EP3379899 - VEHICLE WINDOW GLASS WITH ELECTRICAL CONNECTOR SOLDERED BY LEAD-FREE SOLDER [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 25.09.2020 Database last updated on 19.07.2024 | |
Former | Grant of patent is intended Status updated on 18.05.2020 | ||
Former | Examination is in progress Status updated on 24.02.2020 | ||
Former | Request for examination was made Status updated on 24.08.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Central Glass Co., Ltd. 5253 Oaza Okiube Ube-shi Yamaguchi 755-0001 / JP | [2018/39] | Inventor(s) | 01 /
FARREYROL, Olivier Carlex Glass Luxembourg S.A. 1, op der Ahlkerrech Z.I. Potaaschberg 6776 Grevenmacher / LU | [2020/44] |
Former [2018/39] | 01 /
FARREYROL, Olivier Carlex Glass Luxembourg S.A. Carlex Glass Luxembourg S.A. 1, op der Ahlkerrech Z.I. Potaaschberg Grevenmacher L-6776 / LU | Representative(s) | Mewburn Ellis LLP Aurora Building Counterslip Bristol BS1 6BX / GB | [2020/44] |
Former [2018/39] | Stoner, Gerard Patrick Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | Application number, filing date | 18163070.8 | 21.03.2018 | [2018/39] | Priority number, date | GB20170004525 | 22.03.2017 Original published format: GB 201704525 | [2018/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3379899 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Type: | B1 Patent specification | No.: | EP3379899 | Date: | 28.10.2020 | Language: | EN | [2020/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.08.2018 | Classification | IPC: | H05B3/84, H01R4/02 | [2018/39] | CPC: |
H01R4/02 (EP,US);
B60J1/00 (CN);
H05B3/86 (US);
B32B15/02 (CN);
B32B15/04 (CN);
B32B17/06 (CN);
C03C27/046 (US);
C22C38/08 (EP,US);
C22C38/105 (EP,US);
H05B3/06 (US);
H05B3/84 (EP,US);
H01R2201/26 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/39] | Title | German: | FAHRZEUGFENSTERGLAS MIT DURCH BLEIFREIES LÖTEN VERLÖTETEM ELEKTRISCHEM VERBINDER | [2022/44] | English: | VEHICLE WINDOW GLASS WITH ELECTRICAL CONNECTOR SOLDERED BY LEAD-FREE SOLDER | [2018/39] | French: | VITRE DE VÉHICULE COMPORTANT UN CONNECTEUR ÉLECTRIQUE SOUDÉ PAR BRASURE SANS PLOMB | [2018/39] |
Former [2018/39] | FAHRZEUGFENSTERGLAS MIT DURCH BLEIFREIES LÖTEN VERLÖTETEM ELEKTRISCHEM VERBINDER | Examination procedure | 21.03.2018 | Date on which the examining division has become responsible | 06.04.2018 | Examination requested [2018/39] | 30.01.2019 | Amendment by applicant (claims and/or description) | 26.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.04.2020 | Reply to a communication from the examining division | 19.05.2020 | Communication of intention to grant the patent | 17.09.2020 | Fee for grant paid | 17.09.2020 | Fee for publishing/printing paid | 17.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
27.07.2021
29.07.2021
ADMISSIBLE AGC Glass Europe Avenue Jean Monnet 4 1348 Louvain-la-Neuve / BE Opponent's representative AGC Glass Europe Technovation Centre Intellectual Property Department Rue Louis Blériot 12 6041 Gosselies / BE | 02
28.07.2021
Saint-Gobain Glass France Tour Saint-Gobain 12 Place de l'Iris 92400 Courbevoie / FR Opponent's representative Gebauer, Dieter Edmund Splanemann Patentanwälte mbB Rumfordstraße 7 80469 München / DE | [2021/35] | 11.08.2021 | Invitation to proprietor to file observations on the notice of opposition | 20.12.2021 | Reply of patent proprietor to notice(s) of opposition | 20.09.2022 | Date of oral proceedings | 26.10.2022 | Despatch of interlocutory decision in opposition | 26.10.2022 | Despatch of minutes of oral proceedings | Appeal following opposition | 21.11.2022 | Appeal received No. T2483/22 | 21.11.2022 | Payment of appeal fee | 28.02.2023 | Statement of grounds filed | Fees paid | Renewal fee | 10.03.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.03.2018 | AL | 28.10.2020 | AT | 28.10.2020 | CY | 28.10.2020 | CZ | 28.10.2020 | DK | 28.10.2020 | EE | 28.10.2020 | FI | 28.10.2020 | HR | 28.10.2020 | IT | 28.10.2020 | LT | 28.10.2020 | LV | 28.10.2020 | MC | 28.10.2020 | MK | 28.10.2020 | NL | 28.10.2020 | PL | 28.10.2020 | RO | 28.10.2020 | RS | 28.10.2020 | SE | 28.10.2020 | SI | 28.10.2020 | SK | 28.10.2020 | SM | 28.10.2020 | BG | 28.01.2021 | NO | 28.01.2021 | GR | 29.01.2021 | IS | 28.02.2021 | PT | 01.03.2021 | IE | 21.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | LU | 21.03.2023 | BE | 31.03.2023 | [2024/23] |
