blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3557200

EP3557200 - LABORATORY BALANCE WITH A MOTORIZED DRAFT SHIELD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.08.2022
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  27.08.2021
FormerGrant of patent is intended
Status updated on  20.04.2021
FormerRequest for examination was made
Status updated on  01.05.2020
FormerThe application has been published
Status updated on  20.09.2019
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024  [2024/44]
Applicant(s)For all designated states
Mettler-Toledo GmbH
Im Langacher 44
8606 Greifensee / CH
[2019/43]
Inventor(s)01 / BUCHMANN, Alice
Falmenstrasse 4
8610 Uster / CH
02 / MEISTER, Beat
Murggenstrasse 23
8606 Nänikon / CH
03 / ZEHNDER, Marc
Knuesli-Gasse 1
8610 Uster / CH
04 / VOGT, Martin
Oberlandstrasse 64
8610 Uster / CH
 [2019/43]
Representative(s)Mettler-Toledo
IP Department
Im Langacher 44
8606 Greifensee / CH
[2019/43]
Application number, filing date18167732.917.04.2018
[2019/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3557200
Date:23.10.2019
Language:EN
[2019/43]
Type: B1 Patent specification 
No.:EP3557200
Date:29.09.2021
Language:EN
[2021/39]
Search report(s)(Supplementary) European search report - dispatched on:EP15.10.2018
ClassificationIPC:G01G21/28
[2019/43]
CPC:
G01G21/286 (EP,CN,US); G01G21/23 (CN,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/23]
Former [2019/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LABORWAAGE MIT MOTORISIERTEM WINDSCHUTZ[2019/43]
English:LABORATORY BALANCE WITH A MOTORIZED DRAFT SHIELD[2019/43]
French:BALANCE DE LABORATOIRE COMPORTANT UN ÉCRAN ANTI-COURANT D'AIR MOTORISÉ[2019/43]
Examination procedure23.04.2020Amendment by applicant (claims and/or description)
23.04.2020Examination requested  [2020/23]
23.04.2020Date on which the examining division has become responsible
21.04.2021Communication of intention to grant the patent
18.08.2021Fee for grant paid
18.08.2021Fee for publishing/printing paid
18.08.2021Receipt of the translation of the claim(s)
Opposition(s)30.06.2022No opposition filed within time limit [2022/36]
Fees paidRenewal fee
28.03.2020Renewal fee patent year 03
09.04.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.04.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
MT29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
TR29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
[2024/44]
Former [2024/29]HU17.04.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
TR29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
Former [2024/23]HU17.04.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
Former [2024/21]HU17.04.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
Former [2024/20]HU17.04.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
Former [2024/18]HU17.04.2018
AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
Former [2023/20]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
IE17.04.2022
LU17.04.2022
BE30.04.2022
Former [2023/10]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
LU17.04.2022
BE30.04.2022
Former [2023/08]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
LU17.04.2022
Former [2023/06]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/01]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/36]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/29]AL29.09.2021
AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/24]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/23]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
PT31.01.2022
Former [2022/21]AT29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/10]FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/09]FI29.09.2021
LT29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/08]FI29.09.2021
LT29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/07]LT29.09.2021
NO29.12.2021
Documents cited:Search[I]EP0234008  (METTLER INSTRUMENTE AG [CH]) [I] 1-14 * column 2, line 48 - column 4, line 44 * * figures 1-3 *;
 [A]WO02079735  (METTLER TOLEDO GMBH [CH], et al) [A] 1-14 * page 2, line 10 - page 3, line 8 * * page 6, line 11 - page 8, line 25 ** figures 2, 4, 5, 6, 7 *;
 [XI]WO2014038969  (LEWANDOWSKI WITOLD [PL]) [X] 1,4 * page 2, line 10 - line 29 * * page 3, line 9 - page 4, line 15 * * figures 1, 2 * [I] 2,3,5-14
by applicantUS4789034
 US5058692
 US5170855
 US6246018
 US6504112
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.