EP3401461 - INTERLOCKING ROOF TILE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.01.2022 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 29.01.2021 | ||
Former | Grant of patent is intended Status updated on 30.09.2020 | ||
Former | Examination is in progress Status updated on 31.03.2020 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The application has been published Status updated on 12.10.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states ERLUS AKTIENGESELLSCHAFT Hauptstrasse 106 84088 Neufahrn / DE | [2018/46] | Inventor(s) | 01 /
HACKER, Alois Industriestrasse 25 84061 Ergoldsbach / DE | 02 /
TRÖGER, Dieter Oberellenbach 201 84066 Mallersdorf-Pfaffenberg / DE | [2019/39] |
Former [2018/46] | 01 /
HACKER, Alois Brühfeldweg 9 84036 Landshut / DE | ||
02 /
TRÖGER, Dieter Oberellenbach 201 84066 Mallersdorf-Pfaffenberg / DE | Representative(s) | Louis Pöhlau Lohrentz Patentanwälte Merianstrasse 26 90409 Nürnberg / DE | [2018/46] | Application number, filing date | 18170913.0 | 04.05.2018 | [2018/46] | Priority number, date | DE201720102762U | 09.05.2017 Original published format: DE 202017102762 U | [2018/46] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3401461 | Date: | 14.11.2018 | Language: | DE | [2018/46] | Type: | B1 Patent specification | No.: | EP3401461 | Date: | 03.03.2021 | Language: | DE | [2021/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.09.2018 | Classification | IPC: | E04D1/04 | [2018/46] | CPC: |
E04D1/2916 (EP,US);
E04D1/04 (AT);
E04D1/2949 (EP,US);
E04D1/2918 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] |
Former [2018/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FALZDACHZIEGEL | [2018/46] | English: | INTERLOCKING ROOF TILE | [2018/46] | French: | TUILE DE TOIT À EMBOÎTEMENT | [2018/46] | Examination procedure | 28.11.2018 | Amendment by applicant (claims and/or description) | 28.11.2018 | Examination requested [2019/02] | 28.11.2018 | Date on which the examining division has become responsible | 03.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 10.06.2020 | Reply to a communication from the examining division | 01.10.2020 | Communication of intention to grant the patent | 25.01.2021 | Fee for grant paid | 25.01.2021 | Fee for publishing/printing paid | 25.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.12.2021 | No opposition filed within time limit [2022/06] | Fees paid | Renewal fee | 10.03.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 03.03.2021 | CY | 03.03.2021 | EE | 03.03.2021 | ES | 03.03.2021 | FI | 03.03.2021 | HR | 03.03.2021 | LT | 03.03.2021 | LV | 03.03.2021 | MC | 03.03.2021 | MK | 03.03.2021 | RO | 03.03.2021 | RS | 03.03.2021 | SE | 03.03.2021 | SK | 03.03.2021 | SM | 03.03.2021 | TR | 03.03.2021 | IE | 04.05.2021 | LU | 04.05.2021 | BG | 03.06.2021 | NO | 03.06.2021 | GR | 04.06.2021 | IS | 03.07.2021 | PT | 05.07.2021 | [2024/29] |
Former [2024/23] | AL | 03.03.2021 | |
CY | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
MK | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
IE | 04.05.2021 | ||
LU | 04.05.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2023/30] | AL | 03.03.2021 | |
CY | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
IE | 04.05.2021 | ||
LU | 04.05.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/23] | AL | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
IE | 04.05.2021 | ||
LU | 04.05.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/21] | AL | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
IE | 04.05.2021 | ||
LU | 04.05.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/10] | AL | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
LU | 04.05.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/08] | AL | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
LU | 04.05.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/07] | AL | 03.03.2021 | |
EE | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2021/51] | EE | 03.03.2021 | |
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2021/50] | EE | 03.03.2021 | |
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2021/48] | EE | 03.03.2021 | |
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/46] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/38] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/37] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RS | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/36] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/35] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
NO | 03.06.2021 | ||
Former [2021/33] | FI | 03.03.2021 | |
LT | 03.03.2021 | ||
NO | 03.06.2021 | Documents cited: | Search | [Y]DE182316 (FRANZ MIETZE) [Y] 1-15 * figures 1-5 *; | [Y]FR576617 (R.E.J. GENONCEAUX) [Y] 3,5 * column 2, lines 50-51 *; | [A]DE493617 (CARL LUDOWICI K A A) [A] 1-15* figures 1-2 *; | [A]DE910214 (JOSEF MEINDL TON UND SAEGEWERK) [A] 12,13 * figure 1 *; | [A]DE916730 (LUDWIG FRANZ LUDOWICI) [A] 1-15 * figures 1-3 *; | [Y]DE1869544U (LUDOWICI MICHAEL CHRISTIAN [DE]) [Y] 1-15 * figures 1-4 *; | [Y]FR2335670 (ROUMAZIERES TUILERIE BRIQUETE [FR]) [Y] 3,5 * page 3, lines 24-25 *; | [Y]EP0445666 (WACKER HEINZ [DE]) [Y] 1,8 * figures 1,11 *; | [Y]EP1953304 (SEGL THEO [DE]) [Y] 2,9,11 * paragraphs [0026] , [0029]; figures 3,5 *; | [YD]DE102013010169 (ERLUS AG [DE]) [YD] 14 * figure 1 * | by applicant | DE102013010169 |