blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3418755

EP3418755 - MONITORING SYSTEM TO MONITOR THE CONDITION OF AN INDUSTRIAL WIRING SYSTEM AND CORRESPONDING INDUSTRIAL WIRING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  21.10.2019
FormerRequest for examination was made
Status updated on  28.06.2019
FormerThe application has been published
Status updated on  23.11.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Tecnikabel S.p.A.
Via Ettore De Sonnaz, 19
10121 Torino / IT
[2018/52]
Inventor(s)01 / GARIBOLDI, Roberto
Via Artigianato, 11
26836 MONTANASO LOMBARDO (LO) / IT
02 / BENTIVOGLIO, Davide
Via Fornaci, 18/B
10036 SETTIMO TORINESE (TO) / IT
 [2018/52]
Representative(s)Nannucci, Lorenzo, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[2018/52]
Application number, filing date18173056.517.05.2018
[2018/52]
Priority number, dateIT2017005325917.05.2017         Original published format: IT201700053259
[2018/52]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3418755
Date:26.12.2018
Language:EN
[2018/52]
Type: B1 Patent specification 
No.:EP3418755
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)(Supplementary) European search report - dispatched on:EP28.11.2018
ClassificationIPC:G01R31/02, H02H7/00, H02H3/30, H02H5/10
[2019/44]
CPC:
G01R31/58 (EP,US); H02H11/001 (US); H02H5/10 (EP,US)
Former IPC [2018/52]G01R31/02, H02H7/00, H02H3/30
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/31]
Former [2018/52]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ÜBERWACHUNGSSYSTEM ZUR ÜBERWACHUNG DES ZUSTANDS EINES INDUSTRIELLEN VERDRAHTUNGSSYSTEMS UND ENTSPRECHENDES INDUSTRIELLES VERDRAHTUNGSSYSTEM[2018/52]
English:MONITORING SYSTEM TO MONITOR THE CONDITION OF AN INDUSTRIAL WIRING SYSTEM AND CORRESPONDING INDUSTRIAL WIRING SYSTEM[2018/52]
French:SYSTÈME DE SURVEILLANCE POUR SURVEILLER L'ÉTAT D'UN SYSTÈME DE CÂBLAGE INDUSTRIEL ET SYSTÈME DE CÂBLAGE INDUSTRIEL CORRESPONDANT[2018/52]
Examination procedure25.06.2019Examination requested  [2019/31]
25.06.2019Date on which the examining division has become responsible
22.10.2019Communication of intention to grant the patent
26.02.2020Fee for grant paid
26.02.2020Fee for publishing/printing paid
26.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.05.2018
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
IE17.05.2020
LU17.05.2020
BE31.05.2020
FR08.06.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
[2022/33]
Former [2022/27]HU17.05.2018
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MT08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
IE17.05.2020
LU17.05.2020
BE31.05.2020
FR08.06.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/23]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
IE17.05.2020
LU17.05.2020
BE31.05.2020
FR08.06.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/20]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
IE17.05.2020
LU17.05.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/15]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
LU17.05.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
NL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/08]AL08.04.2020
DK08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
RS08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
NL08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/48]FI08.04.2020
LT08.04.2020
NL08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
NO08.07.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Documents cited:Search[A]FR602929  (JOSEF SEJVL) [A] 1 * figure 1 *;
 [A]GB568336  (WILFRID BROOKE, et al) [A] 1* figure 1 *;
 [A]FR933590  (MINES DOMANIALES DE POTASSE) [A] 1 * figures 1, 2, 5, 6 *;
 [A]GB716516  (MERLIN GERIN) [A] 1 * figures 1, 2 *;
 [A]DE966596  (SIEMENS AG) [A] 1 * figures 1, 2 *;
 [A]US4011483  (MEADOWS SAMUEL K) [A] 1 * figure 1 *;
 [A]US4228475  (SHERWOOD JOHN R) [A] 1 * figures 1, 2 *;
 [A]CA1193322  (AMF INC) [A] 1 * figures 1, 2 *
by applicantIT20160093633
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.