blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3409901

EP3409901 - CLEARANCE CONTROL ARRANGEMENT AND CORRESPONDING GAS TURBINE ENGINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.01.2022
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  12.02.2021
FormerGrant of patent is intended
Status updated on  28.01.2021
FormerRequest for examination was made
Status updated on  07.06.2019
FormerThe application has been published
Status updated on  02.11.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Rolls-Royce plc
Kings Place
90 York Way
London N1 9FX / GB
[2020/09]
Former [2018/49]For all designated states
Rolls-Royce plc
62 Buckingham Gate
London SW1E 6AT / GB
Inventor(s)01 / Lewis, Leo
c/o Rolls-Royce plc
PO Box 31
Derby, Derbyshire DE24 8BJ / GB
02 / Gopalkrishna, Vinod
c/o Rolls-Royce plc
PO Box 31
Derby, Derbyshire DE24 8BJ / GB
 [2018/49]
Representative(s)Rolls-Royce plc
Moor Lane (ML-9)
PO Box 31
Derby DE24 8BJ / GB
[N/P]
Former [2018/49]Rolls-Royce plc
Intellectual Property Dept SinA-48
PO Box 31
Derby DE24 8BJ / GB
Application number, filing date18171197.908.05.2018
[2018/49]
Priority number, dateGB2017000874601.06.2017         Original published format: GB 201708746
[2018/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3409901
Date:05.12.2018
Language:EN
[2018/49]
Type: B1 Patent specification 
No.:EP3409901
Date:17.03.2021
Language:EN
[2021/11]
Search report(s)(Supplementary) European search report - dispatched on:EP12.10.2018
ClassificationIPC:F01D11/00, F01D11/10, F01D11/24, F01D25/24
[2018/49]
CPC:
F01D11/24 (EP,US); F01D11/005 (EP,US); F01D11/025 (US);
F01D11/10 (EP,US); F01D25/246 (EP,US); F05D2220/32 (US);
F05D2240/11 (EP,US); F05D2260/201 (US); F05D2260/231 (EP,US);
Y02T50/60 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/28]
Former [2018/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABSTANDSREGELUNGSANORDNUNG UND ZUGEHÖRIGES GASTURBINENTRIEBWERK[2018/49]
English:CLEARANCE CONTROL ARRANGEMENT AND CORRESPONDING GAS TURBINE ENGINE[2018/49]
French:AGENCEMENT DE CONTRÔLE DU JEU ET MOTEUR Á TURBINE Á GAZ ASSOCIÉ[2018/49]
Examination procedure03.06.2019Examination requested  [2019/28]
03.06.2019Date on which the examining division has become responsible
29.01.2021Communication of intention to grant the patent
09.02.2021Fee for grant paid
09.02.2021Fee for publishing/printing paid
09.02.2021Receipt of the translation of the claim(s)
Opposition(s)20.12.2021No opposition filed within time limit [2022/08]
Fees paidRenewal fee
28.05.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.05.2018
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
MT17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
[2024/42]
Former [2024/23]HU08.05.2018
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/33]HU08.05.2018
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/30]AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/34]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/23]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/21]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE08.05.2021
LU08.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/11]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
LU08.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/10]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU08.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/08]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU08.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/07]AL17.03.2021
AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/52]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/51]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/50]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2021/48]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/46]AT17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/43]FI17.03.2021
HR17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/38]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/37]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/36]FI17.03.2021
HR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/35]FI17.03.2021
HR17.03.2021
NO17.06.2021
Former [2021/33]FI17.03.2021
NO17.06.2021
Documents cited:Search[XYI]US2003031557  (ARILLA JEAN-BAPTISTE [FR], et al) [X] 1,3-6,8-12,14,15 * figures 1, 5-7; claim 1 * * paragraph [0025] - paragraph [0030] * [Y] 13 [I] 2,7;
 [Y]US2011229306  (LEWIS LEO V [GB], et al) [Y] 13* figures 1, 6, 7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.