Former [2024/12] | HU | 21.03.2018 | |
AL | 28.10.2020 | ||
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
LU | 21.03.2023 | ||
BE | 31.03.2023 | ||
Former [2024/02] | HU | 21.03.2018 | |
AL | 28.10.2020 | ||
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
LU | 21.03.2023 | ||
Former [2023/33] | HU | 21.03.2018 | |
AL | 28.10.2020 | ||
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/30] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/23] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/10] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
IS | 24.12.2021 | ||
Former [2022/07] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 21.03.2021 | ||
Former [2021/50] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/48] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/45] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/37] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/36] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
EE | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/35] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/33] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/32] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/30] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/28] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/25] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
LV | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/23] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
LV | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/22] | FI | 28.10.2020 | |
RS | 28.10.2020 | ||
NO | 28.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/21] | FI | 28.10.2020 | |
PT | 01.03.2021 | ||
Former [2021/20] | FI | 28.10.2020 | Documents cited: | Search | [X]EP2683033 (CENTRAL GLASS CO LTD [JP]) [X] 1,3-8,11,14 * abstract * * paragraphs [0001] , [0002] , [0005] , [0011] , [0024] - [0026] - [0041] , [0045] * * claims 1,7-9 * * figures 1,9 *; | [X]US2015264800 (SCHMALBUCH KLAUS [DE], et al) [X] 1,3-5,8,9,11,12,14,15 * abstract * * figures 1,2,3,8 * * paragraphs [0002] , [0018] , [0027] , [0031] - [0038] - [0040] , [0044] , [0045] , [0049] , [0052] , [0063] , [0064] , [0066] * * claims 1,4,6-14 *; | [X]WO2016096248 (SAINT GOBAIN [FR]) [X] 1-12,14 * abstract * * page 1, lines 6-10 * * page 3, lines 15-20 * * page 7, lines 1-10 * * page 7, line 34 - page 8, line 9 * * page 9, lines 25-30 * * page 11, lines 10-18 * * page 13, lines 10-20 * * page 14, lines 31-36 * * page 15, lines 15-25 ** claims 1,11,12,14 *; | [XI]CA2984056 (SAINT GOBAIN [FR]) [X] 1-12,14 * abstract * * page 1, lines 7-17 * * page 5, lines 16-31 * * page 7, lines 6-12 * * page 7, line 35 - page 8, line 8 * * page 9, lines 29-33 * * page 10, lines 7-24 * * page 11, lines 1-7 * * page 12, line 28 - page 13, line 2 * * page 15, lines 1-28 * * claims 1,2,5,6,10,14 * * figures 1,2,5 * [I] 13; | [X]DE202016008092U (FEW FAHRZEUGELEKTRIKWERK GMBH & CO KG [DE]) [X] 1,4-10,14 * abstract * * paragraphs [0009] , [0019] , [0025] , [0029] * * claims 1,7-12 * * figures 1-3 * | by applicant | WO2007110610 | US8816214 | US2016296569 | Opposition | CA2884777 | DE202016008092U | CA2984056 | GB1163224 | WO2007110610 | DE102006017675 | WO2011107341 | WO2011107342 | WO2012152543 | WO2014040774 | WO2014040773 | WO2014079595 | WO2016096248 | - ANONYMOUS, "Stainless- Steel EN Standards for Stainless Steel CR Sheet", WILSONS LTD., (20190718), pages 1 - 3, XP055833522 |