blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3392207

EP3392207 - SEQUENCING BATCH REACTOR FOR SEWAGE TREATMENT AND SEWAGE TREATMENT SYSTEM COMPRISING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.06.2021
Database last updated on 15.11.2024
FormerThe patent has been granted
Status updated on  26.06.2020
FormerGrant of patent is intended
Status updated on  22.06.2020
FormerExamination is in progress
Status updated on  20.05.2020
FormerGrant of patent is intended
Status updated on  23.01.2020
FormerExamination is in progress
Status updated on  19.04.2019
FormerRequest for examination was made
Status updated on  21.09.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Doosan Heavy Industries & Construction Co., Ltd.
22, Doosan volvo-ro
Seongsan-gu
Changwon-si, Gyeongsangnam-do 51711 / KR
[2018/43]
Inventor(s)01 / CHO, Hwan Chul
11-905, 24-6, Bangbae-ro 2-gil, Seocho-gu
06715 Seoul / KR
02 / JIN, Yang Oh
204-1704, 9, Jisam-ro 590beon-gil, Cheoin-gu
Yongin-si
17090 Gyeonggi-do / KR
03 / LEE, Chul Woo
108-804, 20, Byeongam-ro, Jinhae-gu, Changwon-si
51673 Gyeongsangnam-do / KR
04 / KIM, Seong Ju
16, Bukjangdae-ro, Jinju-si
52686 Gyeongsangnam-do / KR
 [2018/43]
Representative(s)Ter Meer Steinmeister & Partner
Patentanwälte mbB
Nymphenburger Straße 4
80335 München / DE
[2018/43]
Application number, filing date18167779.017.04.2018
[2018/43]
Priority number, dateKR2017004952218.04.2017         Original published format: KR 20170049522
KR2017007792920.06.2017         Original published format: KR 20170077929
[2018/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3392207
Date:24.10.2018
Language:EN
[2018/43]
Type: B1 Patent specification 
No.:EP3392207
Date:29.07.2020
Language:EN
[2020/31]
Search report(s)(Supplementary) European search report - dispatched on:EP02.07.2018
ClassificationIPC:C02F3/30, // C02F3/34, C02F103/00, C02F1/00, C02F1/38, C02F11/04, C02F11/12
[2018/43]
CPC:
C02F1/38 (EP,US); C02F1/44 (US); C02F3/1215 (US);
C02F3/20 (US); C02F3/282 (US); C02F3/305 (US);
C02F3/307 (EP,US); C02F3/341 (US); C02F3/348 (US);
C02F1/001 (EP,US); C02F11/04 (EP,US); C02F11/12 (EP,US);
C02F2101/166 (US); C02F2101/30 (US); Y02E50/30 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/06]
Former [2018/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SEQUENCING-BATCH-REACTOR ZUR ABWASSERBEHANDLUNG UND ABWASSERBEHANDLUNGSSYSTEM DAMIT[2018/43]
English:SEQUENCING BATCH REACTOR FOR SEWAGE TREATMENT AND SEWAGE TREATMENT SYSTEM COMPRISING SAME[2018/43]
French:RÉACTEUR DISCONTINU DE SÉQUENÇAGE POUR LE TRAITEMENT DES EAUX USÉES ET SYSTÈME DE TRAITEMENT DES EAUX USÉES COMPRENANT CELUI-CI[2018/43]
Examination procedure17.04.2018Examination requested  [2018/43]
17.04.2018Date on which the examining division has become responsible
21.12.2018Amendment by applicant (claims and/or description)
25.04.2019Despatch of a communication from the examining division (Time limit: M04)
29.08.2019Reply to a communication from the examining division
24.01.2020Communication of intention to grant the patent
19.05.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
19.05.2020Fee for grant paid
19.05.2020Fee for publishing/printing paid
22.06.2020Information about intention to grant a patent
22.06.2020Receipt of the translation of the claim(s)
Opposition(s)30.04.2021No opposition filed within time limit [2021/27]
Fees paidRenewal fee
10.03.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.04.2018
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
MT29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
[2024/42]
Former [2024/29]HU17.04.2018
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
Former [2024/23]HU17.04.2018
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
Former [2023/33]HU17.04.2018
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
Former [2023/30]AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
Former [2022/23]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
Former [2022/21]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
IE17.04.2021
LU17.04.2021
Former [2022/10]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
LU17.04.2021
Former [2022/04]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
LU17.04.2021
Former [2021/50]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/36]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/28]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/25]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/22]AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/20]AT29.07.2020
DK29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/17]AT29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/10]AT29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/09]AT29.07.2020
ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
Former [2021/08]ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
PT30.11.2020
Former [2021/07]FI29.07.2020
LT29.07.2020
NO29.10.2020
Documents cited:Search[XYI]US2014305867  (NYHUIS GEERT [CH]) [X] 1-3,5,7-9 * paragraph [0053] - paragraph [0056]; figures 1-3 * [Y] 10-15 [I] 4,6;
 [A]  - M. HAN ET AL, "Uncoupling the solids retention times of flocs and granules in mainstream deammonification: A screen as effective out-selection tool for nitrite oxidizing bacteria", BIORESOURCE TECHNOLOGY, AMSTERDAM, NL, (20160901), vol. 221, doi:10.1016/j.biortech.2016.08.115, ISSN 0960-8524, pages 195 - 204, XP055485591 [A] 1-15 * abstract *

DOI:   http://dx.doi.org/10.1016/j.biortech.2016.08.115
 [YA]  - S. E. VLAEMINCK ET AL, "Microbial resource management of one-stage partial nitritation/anammox", MICROBIAL BIOTECHNOLOGY, (20120327), vol. 5, no. 3, doi:10.1111/j.1751-7915.2012.00341.x, ISSN 1751-7915, pages 433 - 448, XP055058711 [Y] 10-15 * Introduction; page 433; figure 4 * * Bridging paragraph; page 444 * * page 440 - column right * [A] 1-9

DOI:   http://dx.doi.org/10.1111/j.1751-7915.2012.00341.x
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.