blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3381588

EP3381588 - CASTING SYSTEM FOR CASTING OF COPPER MELTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.10.2020
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  08.11.2019
FormerGrant of patent is intended
Status updated on  18.08.2019
FormerRequest for examination was made
Status updated on  15.07.2019
FormerGrant of patent is intended
Status updated on  27.06.2019
FormerRequest for examination was made
Status updated on  12.04.2019
FormerThe application has been published
Status updated on  31.08.2018
Most recent event   Tooltip29.07.2022Lapse of the patent in a contracting state
New state(s): FR
published on 31.08.2022  [2022/35]
Applicant(s)For all designated states
KME Mansfeld GmbH
Lichtlöcherberg 40
06333 Hettstedt / DE
[2019/43]
Former [2018/40]For all designated states
MKM Mansfelder Kupfer und Messing GmbH
Lichtlöcherberg 40
06333 Hettstedt / DE
Inventor(s)01 / Busch, Hendrik
Lindenstraße 5A
06456 Arnstein- OT Wiederstedt / DE
02 / Weber, Elisabeth
Siedlung Süd 8
06116 Halle (Saale) / DE
03 / Schwedler Olaf
An den Röthen 6c
39130 Magdeburg / DE
 [2018/40]
Representative(s)Griepenstroh, Jörg, et al
Bockermann Ksoll
Griepenstroh Osterhoff
Patentanwälte
Bergstrasse 159
44791 Bochum / DE
[2019/50]
Former [2018/40]Weidner Stern Jeschke
Patentanwälte Partnerschaft mbB
Universitätsallee 17
28359 Bremen / DE
Application number, filing date18163827.126.03.2018
[2018/40]
Priority number, dateDE20171010645627.03.2017         Original published format: DE102017106456
[2018/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3381588
Date:03.10.2018
Language:DE
[2018/40]
Type: B1 Patent specification 
No.:EP3381588
Date:11.12.2019
Language:DE
[2019/50]
Search report(s)(Supplementary) European search report - dispatched on:EP10.07.2018
ClassificationIPC:C04B35/573, B22D41/54, B22D41/60, C04B35/565, F27D3/14
[2019/25]
CPC:
B22D41/54 (EP); B22D41/60 (EP); C04B35/573 (EP);
F27D3/145 (EP); C04B2235/428 (EP); C04B2235/6026 (EP);
C04B2235/72 (EP); C04B2235/725 (EP); C04B2235/80 (EP);
C04B2235/94 (EP) (-)
Former IPC [2018/40]B22D41/54, B22D41/60, C04B35/565, F27D3/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/20]
Former [2018/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:GIESSSYSTEM ZUM GIESSEN VON KUPFERSCHMELZEN[2018/40]
English:CASTING SYSTEM FOR CASTING OF COPPER MELTS[2018/40]
French:SYSTÈME DE COULÉE POUR DU CUIVRE FONDU[2018/40]
Examination procedure12.01.2019Amendment by applicant (claims and/or description)
03.04.2019Examination requested  [2019/20]
03.04.2019Date on which the examining division has become responsible
28.06.2019Communication of intention to grant the patent
05.07.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
19.08.2019Communication of intention to grant the patent
22.10.2019Fee for grant paid
22.10.2019Fee for publishing/printing paid
22.10.2019Receipt of the translation of the claim(s)
Opposition(s)14.09.2020No opposition filed within time limit [2020/47]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.03.2018
AL11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MK11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IE26.03.2020
LU26.03.2020
BE31.03.2020
FR31.03.2020
IS11.04.2020
PT06.05.2020
[2022/35]
Former [2022/33]HU26.03.2018
AL11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MK11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IE26.03.2020
LU26.03.2020
BE31.03.2020
IS11.04.2020
PT06.05.2020
Former [2022/27]HU26.03.2018
AL11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IE26.03.2020
LU26.03.2020
BE31.03.2020
IS11.04.2020
PT06.05.2020
Former [2021/10]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IE26.03.2020
LU26.03.2020
BE31.03.2020
IS11.04.2020
PT06.05.2020
Former [2021/08]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IE26.03.2020
LU26.03.2020
IS11.04.2020
PT06.05.2020
Former [2021/04]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
LU26.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/50]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/47]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/40]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/37]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/36]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/35]AL11.12.2019
CZ11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/34]AL11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/32]AL11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/25]FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/23]FI11.12.2019
LT11.12.2019
LV11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/22]FI11.12.2019
LT11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
Former [2020/21]NO11.03.2020
Documents cited:Search[AD]EP1946866  (MKM MANSFELDER KUPFER UND MESS [DE]) [AD] 1-11 * paragraphs [0001] , [0016] , [0021] , [0022]; figure 1 *;
 [A]EP2861340  (PROD IND DE HAUTE TEMPERATURE PYROTEK INC [CA]) [A] 1-11* paragraphs [0001] , [0014] , [0015]; figures 3,6 *
by applicantWO0158816
 EP1506827
 EP1946866
 DE102014216433
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.