.07.2021 | |
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | CZ | 28.07.2021 | |
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/21] | DK | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/11] | ES | 28.07.2021 | |
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | ES | 28.07.2021 | |
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | ES | 28.07.2021 | |
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
Former [2022/07] | LT | 28.07.2021 | |
NL | 28.07.2021 | ||
NO | 28.10.2021 | Documents cited: | Search | [X]US4041543 (PASCULLE MAURICE J, et al) [X] 6 * column 6; figure 6 *; | [A]SU1584058 (TS PK T B KRUPNYKH ELEKTRICHES [SU]) [A] 6 * the whole document *; | [X]JPH08317694 (TOKYO ELECTRIC POWER CO, et al) [X] 1-3,7 * the whole document *; | [A]JPH11215896 (MITSUBISHI ELECTRIC CORP) [A] 1-3,7 * the whole document *; | [A]JP3100805B (TOKYO ELECTRIC POWER CO; ELECTRIC POWER DEV CO; TOSHIBA CORP) [A] 1-3,7 * the whole document *; | [A]JP2007236059 (CHUGOKU ELECTRIC POWER) [A] 6 * the whole document *; | [X]CN102522777 (DONGFANG TURBINE CO LTD DONGFANG ELECTRIC CORP, et al) [X] 5 * paragraphs [0033] - [0039] *; | [A]EP2518891 (TOSHIBA KK [JP]) [A] 1-3,7 * the whole document *; | [X]WO2013071937 (VESTAS WIND SYS AS [DK]) [X] 6 * pages 3-4,15-1; figures 3b,4, *; | [A]EP2830176 (ALSTOM TECHNOLOGY LTD [CH]) [A] 6* the whole document *; | [X]CN102999675B (SHANGHAI MUNICIPAL ELEC POWER, et al) [X] 4 * paragraphs [0061] , [0078] - [0083] - [0135]; figures 7,10,11 *; | [X]EP2905858 (TOSHIBA KK [JP]) [X] 1-3,7 * the whole document *; | [X]CN106150900 (HUAYI WIND ENERGY CO LTD) [X] 5 * abstract *; | [AP] - XIAN-YONG XIAO ET AL, "Integrated DFIG Protection With a Modified SMES-FCL Under Symmetrical and Asymmetrical Faults", IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY., US, (20180601), vol. 28, no. 4, doi:10.1109/TASC.2018.2802782, ISSN 1051-8223, pages 1 - 6, XP055516612 [AP] 4 * the whole document * DOI: http://dx.doi.org/10.1109/TASC.2018.2802782 |