EP3553947 - SYSTEM AND METHOD FOR POWER AMPLIFIER LINEARIZATION WITH ECHO CANCELATION CAPABILITIES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.11.2023 Database last updated on 24.01.2025 | |
Former | The patent has been granted Status updated on 02.12.2022 | ||
Former | Grant of patent is intended Status updated on 25.07.2022 | ||
Former | Examination is in progress Status updated on 23.04.2021 | ||
Former | Request for examination was made Status updated on 19.03.2021 | ||
Former | Grant of patent is intended Status updated on 17.11.2020 | ||
Former | Request for examination was made Status updated on 24.04.2020 | ||
Former | The application has been published Status updated on 13.09.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states MaxLinear Asia Singapore Private Limited 151 Lorong Chuan, 02-01A, New Tech Park Lobby A Singapore / SG | [2021/17] |
Former [2019/42] | For all designated states INTEL Corporation 2200 Mission College Blvd. Santa Clara, CA 95054 / US | Inventor(s) | 01 /
KOL, Boaz 71 Galgal Hamazalot st. 4536011 Hod-Hasharon / IL | 02 /
ZUKUNFT, Roland Mozartstrasse 91b 85521 Ottobrunn / DE | [2019/42] | Representative(s) | 2SPL Patentanwälte PartG mbB Landaubogen 3 81373 München / DE | [2023/01] |
Former [2019/42] | 2SPL Patentanwälte PartG mbB Postfach 15 17 23 80050 München / DE | Application number, filing date | 18167347.6 | 13.04.2018 | [2019/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3553947 | Date: | 16.10.2019 | Language: | EN | [2019/42] | Type: | B1 Patent specification | No.: | EP3553947 | Date: | 04.01.2023 | Language: | EN | [2023/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.07.2018 | Classification | IPC: | H03F1/32, H03F3/24, H03F3/189, H03F3/21 | [2020/50] | CPC: |
H03F1/3247 (EP);
H03F1/3241 (EP);
H03F1/3252 (EP);
H03F3/189 (EP);
H03F3/211 (EP);
H03F3/24 (EP);
|
Former IPC [2019/42] | H03F1/32, H03F3/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] |
Former [2019/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM UND VERFAHREN ZUR STROMVERSTÄRKERLINEARISIERUNG MIT ECHOUNTERDRÜCKUNGSFÄHIGKEITEN | [2019/42] | English: | SYSTEM AND METHOD FOR POWER AMPLIFIER LINEARIZATION WITH ECHO CANCELATION CAPABILITIES | [2019/42] | French: | SYSTÈME ET PROCÉDÉ DE LINÉARISATION D'AMPLIFICATEUR DE PUISSANCE AVEC DES CAPACITÉS D'ANNULATION D'ÉCHO | [2019/42] | Examination procedure | 07.04.2020 | Amendment by applicant (claims and/or description) | 16.04.2020 | Examination requested [2020/22] | 16.04.2020 | Date on which the examining division has become responsible | 18.11.2020 | Communication of intention to grant the patent | 18.03.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 30.08.2021 | Reply to a communication from the examining division | 26.07.2022 | Communication of intention to grant the patent | 24.11.2022 | Fee for grant paid | 24.11.2022 | Fee for publishing/printing paid | 24.11.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23150187.5 / EP4195503 | Opposition(s) | 05.10.2023 | No opposition filed within time limit [2023/50] | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 21.04.2021 | Renewal fee patent year 04 | 27.04.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 04.01.2023 | BG | 04.01.2023 | CZ | 04.01.2023 | DK | 04.01.2023 | EE | 04.01.2023 | ES | 04.01.2023 | FI | 04.01.2023 | HR | 04.01.2023 | IT | 04.01.2023 | LT | 04.01.2023 | LV | 04.01.2023 | MC | 04.01.2023 | NL | 04.01.2023 | PL | 04.01.2023 | RO | 04.01.2023 | RS | 04.01.2023 | SE | 04.01.2023 | SI | 04.01.2023 | SK | 04.01.2023 | SM | 04.01.2023 | NO | 04.04.2023 | GR | 05.04.2023 | GB | 13.04.2023 | IE | 13.04.2023 | LU | 13.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | FR | 30.04.2023 | LI | 30.04.2023 | IS | 04.05.2023 | PT | 04.05.2023 | [2024/51] |
Former [2024/26] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
IT | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
GB | 13.04.2023 | ||
IE | 13.04.2023 | ||
LU | 13.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
FR | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/21] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
GB | 13.04.2023 | ||
IE | 13.04.2023 | ||
LU | 13.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
FR | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/11] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SI | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
GB | 13.04.2023 | ||
LU | 13.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
FR | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/09] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
GB | 13.04.2023 | ||
LU | 13.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/08] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
GB | 13.04.2023 | ||
LU | 13.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/04] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
LU | 13.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/50] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/49] | AT | 04.01.2023 | |
CZ | 04.01.2023 | ||
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/48] | AT | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/46] | AT | 04.01.2023 | |
DK | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/39] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/38] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/37] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/36] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/35] | AT | 04.01.2023 | |
ES | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
NO | 04.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/34] | ES | 04.01.2023 | |
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
PT | 04.05.2023 | ||
Former [2023/33] | ES | 04.01.2023 | |
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
Former [2023/31] | NL | 04.01.2023 | Documents cited: | Search | [A]US6973138 (WRIGHT ANDREW S [CA]) [A] 1-15 * figure 3 * * column 2, line 27 - line 39 * * column 6, line 5 - column 8, line 22 *; | [A]EP2254241 (NTT DOCOMO INC [JP]) [A] 1-15 * figure 2 * * paragraph [0010] - paragraph [0011] *; | [A]US2013077713 (KIM WAN-JONG [US], et al) [A] 8-11 * figure 2 ** paragraph [0019] - paragraph [0021] *; | [Y]US2014161005 (LAURENT-MICHEL STEPHANE [US]) [Y] 3-7,14 * figure 10 * * paragraph [0012] - paragraph [0014] * * paragraph [0062] - paragraph [0066] * * paragraph [0051] *; | [XYI] - LIU YING ET AL, "Novel Linearization Architecture with Limited ADC Dynamic Range for Green Power Amplifiers", IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, IEEE SERVICE CENTER, PISCATAWAY, US, vol. 34, no. 12, doi:10.1109/JSAC.2016.2600415, ISSN 0733-8716, (20161201), pages 3902 - 3914, (20161229), XP011638294 [X] 1,2,12,13,15 * figure 2 * * paragraph III.A Signal Cancellation * * paragraph III.B Signal Reconstruction * [Y] 3-7,14 [I] 8-11 DOI: http://dx.doi.org/10.1109/JSAC.2016.2600415 |