blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3409443

EP3409443 - MANUFACTURING METHOD FOR AN AESTHETIC STRUCTURAL PART AND AN AESTHETIC STRUCTURAL PART [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.08.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  03.09.2021
FormerGrant of patent is intended
Status updated on  27.04.2021
FormerExamination is in progress
Status updated on  14.08.2019
FormerRequest for examination was made
Status updated on  14.06.2019
FormerThe application has been published
Status updated on  02.11.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Thermo King Corporation
314 West 90th Street
Minneapolis, MN 55420 / US
[2018/49]
Inventor(s)01 / PACKIARAJAN, Selvam
9888 Pincherry Lane
Eden Prairie, MN 55347 / US
 [2018/49]
Representative(s)Haseltine Lake Kempner LLP
One Portwall Square
Portwall Lane
Bristol BS1 6BH / GB
[N/P]
Former [2021/40]Haseltine Lake Kempner LLP
Redcliff Quay
120 Redcliff Street
Bristol BS1 6HU / GB
Former [2018/49]Haseltine Lake LLP
Redcliff Quay 120 Redcliff Street
Bristol BS1 6HU / GB
Application number, filing date18175503.401.06.2018
[2018/49]
Priority number, dateUS20171561106601.06.2017         Original published format: US201715611066
[2018/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3409443
Date:05.12.2018
Language:EN
[2018/49]
Type: B1 Patent specification 
No.:EP3409443
Date:06.10.2021
Language:EN
[2021/40]
Search report(s)(Supplementary) European search report - dispatched on:EP24.07.2018
ClassificationIPC:B29C51/14, B29C45/14, B29L31/00
[2018/49]
CPC:
B29C45/1418 (EP,US); B29C69/02 (US); B32B27/08 (US);
B32B27/302 (US); B32B27/365 (US); B29C2045/14155 (EP,US);
B29C45/14688 (EP,US); B29C51/14 (EP,US); B29C51/264 (EP,US);
B29C51/266 (EP,US); B29K2055/02 (US); B29K2069/00 (US);
B29K2105/08 (US); B29K2105/12 (EP,US); B29L2031/737 (EP,US);
B29L2031/74 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/29]
Former [2018/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES ÄSTHETISCHEN PRODUKTES UND ÄSTHETISCHES PRODUKT[2021/20]
English:MANUFACTURING METHOD FOR AN AESTHETIC STRUCTURAL PART AND AN AESTHETIC STRUCTURAL PART[2018/49]
French:PROCÉDÉ DE FABRICATION D'UN PRODUIT ESTHÉTIQUE ET UN PRODUIT ESTHÉTIQUE[2021/21]
Former [2018/49]HERSTELLUNGSVERFAHREN FÜR EIN ÄSTHETISCHES BAUTEIL UND EIN ÄSTHETISCHES BAUTEIL
Former [2018/49]PROCÉDÉ DE FABRICATION D'UNE PIÈCE STRUCTURALE ESTHÉTIQUE ET PIÈCE STRUCTURALE ESTHÉTIQUE
Examination procedure05.06.2019Examination requested  [2019/29]
05.06.2019Date on which the examining division has become responsible
20.08.2019Despatch of a communication from the examining division (Time limit: M04)
02.01.2020Reply to a communication from the examining division
10.03.2020Despatch of a communication from the examining division (Time limit: M04)
09.07.2020Reply to a communication from the examining division
05.08.2020Despatch of a communication from the examining division (Time limit: M04)
16.11.2020Reply to a communication from the examining division
28.04.2021Communication of intention to grant the patent
19.08.2021Fee for grant paid
19.08.2021Fee for publishing/printing paid
19.08.2021Receipt of the translation of the claim(s)
Opposition(s)07.07.2022No opposition filed within time limit [2022/37]
Fees paidRenewal fee
22.06.2020Renewal fee patent year 03
23.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.06.2018
AL06.10.2021
AT06.10.2021
CY06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
IT06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
MK06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE01.06.2022
LU01.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
[2024/23]
Former [2024/20]HU01.06.2018
AL06.10.2021
AT06.10.2021
CY06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
IT06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE01.06.2022
LU01.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2024/18]HU01.06.2018
AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
IT06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE01.06.2022
LU01.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/25]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
IT06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE01.06.2022
LU01.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/21]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE01.06.2022
LU01.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/20]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE01.06.2022
Former [2023/08]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2023/01]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/49]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/35]AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/34]AT06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/33]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RS06.10.2021
SE06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/25]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RS06.10.2021
SE06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/24]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
NL06.10.2021
PL06.10.2021
RS06.10.2021
SE06.10.2021
BG06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/23]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RS06.10.2021
BG06.01.2022
PT07.02.2022
Former [2022/22]AT06.10.2021
FI06.10.2021
LT06.10.2021
RS06.10.2021
BG06.01.2022
Former [2022/21]AT06.10.2021
RS06.10.2021
BG06.01.2022
Former [2022/19]BG06.01.2022
Documents cited:Search[A]US3631580  (SWARTZ WILLIAM M) [A] 1* column 2, paragraphs 1-3 *;
 [X]GB2010169  (YOSHIDA KOGYO KK) [X] 1,2 * figures 1-6; claims 8-14 *;
 [X]JPS57129731  (MATSUSHITA ELECTRIC IND CO LTD) [X] 1,2 * figures 1-4 *;
 [X]JPS59202834  (YOSHIDA KOGYO KK) [X] 1,6,11,15 * paragraph [0001]; figures 1-20; claim 1 *;
 [XA]JPH05131489  (MITSUBISHI GAS CHEMICAL CO) [X] 1,7 * paragraphs [0001] , [0005] , [0008] , [0014] , [0015] * [A] 12;
 [A]JPH05329882  (TORAY INDUSTRIES) [A] 3-5,7 * paragraphs [0018] - [0020]; example 1 *;
 [X]US6132662  (PREISLER DARIUS J [US], et al) [X] 1,3,6,9,11,13-15 * figure 2; claim 1 *;
 [X]DE102009022542  (LEONHARD KURZ STIFTUNG & CO KG [DE]) [X] 7,11,12 * paragraphs [0003] , [0034] *;
 [X]  - Leonhard KURZ Stiftung &CO, "INSERT MOLDING BY LEONHARD KURZ", (20160909), URL: https://www.youtube.com/watch?v=fM2mX18pfsk, (20180620), XP002782636 [X] 1,2,6,7,11-13 * the whole document *
 [A]  - Hui Boon Kwa, "INEOS STYROLUTION HELPS E-HWA BRING BRILLIANCE TO THE FRONT GRILL OF HYUNDAI'S NEW KIA K5", (20160621), URL: http://www.ineos-styrolution.com/INTERSHOP/static/WFS/Styrolution-Portal-Site/-/Styrolution-Portal/it_IT/News%20and%20media/download/Hyundai_PR_17_06_2016.pdf, (20180620), XP002782637 [A] 7,13 * the whole document *
ExaminationDE102015208945
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.