EP3385504 - VANE COOLING SYSTEM [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 29.03.2024 Database last updated on 13.11.2024 | |
Former | Grant of patent is intended Status updated on 17.09.2023 | ||
Former | Examination is in progress Status updated on 10.09.2019 | ||
Former | Request for examination was made Status updated on 19.04.2019 | ||
Former | The application has been published Status updated on 07.09.2018 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): LV, PL, RS | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states Rolls-Royce plc Kings Place 90 York Way London N1 9FX / GB | [2024/18] |
Former [2020/09] | For all designated states Rolls-Royce plc Kings Place 90 York Way London N1 9FX / GB | ||
Former [2018/41] | For all designated states Rolls-Royce plc 62 Buckingham Gate London SW1E 6AT / GB | Inventor(s) | 01 /
Pitt, Simon c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | [2018/41] | Representative(s) | Rolls-Royce plc Moor Lane (ML-9) PO Box 31 Derby DE24 8BJ / GB | [N/P] |
Former [2018/41] | Rolls-Royce plc Intellectual Property Dept SinA-48 PO Box 31 Derby DE24 8BJ / GB | Application number, filing date | 18160507.2 | 07.03.2018 | [2018/41] | Priority number, date | GB20170005553 | 06.04.2017 Original published format: GB 201705553 | [2018/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3385504 | Date: | 10.10.2018 | Language: | EN | [2018/41] | Type: | B1 Patent specification | No.: | EP3385504 | Date: | 01.05.2024 | Language: | EN | [2024/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.06.2018 | Classification | IPC: | F01D5/18, F01D11/10, F01D11/24, F02C7/18, F01D9/06, F01D25/12 | [2023/33] | CPC: |
F01D5/186 (EP,US);
F01D11/10 (EP,US);
F01D11/24 (EP,US);
F01D25/12 (EP,US);
F01D9/041 (US);
F01D9/065 (EP,US);
F02C7/18 (EP,US);
F05D2240/11 (EP,US);
F05D2240/81 (EP,US);
F05D2260/201 (EP,US);
F05D2260/202 (EP,US);
F05D2260/205 (EP,US);
|
Former IPC [2018/41] | F01D9/02, F01D9/06, F01D25/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/21] |
Former [2018/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHAUFELKÜHLSYSTEM | [2018/41] | English: | VANE COOLING SYSTEM | [2018/41] | French: | SYSTÈME DE REFROIDISSEMENT D'UNE AUBE | [2018/41] | Examination procedure | 10.04.2019 | Amendment by applicant (claims and/or description) | 10.04.2019 | Examination requested [2019/21] | 10.04.2019 | Date on which the examining division has become responsible | 12.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.11.2019 | Reply to a communication from the examining division | 03.11.2021 | Despatch of a communication from the examining division (Time limit: M04) | 01.03.2022 | Reply to a communication from the examining division | 28.09.2023 | Communication of intention to grant the patent | 10.10.2023 | Fee for grant paid | 10.10.2023 | Fee for publishing/printing paid | 10.10.2023 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 27.03.2020 | Renewal fee patent year 03 | 29.03.2021 | Renewal fee patent year 04 | 25.03.2022 | Renewal fee patent year 05 | 23.03.2023 | Renewal fee patent year 06 | 26.03.2024 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.05.2024 | BG | 01.05.2024 | ES | 01.05.2024 | FI | 01.05.2024 | HR | 01.05.2024 | LV | 01.05.2024 | NL | 01.05.2024 | PL | 01.05.2024 | NO | 01.08.2024 | RS | 01.08.2024 | GR | 02.08.2024 | IS | 01.09.2024 | PT | 02.09.2024 | [2024/49] |
Former [2024/48] | AT | 01.05.2024 | |
BG | 01.05.2024 | ||
ES | 01.05.2024 | ||
FI | 01.05.2024 | ||
HR | 01.05.2024 | ||
NL | 01.05.2024 | ||
NO | 01.08.2024 | ||
GR | 02.08.2024 | ||
IS | 01.09.2024 | ||
PT | 02.09.2024 | ||
Former [2024/47] | BG | 01.05.2024 | |
FI | 01.05.2024 | ||
HR | 01.05.2024 | ||
NL | 01.05.2024 | ||
NO | 01.08.2024 | ||
GR | 02.08.2024 | ||
IS | 01.09.2024 | ||
PT | 02.09.2024 | ||
Former [2024/46] | BG | 01.05.2024 | |
FI | 01.05.2024 | ||
HR | 01.05.2024 | ||
NO | 01.08.2024 | ||
IS | 01.09.2024 | Documents cited: | Search | [Y]EP1221538 (GEN ELECTRIC [US]) [Y] 1-16 * paragraph [0001] - paragraph [0004] * * paragraph [0018] - paragraph [0022] * * paragraph [0037] - paragraph [0038]; figures 1,2; claims 1-4 *; | [YD]US6779967 (FRIEDL WINFRIED-HAGEN [DE], et al) [YD] 1-16 * column 1, lines 8-63; figures 1-3; claims 1-7, 10-12 *; | [Y]EP1921292 (GEN ELECTRIC [US]) [Y] 1-16 * paragraph [0001] - paragraph [0003] * * paragraph [0103] - paragraph [0114]; figures 1,3-5; claim 1 *; | [Y]US2009293495 (CORREIA VICTOR HUGO SILVA [US], et al) [Y] 1-16 * paragraph [0018] - paragraph [0028]; figures 2-7; claims 1-9, 24 *; | [Y]EP2336524 (KAWASAKI HEAVY IND LTD [JP]) [Y] 1-16* paragraphs [0001] , [0040] * | Examination | WO2014105515 | EP2990607 | by applicant | US6779967 |